[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148532":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1148532,802,1,"单选题","人工挖孔桩施工时，浇筑的护壁混凝土结构强度大于()MPa后方可拆除其模板。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","2.0",false,{"key":16,"text":17,"correct":14},"B","2.5",{"key":19,"text":20,"correct":14},"C","4.0",{"key":22,"text":23,"correct":24},"D","5.0",true,"2020\u002F2019教材P72 3.（3）采用混凝土或钢筋混凝土支护孔壁技术，护壁的厚度、拉接钢筋、配筋、混凝土强度等级均应符合设计要求；井圈中心线与设计轴线的偏差不得大于20mm;上下节护壁混凝土的搭接长度不得小于50mm;每节护壁必须保证振捣密实，并应当日施工完毕；应根据土层渗水情况使用速凝剂；模板拆除应在混凝土强度大于5.0MPa后进行。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]