[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148183":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1148183,802,1,"单选题","下面关于管涵施工技术要点错误的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","当管涵设计为砼或砌体基础时，基础上面应设砼管座，其顶部弧形面与管身紧密贴合",false,{"key":16,"text":17,"correct":14},"B","当管涵为砼基础，管体直接设置在天然地基上时，应做成与管身弧度密贴的弧形管座。",{"key":19,"text":20,"correct":21},"C","管涵的沉降缝不得设在管节接缝处",true,{"key":23,"text":24,"correct":14},"D","管涵进出水口沟床应整理直顺","本题考查的是管涵施工技术要点。管涵的沉降缝应设在管节接缝处。教材P92。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]