[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-801-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":590},{"id":5,"name":6,"category":7,"favorite":8},801,"一建矿业工程实务","建筑工程",0,8,50,1603,[13,34,46,58,70,82,94,106,118,130,142,154,166,174,186,198,210,221,232,243,252,264,275,287,295,307,319,331,343,355,365,375,383,395,407,419,427,439,451,463,475,487,499,511,523,535,545,557,566,578],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1146478,1,"单选题","副井系统的硐室包括（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","装载硐室",false,{"key":24,"text":25,"correct":22},"B","翻矸硐室",{"key":27,"text":28,"correct":29},"C","管子道",true,{"key":31,"text":32,"correct":22},"D","清理硐室","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1146479,"关于井下巷道掘进循环中各连锁工序时间的确定方法，正确的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"由统一定额规定",{"key":24,"text":41,"correct":22},"根据效益高低确定",{"key":27,"text":43,"correct":29},"依据定额并有具体测定修正",{"key":31,"text":45,"correct":22},"取周围地区平均值",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1146480,"不应列入影响锚杆抗拉拔力大小因素的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"围岩岩性",{"key":24,"text":53,"correct":29},"托盘的预紧力",{"key":27,"text":55,"correct":22},"锚固方法",{"key":31,"text":57,"correct":22},"施工质量",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1146481,"巷道围岩内部某点的绝对位移监测可以采用的仪器设备是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"收敛计",{"key":24,"text":65,"correct":29},"多点位移计",{"key":27,"text":67,"correct":22},"经纬仪",{"key":31,"text":69,"correct":22},"水准仪",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1146482,"立井井筒特殊法施工，不包括（）。",[74,76,78,80],{"key":20,"text":75,"correct":29},"吊挂井壁施工法",{"key":24,"text":77,"correct":22},"冻结法",{"key":27,"text":79,"correct":22},"钻井法",{"key":31,"text":81,"correct":22},"沉井法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1146483,"立井井筒穿过预测涌水量大于（）的含水岩层或破碎带时，应采用地面或者工作注浆预注浆法进行堵水或加固。",[86,88,90,92],{"key":20,"text":87,"correct":22},"8m3／h",{"key":24,"text":89,"correct":22},"9m3／h",{"key":27,"text":91,"correct":29},"10m3／h",{"key":31,"text":93,"correct":22},"11m3／h",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1146484,"目前，帷幕法适用的深度不超过（）。",[98,100,102,104],{"key":20,"text":99,"correct":29},"100m",{"key":24,"text":101,"correct":22},"200m",{"key":27,"text":103,"correct":22},"300m",{"key":31,"text":105,"correct":22},"400m",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1146485,"井筒穿越煤层进行爆破时，必须采用煤矿许用炸药和最后一段的延期时间不超过（）的煤矿许用毫秒延期电雷管。",[110,112,114,116],{"key":20,"text":111,"correct":22},"50ms",{"key":24,"text":113,"correct":22},"110ms",{"key":27,"text":115,"correct":29},"130ms",{"key":31,"text":117,"correct":22},"250ms",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1146486,"巷道掘进与永久支护平行的作业方式，一般要求掘进断面大于（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"5㎡",{"key":24,"text":125,"correct":29},"8㎡",{"key":27,"text":127,"correct":22},"12㎡",{"key":31,"text":129,"correct":22},"14㎡",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1146487,"井底车场的水仓入口一般位于（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"井底车场最高标高位置",{"key":24,"text":137,"correct":29},"井底车场最低标高位置",{"key":27,"text":139,"correct":22},"管子道标高最低点",{"key":31,"text":141,"correct":22},"管子道标高最高点",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1146488,"设计喷射混凝土强度等级多采用C15-C20，喷层厚度通常为（）左右。",[146,148,150,152],{"key":20,"text":147,"correct":22},"8-12cm",{"key":24,"text":149,"correct":22},"10-13cm",{"key":27,"text":151,"correct":29},"10-15cm",{"key":31,"text":153,"correct":22},"15-17cm",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1146489,"斜井回填时要两侧对称回填，回填土应分层夯实。采用人力打夯时，每层厚度不大于（）",[158,160,162,164],{"key":20,"text":159,"correct":22},"100mm",{"key":24,"text":161,"correct":29},"200mm",{"key":27,"text":163,"correct":22},"300mm",{"key":31,"text":165,"correct":22},"400mm",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1146490,"斜井在混凝土浇筑过程中，应两侧对称浇筑，以防模板变形。分层浇筑，分层振捣，每层浇筑深度为（）。",[170,171,172,173],{"key":20,"text":159,"correct":22},{"key":24,"text":161,"correct":22},{"key":27,"text":163,"correct":29},{"key":31,"text":165,"correct":22},{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":27,"analysis":33},1146491,"固定盘是设置在井筒内邻近井口的第二个工作平台，一般位于封口盘以下（）处。",[178,180,182,184],{"key":20,"text":179,"correct":22},"1-2m",{"key":24,"text":181,"correct":22},"3-6m",{"key":27,"text":183,"correct":29},"4-8m",{"key":31,"text":185,"correct":22},"5-10m",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":20,"analysis":33},1146492,"短掘、短喷单行作业与短段掘、砌单行作业基本相同，只是用喷射混凝土代替现浇混凝土井壁，喷射段高一般为（）左右。",[190,192,194,196],{"key":20,"text":191,"correct":29},"2m",{"key":24,"text":193,"correct":22},"4m",{"key":27,"text":195,"correct":22},"6m",{"key":31,"text":197,"correct":22},"8m",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":27,"analysis":33},1146493,"冬期施工中，为防止土壤冻结，可在表面用当地保温材料加以覆盖，或先将表土翻耕粑松，其深度一般不得小于（）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"0.1m",{"key":24,"text":205,"correct":22},"0.2m",{"key":27,"text":207,"correct":29},"0.3m",{"key":31,"text":209,"correct":22},"0.4m",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":27,"analysis":33},1146494,"在有沼气或煤尘爆炸危险的井筒内进行爆破，或者是井筒穿过煤层进行爆破时，必须采用煤矿许用炸药和最后一段的延期时间不超过（）的煤矿许用毫秒延期电雷管。",[214,216,218,219],{"key":20,"text":215,"correct":22},"100ms",{"key":24,"text":217,"correct":22},"120ms",{"key":27,"text":115,"correct":29},{"key":31,"text":220,"correct":22},"150ms",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":31,"analysis":33},1146495,"为了保证通风效果，局部风机必须安设在有新鲜风流中，距掘进巷道回风口不小于（），以免产生循环风流。",[225,227,228,230],{"key":20,"text":226,"correct":22},"7m",{"key":24,"text":197,"correct":22},{"key":27,"text":229,"correct":22},"9m",{"key":31,"text":231,"correct":29},"10m",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":31,"analysis":33},1146496,"按《非煤露天矿边坡工程技术规范》GB51016--2014的规定，下列坡高不属于低边坡的是（）。",[236,238,240,241],{"key":20,"text":237,"correct":22},"20m",{"key":24,"text":239,"correct":22},"50m",{"key":27,"text":99,"correct":22},{"key":31,"text":242,"correct":29},"120m",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":31,"analysis":33},1146497,"边坡高度H大于（）为超高边坡。",[247,248,249,250],{"key":20,"text":99,"correct":22},{"key":24,"text":103,"correct":22},{"key":27,"text":105,"correct":22},{"key":31,"text":251,"correct":29},"500m",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":27,"analysis":33},1146498,"穿爆工程施工，穿孔设备在高压线下行走时，钻架顶端与高压线的最小垂直距离不得小于（）m",[256,258,260,262],{"key":20,"text":257,"correct":22},"0.5",{"key":24,"text":259,"correct":22},"0.8",{"key":27,"text":261,"correct":29},"1.0",{"key":31,"text":263,"correct":22},"1.2",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":31,"analysis":33},1146499,"穿爆工程施工，孔径大于（）的穿孔设备必须配备除尘设施。",[268,270,272,274],{"key":20,"text":269,"correct":22},"60mm",{"key":24,"text":271,"correct":22},"80mm",{"key":27,"text":273,"correct":22},"90mm",{"key":31,"text":159,"correct":29},{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":24,"analysis":33},1146500,"潜孔锤钻进的适用条件是（）",[279,281,283,285],{"key":20,"text":280,"correct":22},"碎石土类松散层，井深在200m以内",{"key":24,"text":282,"correct":29},"坚硬基岩，且岩层不含水或富水性差",{"key":27,"text":284,"correct":22},"岩层漏水严重或干旱缺水地区施工",{"key":31,"text":286,"correct":22},"砂土类及黏性土类松散层，软至硬的基岩",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":24,"analysis":33},1146501,"洗井合格后应做好护井工作，井台应高出地面（）以上，并满足防洪要求。",[291,292,293,294],{"key":20,"text":203,"correct":22},{"key":24,"text":205,"correct":29},{"key":27,"text":207,"correct":22},{"key":31,"text":209,"correct":22},{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":24,"analysis":33},1146502,"对于露天矿疏干井的井深在200m以内的碎石土类松散层，其钻井宜采用（）的方法。",[299,301,303,305],{"key":20,"text":300,"correct":22},"回转钻进",{"key":24,"text":302,"correct":29},"冲击钻进",{"key":27,"text":304,"correct":22},"反循环钻进",{"key":31,"text":306,"correct":22},"空气钻进",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":27,"analysis":33},1146503,"露天矿防排水工程的主要内容有排水工程和（）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"挖渠道",{"key":24,"text":314,"correct":22},"建围堰和设水仓",{"key":27,"text":316,"correct":29},"防洪堤工程",{"key":31,"text":318,"correct":22},"疏干工程",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},1146504,"按露天矿岩体地质结构的划分规定，（）岩体地质结构形式不存在。",[323,325,327,329],{"key":20,"text":324,"correct":22},"块状",{"key":24,"text":326,"correct":22},"层状",{"key":27,"text":328,"correct":22},"碎裂状",{"key":31,"text":330,"correct":29},"软土状",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":27,"analysis":33},1146505,"用以稳定边坡的重力挡墙，其高度处理的正确做法是（）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"重力挡墙不宜低于12m",{"key":24,"text":338,"correct":22},"重力式挡墙的高度应完全由设计确定",{"key":27,"text":340,"correct":29},"重力挡墙高度宜小于12m",{"key":31,"text":342,"correct":22},"重力式挡墙不能由设计计算确定",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":31,"analysis":33},1146506,"下列边坡及滑体治理工程的措施，宜优先选用的是（）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"重力挡墙",{"key":24,"text":350,"correct":22},"注浆",{"key":27,"text":352,"correct":22},"抗滑桩",{"key":31,"text":354,"correct":29},"疏排水",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":27,"analysis":33},1146507,"边坡治理，采用重力式挡墙高度宜小于（）",[359,360,361,363],{"key":20,"text":197,"correct":22},{"key":24,"text":231,"correct":22},{"key":27,"text":362,"correct":29},"12m",{"key":31,"text":364,"correct":22},"14m",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":31,"analysis":33},1146508,"管井施工中，每钻进（）应测量一次井斜。",[369,370,372,373],{"key":20,"text":231,"correct":22},{"key":24,"text":371,"correct":22},"15m",{"key":27,"text":237,"correct":22},{"key":31,"text":374,"correct":29},"30m",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":24,"analysis":33},1146509,"适用于碎石土类松散层、井深在200m以内的钻井方法是（）",[379,380,381,382],{"key":20,"text":300,"correct":22},{"key":24,"text":302,"correct":29},{"key":27,"text":306,"correct":22},{"key":31,"text":304,"correct":22},{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},1146511,"按照所用材料，地面建筑防水砂浆属于（）。",[387,389,391,393],{"key":20,"text":388,"correct":22},"柔性防水",{"key":24,"text":390,"correct":29},"刚性防水",{"key":27,"text":392,"correct":22},"综合防水",{"key":31,"text":394,"correct":22},"自防水",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":20,"analysis":33},1146512,"北方高寒地区抗冻性要求较高的地下建筑混凝土自防水施工，宜选用（）防水混凝土。",[399,401,403,405],{"key":20,"text":400,"correct":29},"引气剂",{"key":24,"text":402,"correct":22},"减水剂",{"key":27,"text":404,"correct":22},"密实剂",{"key":31,"text":406,"correct":22},"膨胀剂",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":24,"analysis":33},1146513,"当钢筋的混凝土保护层厚度不够时，会造成钢筋受拉时在钢筋附近的（）破坏。",[411,413,415,417],{"key":20,"text":412,"correct":22},"钢筋断裂",{"key":24,"text":414,"correct":29},"混凝土劈拉破坏",{"key":27,"text":416,"correct":22},"钢筋与混凝土间滑动",{"key":31,"text":418,"correct":22},"混凝土剪切",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},1146514,"对于工期紧迫、抗渗性能较高的防水工程，适宜的外加剂材料是（）。",[423,424,425,426],{"key":20,"text":400,"correct":22},{"key":24,"text":404,"correct":29},{"key":27,"text":402,"correct":22},{"key":31,"text":406,"correct":22},{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},1146515,"防水混凝土的施工技术要求，说法错误的是（）",[431,433,435,437],{"key":20,"text":432,"correct":22},"地下水位应降至防水工程底板垫层下≥500mm",{"key":24,"text":434,"correct":29},"为增强混凝土的均匀性，机械搅拌不少于1min",{"key":27,"text":436,"correct":22},"应在终凝前覆盖浇灌的混凝土，保温养护不少于14d",{"key":31,"text":438,"correct":22},";防水混凝土结构内部设置的各种钢筋或绑扎钢丝不得接触模板",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":24,"analysis":33},1146516,"防水卷材的两幅卷材间搭接长度，要求长边不小于（），短边不小于（）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"100mm；120mm",{"key":24,"text":446,"correct":29},"100mm；150mm",{"key":27,"text":448,"correct":22},"120mm；150mm",{"key":31,"text":450,"correct":22},"150mm；120mm",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},1146517,"钢结构采用焊接方法施工的缺点是（）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"加工方便",{"key":24,"text":458,"correct":22},"构造复杂",{"key":27,"text":460,"correct":22},"刚度小",{"key":31,"text":462,"correct":29},"焊缝附近的钢材因焊接的高温作用而形成热影响区，造成局部材质变脆",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":20,"analysis":33},1146518,"钢筋混凝土构件的主要钢筋通常应布置在构件的（）。",[467,469,471,473],{"key":20,"text":468,"correct":29},"受拉部位",{"key":24,"text":470,"correct":22},"受压部位",{"key":27,"text":472,"correct":22},"中部",{"key":31,"text":474,"correct":22},"上部",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},1146519,"钢筋混凝土井塔一般采用的施工方法是（）。",[479,481,483,485],{"key":20,"text":480,"correct":22},"结构吊装",{"key":24,"text":482,"correct":22},"大模板施工",{"key":27,"text":484,"correct":22},"一般现浇工艺",{"key":31,"text":486,"correct":29},"爬模施工",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":27,"analysis":33},1146520,"关于尾矿的错误说法的是（）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"尾矿的污染在于残余矿石中的金属元素",{"key":24,"text":494,"correct":22},"尾矿中可能含有用成分",{"key":27,"text":496,"correct":29},"尾矿就是矿脉尾部的矿石",{"key":31,"text":498,"correct":22},"尾矿要处理还在于洗选剂带有害成分",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":27,"analysis":33},1146521,"矿山工业场地内主要建（构）筑物中，矸石场属于（）类设施。",[503,505,507,509],{"key":20,"text":504,"correct":22},"主要生产流程",{"key":24,"text":506,"correct":22},"生产与辅助",{"key":27,"text":508,"correct":29},"涉及重大安全、环保影响",{"key":31,"text":510,"correct":22},"运送线路与管线",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},1146522,"砌体结构的主要受力的特点是（）。",[515,517,519,521],{"key":20,"text":516,"correct":29},"抗压强度远大于抗拉强度",{"key":24,"text":518,"correct":22},"抗拉强度远大于抗压强度",{"key":27,"text":520,"correct":22},"抗折强度远大于抗剪强度",{"key":31,"text":522,"correct":22},"抗剪强度远大于抗拉强度",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":20,"analysis":33},1146523,"砂浆流动性好坏对砌体质量的影响主要是其有利于提高（）。",[527,529,531,533],{"key":20,"text":528,"correct":29},"灰缝的饱满性和密实性",{"key":24,"text":530,"correct":22},"砌块的厚度",{"key":27,"text":532,"correct":22},"灰缝的抗压强度",{"key":31,"text":534,"correct":22},"砌块强度",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":31,"analysis":33},1146524,"室内地面涂料防水，防水层应从地面延伸到墙面，高出地面（）",[539,541,542,544],{"key":20,"text":540,"correct":22},"50mm",{"key":24,"text":269,"correct":22},{"key":27,"text":543,"correct":22},"70mm",{"key":31,"text":159,"correct":29},{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":27,"analysis":33},1146525,"室内地面涂料防水的施工技术要求，正确的是（）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"施工环境温度宜在15℃以上",{"key":24,"text":552,"correct":22},"防水层应从地面延伸到墙面，高出地面50mm",{"key":27,"text":554,"correct":29},"防水层完工后，经蓄水试验无渗漏，方可铺设面层",{"key":31,"text":556,"correct":22},"涂膜涂刷铺设玻璃纤维布时，玻纤布的接槎应逆流水方向搭接",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":31,"analysis":33},1146526,"竖井生产井架高度超过（）时，目前较多采用的是钢井架。",[561,562,563,564],{"key":20,"text":362,"correct":22},{"key":24,"text":371,"correct":22},{"key":27,"text":237,"correct":22},{"key":31,"text":565,"correct":29},"25m",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":27,"analysis":33},1146527,"提升钢丝绳水平荷载的绝大部分由井架的（）结构承受。",[570,572,574,576],{"key":20,"text":571,"correct":22},"头部",{"key":24,"text":573,"correct":22},"立架",{"key":27,"text":575,"correct":29},"斜架",{"key":31,"text":577,"correct":22},"井口支撑梁",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":27,"analysis":33},1146528,"下列地下工程应采用三级防水等级的是（）。",[582,584,586,588],{"key":20,"text":583,"correct":22},"地下铁道车站",{"key":24,"text":585,"correct":22},"地道运行区间隧道",{"key":27,"text":587,"correct":29},"电缆隧道",{"key":31,"text":589,"correct":22},"城市人行地道",[591,594,597,600,603,606],{"id":15,"name":592,"category":7,"favorite":593},"领导干部任职前廉政法规知识测试题",92,{"id":595,"name":596,"category":7,"favorite":15},595,"建筑结构与设备",{"id":598,"name":599,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":601,"name":602,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":604,"name":605,"category":7,"favorite":8},534,"BIM工程师",{"id":607,"name":605,"category":7,"favorite":8},535]