[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148419":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1148419,802,1,"单选题","当路基施工现场地下水位较高、处于过湿状态时，可设置隔离层或采取疏干措施，在以下方法中不属于该方法的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","深层水泥搅拌桩",true,{"key":16,"text":17,"correct":18},"B","土工织物",false,{"key":20,"text":21,"correct":18},"C","塑料板排水",{"key":23,"text":24,"correct":18},"D","超载预压法","2020教材P23 \u002F 2019教材P22 （2）地下水位或地面积水水位较高，路基处于过湿状态、或强度与稳定性不符合要求的潮湿状态时，可设置隔离层或采取疏干等措施。可采用土工织物、塑料板等材料疏干或超载预压提高承载能力与稳定性。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]