[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148545":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1148545,802,1,"单选题","斜拉桥索塔的施工可视其结构、体形、材料、施工设备和设计要求综合考虑，选用适合的方法，横梁较多的高塔，宜采用()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","爬模法",false,{"key":16,"text":17,"correct":18},"B","劲性骨架挂模提升法",true,{"key":20,"text":21,"correct":14},"C","支架法",{"key":23,"text":24,"correct":14},"D","悬臂浇筑法","2020\u002F2019教材P89 1）索塔的施工可视其结构、体形、材料、施工设备和设计要求综合考虑，选用适合的方法。裸塔施工宜用爬模法，横梁较多的高塔，宜采用劲性骨架挂模提升法。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]