[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1148052":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1148052,802,1,"单选题","（2019 年真题）关于沉井施工分节制作工艺的说法，正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","第一节制作高度必须与刃脚部分齐平",false,{"key":16,"text":17,"correct":14},"B","设计无要求时，混凝土强度应达到设计强度等级60%，方可拆除模板",{"key":19,"text":20,"correct":21},"C","混凝土施工缝应采用凹凸缝并应凿毛清理干净",true,{"key":23,"text":24,"correct":14},"D","设计要求分多节制作的沉井，必须全部接高后方可下沉","P197。分节制作沉井：1）每节制作高度应符合施工方案要求且第一节制作高度必须高于刃脚部分；井内设有底梁或支撑梁时应与刃脚部分整体浇捣。2）设计无要求时，混凝土强度应达到设计强度等级75%后，方可拆除模板或浇筑后节混凝土。3）混凝土施工缝处理应采用凹凸缝或设置钢板止水带，施工缝应凿毛并清理干净；内外模板采用对拉螺栓固定时，其对拉螺栓的中间应设置防渗止水片；钢筋密集部位和预留孔底部应辅以人工振捣，保证结构密实。4）沉井每次接高时各部位的轴线位置应一致、重合，及时做好沉降和位移监测；必要时应对刃脚地基承载力进行验算，并采取相应措施确保地基及结构的稳定。5）分节制作、分次下沉的沉井，前次下沉后进行后续接高施工",{"id":6,"name":27,"category":28,"favorite":29},"一建市政公用工程实务","建筑工程",0]