[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148403":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1148403,802,1,"单选题","下列选项中，沿路基横断面方向路基碾压顺序正确的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","自路基一边向另一边顺序进行",false,{"key":16,"text":17,"correct":14},"B","自路基中心向两边交替进行",{"key":19,"text":20,"correct":14},"C","自路基中心向两边同时进行",{"key":22,"text":23,"correct":24},"D","自路基两边向中心进行",true,"2020\u002F2019教材P18 （三）（3）碾压应从路基边缘向中央进行，压路机轮外缘距路基边应保持安全距离。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]