[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148111":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1148111,802,1,"单选题","（2015 年真题）根据《建筑工程工程测量清单计价桂发》（GB0500-2013），下列措施项目费用中不能作为竞争性费用的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","脚手架工程费",false,{"key":16,"text":17,"correct":14},"B","夜间施工增加费",{"key":19,"text":20,"correct":21},"C","安全文明施工费",true,{"key":23,"text":24,"correct":14},"D","冬、雨期施工增加费","本题考查的是市政公用工程工程量清单计价的应用。措施项目中的安全文明施工费必须按国家或省级、行业建设主管部门的规定计算，不得作为竞争性费用。",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]