[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148092":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1148092,802,1,"单选题","（2017 年真题）生活垃圾填埋场填埋区防渗系统结构层,自上而下材料排序,正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","土工布、GCL 热,HDPE 膜",false,{"key":16,"text":17,"correct":18},"B","土工布、HDPE 膜、GCL 垫",true,{"key":20,"text":21,"correct":14},"C","HDPE 膜、土工布、GCL 垫",{"key":23,"text":24,"correct":14},"D","HDPE 膜、GCL 垫、土工布","考查生活垃圾填埋场填埋区防渗系统结构层",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]