[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148274":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1148274,802,1,"单选题","关于施工平面控制网的说法，不符合规范规定的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","坐标系统应与工程设计所采用的坐标系统相同",false,{"key":16,"text":17,"correct":14},"B","当利用原有的平面控制网时，应进行复测",{"key":19,"text":20,"correct":14},"C","场地大于1km2时，宜建立一级导线精度的平面控制网",{"key":22,"text":23,"correct":24},"D","场地为重要工业区时，宜建立二级导线精度的平面控制网",true,"本题考查的是场区控制测量。场地大于1km2或重要工业区，宜建立相当于一级导线精度的平面控制网。教材P269。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]