[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148704":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1148704,802,1,"单选题","沉井下沉施工时，挖土应分层、均匀、对称进行；对于有底梁或支撑梁沉井，其相邻格仓高差不宜超过（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","0.3m",false,{"key":16,"text":17,"correct":14},"B","0.2m",{"key":19,"text":20,"correct":14},"C","0.4m",{"key":22,"text":23,"correct":24},"D","0.5m",true,"2020教材P196 \u002F 2019教材P197 （3）挖土应分层、对称、均匀进行，对于有底梁或支撑梁沉井，其相邻格仓高差不宜超过0.5m。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]