[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148635":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1148635,802,1,"单选题","浅埋暗挖法施工时，处于砂砾地层，并穿越既有铁路，宜采用的辅助施工方法是（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","地面砂浆锚杆",false,{"key":16,"text":17,"correct":14},"B","小导管注浆加固",{"key":19,"text":20,"correct":21},"C","管棚超前支护",true,{"key":23,"text":24,"correct":14},"D","降低地下水位","2020教材P172 \u002F 2019教材P174 （2）通常，在下列施工场合应考虑采用管棚进行超前支护：1）穿越铁路修建地下工程;2）穿越地下和地面结构物修建地下工程;3）修建大断面地下工程;4）隧道洞口段施工;5）通过断层破碎带等特殊地层;6）特殊地段，如大跨度地铁车站、重要文物保护区、河底、海底的地下工程施工等。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]