[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148519":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1148519,802,1,"单选题","钻孔灌注桩施工中，成孔后压灌混凝土并将钢筋笼插至设计深度成桩的方法是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","旋挖钻",false,{"key":16,"text":17,"correct":14},"B","潜水钻",{"key":19,"text":20,"correct":21},"C","螺旋钻",true,{"key":23,"text":24,"correct":14},"D","冲抓钻","2020\u002F2019教材P72 1.长螺旋钻孔(1)钻机定位后，应进行复检，钻头与桩位点偏差不得大于20mm，开孔时下钻速度应缓慢；钻进过程中，不宜反转或提升钻杆。(2)在钻进过程中遇到卡钻、钻机摇晃、偏斜或发生异常声响时，应立即停钻，查明原因，采取相应措施后方可继续作业。(3)钻至设计标高后，应先泵入混凝土并停顿10-20s，再缓慢提升钻杆。提钻速度应根据土层情况确定，并保证管内有一定高度的混凝土。(4)混凝土压灌结束后，应立即将钢筋笼插至设计深度，并及时清除钻杆及泵（软）管内残留混凝土。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]