[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148243":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1148243,802,1,"单选题","定向钻施工要点错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","钻机必须进行试运转",false,{"key":16,"text":17,"correct":14},"B","第一根钻杆入土钻进时，采取轻压慢转方式",{"key":19,"text":20,"correct":14},"C","终孔孔径宜控制在回拖管节外径的1.2～1.5倍",{"key":22,"text":23,"correct":24},"D","发送装置必须采用水力发送沟形式",true,"本题考查的是燃气管道非开挖铺设施工要点。选项D错误，发送装置可采用水力发送沟、滚筒管架发送道等形式。教材P238、P408。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]