[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148692":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1148692,802,1,"单选题","关于预制拼装给水排水构筑物现浇板缝施工说法，不正确的有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","板缝部位混凝土表面不用凿毛",true,{"key":16,"text":17,"correct":18},"B","外模应分段随浇随支",false,{"key":20,"text":21,"correct":18},"C","内模一次安装到位",{"key":23,"text":24,"correct":18},"D","宜采用微膨胀水泥","2020教材P192 \u002F 2019教材P194 （1）壁板接缝的内模宜一次安装到顶；外模应分段随浇随支。分段支模高度不宜超过1.5m。（2）浇筑前，接缝的壁板表面应洒水保持湿润，模内应洁净；接缝的混凝土强度应符合设计规定，设计无要求时，应比壁板混凝土强度提高一级。（3）浇筑时间应根据气温和混凝土温度选在壁板间缝宽较大时进行；混凝土如有离析现象，应进行二次拌合；混凝土分层浇筑厚度不宜超过250mm，并应采用机械振捣，配合工捣固。（4）用于接头或拼缝的混凝土或砂浆，宜采取微膨胀和快速水泥，在浇筑过程中应振捣密实并采取必要的养护措施。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]