[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148543":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1148543,802,1,"单选题","安装钢—混凝土组合梁的钢梁时，工地焊接连接的焊接顺序宜为()对称进行。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","纵向从跨中向两端、横向从两侧向中线",false,{"key":16,"text":17,"correct":14},"B","纵向从两端向跨中、横向从中线向两侧",{"key":19,"text":20,"correct":21},"C","纵向从跨中向两端、横向从中线向两侧",true,{"key":23,"text":24,"correct":14},"D","横向从两端向跨中、纵向从中线向两侧","2020\u002F2019教材P83 8）钢梁杆件工地焊缝连接，应按设计的顺序进行。无设计顺序时，焊接顺序宜为纵向从跨中向两端、横向从中线向两侧对称进行；且符合现行行标《城市桥梁工程施工与质量规范》CJJ 2—2008第14.2.5条规定。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]