[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-801-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},801,"一建矿业工程实务","建筑工程",0,9,50,1603,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,271,283,295,307,319,331,343,355,367,379,391,403,415,427,439,451,463,475,487,499,511,523,535,547,559,571,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1146529,1,"单选题","下列地下建筑工程的防水方法，属于自防水的是（）防水。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","卷材防水层",false,{"key":24,"text":25,"correct":26},"B","普通防水混凝土",true,{"key":28,"text":29,"correct":22},"C","涂膜防水层",{"key":31,"text":32,"correct":22},"D","防水砂浆抹面","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1146530,"混凝土中配置钢筋主要是代替混凝土（）或协助混凝土受压，提高构件的承载力并改善其受力性能。",[38,40,42,44],{"key":20,"text":39,"correct":26},"受拉",{"key":24,"text":41,"correct":22},"受压",{"key":28,"text":43,"correct":22},"中部",{"key":31,"text":45,"correct":22},"上部",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1146531,"钢筋混凝土结构中，光面钢筋的粘结力主要是（）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"胶结力和摩擦力",{"key":24,"text":53,"correct":22},"咬合力和摩擦力",{"key":28,"text":55,"correct":22},"胶结力和咬合力",{"key":31,"text":57,"correct":22},"拉拔力和预压力",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1146532,"钢结构具有的特点是（）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"耐热、不防火",{"key":24,"text":65,"correct":22},"防火、不耐热",{"key":28,"text":67,"correct":22},"抗腐蚀、易密封",{"key":31,"text":69,"correct":22},"不易密封、耐腐蚀",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1146533,"钢结构连接方式能直接承受动力荷载的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"普通螺栓",{"key":24,"text":77,"correct":22},"焊缝连接",{"key":28,"text":79,"correct":22},"高强度螺栓承压型连接",{"key":31,"text":81,"correct":26},"高强度螺栓摩擦型连接",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1146534,"厂房结构的节间吊装法的优点是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"准备工作简单",{"key":24,"text":89,"correct":22},"构件吊装效率高",{"key":28,"text":91,"correct":26},"起重机开行路线短",{"key":31,"text":93,"correct":22},"管理方便",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1146535,"多层厂房在拟定结构吊装方案时，主导的内容是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"结构吊装方法",{"key":24,"text":101,"correct":22},"构件的吊装顺序",{"key":28,"text":103,"correct":26},"起重机械的选择",{"key":31,"text":105,"correct":22},"构件吊装工艺",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1146536,"地面建筑防水层施工时宜采用（）水泥。",[110,112,114,116],{"key":20,"text":111,"correct":22},"矿渣硅酸盐",{"key":24,"text":113,"correct":22},"粉煤灰硅酸盐",{"key":28,"text":115,"correct":26},"普通硅酸盐",{"key":31,"text":117,"correct":22},"复合硅酸盐",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1146537,"确定屋面防水卷材采用搭接法铺贴时，其搭接方向和长度与（）无关。",[122,124,126,128],{"key":20,"text":123,"correct":26},"屋面高度",{"key":24,"text":125,"correct":22},"主要风向",{"key":28,"text":127,"correct":22},"粘贴方法",{"key":31,"text":129,"correct":22},"卷材性质",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1146538,"对防水混凝土的施工要求，说法正确的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"防水混凝土的保护层厚度应较普通混凝土保护层少10mm",{"key":24,"text":137,"correct":22},"防水混凝土机械搅拌时间应小于2min",{"key":28,"text":139,"correct":22},"防水混凝土施工所选用的模板吸水性要大",{"key":31,"text":141,"correct":26},"防水混凝土模板不得与钢筋及绑扎钢丝有接触",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1146539,"减水剂防水混凝土的特点是（）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"抗冻性好",{"key":24,"text":149,"correct":26},"拌合物流动性好",{"key":28,"text":151,"correct":22},"早期强度高",{"key":31,"text":153,"correct":22},"密实性好",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1146540,"涂刷防水涂料时，第二层涂刷的方向应与第一层（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"一致",{"key":24,"text":161,"correct":22},"相反",{"key":28,"text":163,"correct":22},"斜交叉",{"key":31,"text":165,"correct":26},"垂直",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1146541,"关于主、副井筒位置与工业广场位置确定的基本原则，说法正确的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"一般主、副井筒应设在井田四周",{"key":24,"text":173,"correct":22},"工业场地内必须设立铁路装运站",{"key":28,"text":175,"correct":26},"采用近长方形布置，且长边与岩层走向垂直",{"key":31,"text":177,"correct":22},"选矿工业场地一般应远离采矿工业场地",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1146542,"关于选矿性质的说法，正确的是（）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"选矿是矿物加工的全部内容",{"key":24,"text":185,"correct":22},"选矿是将贫矿变为富矿",{"key":28,"text":187,"correct":22},"有的选矿要完成冶炼",{"key":31,"text":189,"correct":26},"选矿是为使有用矿物相对富集",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1146543,"浮选过程中最基本的行为是（）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"使矿物颗粒相对密度减小",{"key":24,"text":197,"correct":26},"矿粒向气泡选择性地附着",{"key":28,"text":199,"correct":22},"使颗粒与泡沫进行化学作用",{"key":31,"text":201,"correct":22},"利用颗粒与泡沫的不同相对密度",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1146544,"钢筋混凝土单层工业厂房施工的关键问题是（）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"施工场地的平面布置",{"key":24,"text":209,"correct":22},"构件的预制顺序",{"key":28,"text":211,"correct":22},"承重结构构件的预制",{"key":31,"text":213,"correct":26},"承重结构构件的吊装",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1146545,"关于利用永久井架凿井，说法错误的是（）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"有利于加快缩短主副井交替装备时间",{"key":24,"text":221,"correct":26},"可以增加建设方的收益",{"key":28,"text":223,"correct":22},"可以节省临时装备费用",{"key":31,"text":225,"correct":22},"有利于加快建井进度",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1146546,"室内地面涂料防水的防水层完工后，应进行蓄水试验，蓄水时间为（）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"6～12h",{"key":24,"text":233,"correct":22},"12～24h",{"key":28,"text":235,"correct":26},"24～48h",{"key":31,"text":237,"correct":22},"48～72h",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},1146547,"钢材耐热而不防火，在温度达到（）以后，强度逐渐下降。",[242,244,246,248],{"key":20,"text":243,"correct":22},"200℃",{"key":24,"text":245,"correct":22},"250℃",{"key":28,"text":247,"correct":22},"280℃",{"key":31,"text":249,"correct":26},"300℃",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},1146548,"涂刷第一遍防水涂料后，应在铺设玻璃纤维布同时涂刷第二遍防水涂料。总厚度应符合产品技术性能要求。玻纤布的接搓应顺流水方向搭接，搭接宽度应不小于（）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"50mm",{"key":24,"text":257,"correct":22},"80mm",{"key":28,"text":259,"correct":26},"100mm",{"key":31,"text":261,"correct":22},"120mm",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1146549,"上下层卷材不得相互垂直铺贴;接缝处不得有气泡和褶皱，并应按规定做附加补强层，宽度不少于（）。",[266,267,269,270],{"key":20,"text":257,"correct":22},{"key":24,"text":268,"correct":22},"90mm",{"key":28,"text":259,"correct":22},{"key":31,"text":261,"correct":26},{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},1146550,"采用多层卷材（沥青类卷材）防水，上下层及相邻两幅卷材的接缝均应错开（）幅宽。",[275,277,279,281],{"key":20,"text":276,"correct":22},"1\u002F2",{"key":24,"text":278,"correct":26},"1\u002F3",{"key":28,"text":280,"correct":22},"1\u002F4",{"key":31,"text":282,"correct":22},"1\u002F5",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":31,"analysis":33},1146551,"在矿山工程项目中，决定地面生产系统布局和影响施工设施布局的，主要是（）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"施工方案",{"key":24,"text":290,"correct":22},"土建工程",{"key":28,"text":292,"correct":22},"大型施工设备",{"key":31,"text":294,"correct":26},"地下产生系统",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":20,"analysis":33},1146552,"煤矿井巷工程的施工内容中，属于单位工程的是（）。",[299,301,303,305],{"key":20,"text":300,"correct":26},"通风安全设施",{"key":24,"text":302,"correct":22},"巷道水沟",{"key":28,"text":304,"correct":22},"井筒壁座",{"key":31,"text":306,"correct":22},"井底水窝",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":24,"analysis":33},1146553,"井筒工程的子单位工程是按井筒单位工程的（）划分的部分。",[311,313,315,317],{"key":20,"text":312,"correct":22},"不同工程材料",{"key":24,"text":314,"correct":26},"不同施工年度",{"key":28,"text":316,"correct":22},"不同工程部位",{"key":31,"text":318,"correct":22},"不同施工工种",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":28,"analysis":33},1146554,"进行矿山规划、设计的前提条件是具有被批准的（）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"建设的可行性报告",{"key":24,"text":326,"correct":22},"技术方案",{"key":28,"text":328,"correct":26},"资源的勘探报告",{"key":31,"text":330,"correct":22},"审批报告",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":20,"analysis":33},1146555,"矿山井巷工程的开拓方式分为（）。",[335,337,339,341],{"key":20,"text":336,"correct":26},"单向掘进和对头掘进",{"key":24,"text":338,"correct":22},"单向掘进和双向掘进",{"key":28,"text":340,"correct":22},"双向掘进和对头掘进",{"key":31,"text":342,"correct":22},"单头掘进和单向掘进",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":24,"analysis":33},1146556,"主副井错开施工的时间应根据最优网络图而定，一般为（）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"1～4个星期",{"key":24,"text":350,"correct":26},"1～4个月",{"key":28,"text":352,"correct":22},"2～4个月",{"key":31,"text":354,"correct":22},"3～6个月",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},1146557,"建设单位编制的单项工程施工组织设计需要（）组织审批。",[359,361,363,365],{"key":20,"text":360,"correct":26},"建设单位的上级主管部门",{"key":24,"text":362,"correct":22},"设计单位",{"key":28,"text":364,"correct":22},"地方行政主管部门",{"key":31,"text":366,"correct":22},"施工单位的上级机关",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":20,"analysis":33},1146558,"单位工程施工组织设计由承担施工任务的单位负责编制，吸收建设单位、设计部门参加，由（）审批。",[371,373,375,377],{"key":20,"text":372,"correct":26},"编制单位报上一级领导机关",{"key":24,"text":374,"correct":22},"工程处审批",{"key":28,"text":376,"correct":22},"公司（局）",{"key":31,"text":378,"correct":22},"建设单位",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":31,"analysis":33},1146559,"施工组织设计的优化，最终应体现在（）上。",[383,385,387,389],{"key":20,"text":384,"correct":22},"工程规模",{"key":24,"text":386,"correct":22},"施工速度",{"key":28,"text":388,"correct":22},"投资费用",{"key":31,"text":390,"correct":26},"经济技术指标",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":31,"analysis":33},1146560,"主副井贯通前，矿井的通风方式是利用（）进行通风。",[395,397,399,401],{"key":20,"text":396,"correct":22},"副井进风，主井出风",{"key":24,"text":398,"correct":22},"主井进风，副井出风",{"key":28,"text":400,"correct":22},"在井下贯通联络巷内修建临时风门",{"key":31,"text":402,"correct":26},"原来凿井时的通风设备",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":28,"analysis":33},1146561,"施工准备工作中的（）还要为确定仓库、堆场面积、组织运输准备之用。",[407,409,411,413],{"key":20,"text":408,"correct":22},"劳动力需要量计划",{"key":24,"text":410,"correct":22},"施工机械需要量计划",{"key":28,"text":412,"correct":26},"材料、设备供应计划",{"key":31,"text":414,"correct":22},"工程进度计划",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},1146562,"井巷工程开工前的劳力准备内容，要求不正确的是（）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"做好劳力队伍的组织工作",{"key":24,"text":422,"correct":22},"完成技术交底工作",{"key":28,"text":424,"correct":26},"配备好机具及施工用料",{"key":31,"text":426,"correct":22},"建立现场管理制度",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},1146563,"下面属于施工准备工作中的工程准备的是（）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"图纸会审",{"key":24,"text":434,"correct":26},"四通一平",{"key":28,"text":436,"correct":22},"制定施工设备计划",{"key":31,"text":438,"correct":22},"选择分包商",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":24,"analysis":33},1146564,"采用定额计算法确定工序延续时间，计算参数不包括（）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"工序的工程量",{"key":24,"text":446,"correct":26},"工序的辅助时间",{"key":28,"text":448,"correct":22},"参与该工序的人力或机械数量",{"key":31,"text":450,"correct":22},"工序的产量定额",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},1146565,"横道图施工进度计划的主要优点是（）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"能正确反映出工程项目的关键所在",{"key":24,"text":458,"correct":22},"能明确反映出工作之间的逻辑关系",{"key":28,"text":460,"correct":22},"可有效反映出工作所具有的机动时间",{"key":31,"text":462,"correct":26},"形象、直观，易于编制和理解",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},1146566,"矿业工程在确定工期过程中，做法不合理的是（）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"合理安排土建与安装的综合施工",{"key":24,"text":470,"correct":22},"要因地制宜，量力而行",{"key":28,"text":472,"correct":22},"合理配备所需资源",{"key":31,"text":474,"correct":26},"总工期必须大于合同工期",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},1146567,"矿山工程的建井工期是（）。",[479,481,483,485],{"key":20,"text":480,"correct":22},"准备期与矿井竣工期之和",{"key":24,"text":482,"correct":22},"建井总工期",{"key":28,"text":484,"correct":22},"矿井投产期",{"key":31,"text":486,"correct":26},"竣工期",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},1146568,"确定建井工期的方法，通常是根据（）来确定。",[491,493,495,497],{"key":20,"text":492,"correct":22},"累计重要土建、安装工程完成时间",{"key":24,"text":494,"correct":26},"井巷工程的施工期",{"key":28,"text":496,"correct":22},"设备的最终到货时间",{"key":31,"text":498,"correct":22},"矿建、土建、安装时间总和",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":24,"analysis":33},1146569,"通常，工程进度滞后而要求更新的最终目的是（）。",[503,505,507,509],{"key":20,"text":504,"correct":22},"延长工期",{"key":24,"text":506,"correct":26},"调整后续工程进度计划",{"key":28,"text":508,"correct":22},"调整前期工程量内容",{"key":31,"text":510,"correct":22},"增加索赔机会",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},1146570,"当对一关键工作延误采取措施时，合理的结论是（）。",[515,517,519,521],{"key":20,"text":516,"correct":26},"尽早调整紧邻后续关键工序有利于尽早恢复进度正常",{"key":24,"text":518,"correct":22},"重新安排前续关键工序时间更容易满足原工期要求",{"key":28,"text":520,"correct":22},"矿建工程一般都可以通过对头掘进的方法恢复工期进度",{"key":31,"text":522,"correct":22},"平行作业法对提高不同条件下的井巷施工速度都很有效",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1146571,"加快井巷工程关键线路工作施工的有效措施是（）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"主井和副井同时施工",{"key":24,"text":530,"correct":26},"矿井贯通巷道安排重点队伍施工",{"key":28,"text":532,"correct":22},"积极做好通风和排水工作",{"key":31,"text":534,"correct":22},"采区煤巷采用掘进机施工",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":28,"analysis":33},1146572,"施工单位接到质量通知单后在（）的组织与参与下，应尽快进行质量事故的调查，写出质量事故的报告。",[539,541,543,545],{"key":20,"text":540,"correct":22},"设计工程师",{"key":24,"text":542,"correct":22},"项目经理",{"key":28,"text":544,"correct":26},"监理工程师",{"key":31,"text":546,"correct":22},"质量工程师",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":31,"analysis":33},1146573,"特别重大质量事故的调查程序应按照（）有关规定办理。",[551,553,555,557],{"key":20,"text":552,"correct":22},"当地人民政府",{"key":24,"text":554,"correct":22},"上级建设行政主管部门",{"key":28,"text":556,"correct":22},"事故发生地的建设行政主管部门",{"key":31,"text":558,"correct":26},"国务院",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},1146574,"下列不属于质量保证体系的内容是（）。",[563,565,567,569],{"key":20,"text":564,"correct":26},"实施保证体系",{"key":24,"text":566,"correct":22},"组织保证体系",{"key":28,"text":568,"correct":22},"思想保证体系",{"key":31,"text":570,"correct":22},"工作保证体系",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":28,"analysis":33},1146575,"工序能力指数记为CP可以判别工序施工状态好坏。一般把工序能力指数分5级，其中，表示工序能力指数合格，但不充分的是等级（）。",[575,577,578,579],{"key":20,"text":576,"correct":22},"特级",{"key":24,"text":20,"correct":22},{"key":28,"text":24,"correct":26},{"key":31,"text":28,"correct":22},{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":28,"analysis":33},1146576,"在排列图法中，习惯上通常将影响因素分为三类，其中属于B类的累计频率为（）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"0～80％",{"key":24,"text":587,"correct":22},"50％～80％",{"key":28,"text":589,"correct":26},"80％～90％",{"key":31,"text":591,"correct":22},"90％～100％",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":33},1146577,"工程质量事故分为四个等级，下列不属于其中四个等级的是（）。",[596,598,600,602],{"key":20,"text":597,"correct":22},"特别重大事故",{"key":24,"text":599,"correct":26},"较重大事故",{"key":28,"text":601,"correct":22},"较大事故",{"key":31,"text":603,"correct":22},"一般事故",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":20,"analysis":33},1146578,"露天矿疏干井工程扩孔时，符合要求的是（）。",[608,610,612,614],{"key":20,"text":609,"correct":26},"扩孔期间，每小班应提钻一次",{"key":24,"text":611,"correct":22},"应减少扩孔直径级差",{"key":28,"text":613,"correct":22},"增加扩孔级差",{"key":31,"text":615,"correct":22},"扩孔速度越快越好",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]