[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148329":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1148329,802,1,"单选题","（ ）是项目管理的核心内容。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","质量管理",false,{"key":16,"text":17,"correct":14},"B","工期管理",{"key":19,"text":20,"correct":14},"C","安全管理",{"key":22,"text":23,"correct":24},"D","成本管理",true,"本题考查的是施工成本管理的应用。施工项目管理的最终目标是建成质量好、工期短、安全的、成本低的工程产品，而成本是项目管理中的重中之重，成本管理是项目管理的核心内容。教材P301。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]