[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148607":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1148607,802,1,"单选题","关于管片拼装顺序以下说法错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","最后安装邻接管片",true,{"key":16,"text":17,"correct":18},"B","先安装下部的标准管片",false,{"key":20,"text":21,"correct":18},"C","最后安装楔形管片",{"key":23,"text":24,"correct":18},"D","然后交替安装左右两侧标准管片","2020教材P155 \u002F 2019教材P157 2.拼装顺序：一般从下部的标准（A型）管片开始，依次左右两侧交替安装标准管片，然后拼装邻接（B型）管片，最后安装楔形（K型）管片。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]