[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-801-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},801,"一建矿业工程实务","建筑工程",0,7,50,1603,[13,34,46,58,70,82,94,106,118,130,142,154,164,176,188,200,211,223,235,247,259,271,283,295,307,315,327,339,351,363,375,387,399,410,422,434,446,458,470,482,494,506,518,530,542,554,566,578,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1146428,1,"单选题","煤矿许用炸药的选用必须遵守的规定错误的是（）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","低瓦斯矿井的岩石掘进工作面，使用安全等级不高于一级的煤矿许用炸药",true,{"key":24,"text":25,"correct":26},"B","低瓦斯矿井的煤层采掘工作面、半煤岩掘进工作面，使用安全等级不低于二级的煤矿许用炸药",false,{"key":28,"text":29,"correct":26},"C","高瓦斯矿井，使用安全等级不低于三级的煤矿许用炸药",{"key":31,"text":32,"correct":26},"D","突出矿井，使用安全等级不低于三级的煤矿许用含水炸药","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1146429,"一般用于露天或无瓦斯、无矿尘爆炸危险的爆破工程的是（）",[38,40,42,44],{"key":20,"text":39,"correct":26},"普通铵油炸药",{"key":24,"text":41,"correct":22},"改性铵油炸药",{"key":28,"text":43,"correct":26},"重铵油炸药",{"key":31,"text":45,"correct":26},"膨化硝铵炸药",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1146430,"属于安全炸药的是（）",[50,52,54,56],{"key":20,"text":51,"correct":22},"第一类炸药",{"key":24,"text":53,"correct":26},"第二类炸药",{"key":28,"text":55,"correct":26},"第三类炸药",{"key":31,"text":57,"correct":26},"第四类炸药",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1146431,"比较掘进和支护的先后，沉井法是属于（）性质的方法。",[62,64,66,68],{"key":20,"text":63,"correct":26},"掘进与支护平行施工",{"key":24,"text":65,"correct":22},"超前支护",{"key":28,"text":67,"correct":26},"掘进与支护交错进行",{"key":31,"text":69,"correct":26},"滞后支护",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1146432,"采用挂圈背板临时支护时，段高最大不应超过（），支护时间不得超过一个月。",[74,76,78,80],{"key":20,"text":75,"correct":26},"40m",{"key":24,"text":77,"correct":26},"50m",{"key":28,"text":79,"correct":22},"60m",{"key":31,"text":81,"correct":26},"70m",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1146433,"当立井施工采用手持式凿岩机钻眼时，工作面炮眼深度宜取（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"1．5～2．0m",{"key":24,"text":89,"correct":26},"2．0～2．5m",{"key":28,"text":91,"correct":26},"3．0～4．0m",{"key":31,"text":93,"correct":26},"5．0～6．0m",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1146434,"对岩土进行注浆是为了使岩土可以（），以实现安全施工的目的。",[98,100,102,104],{"key":20,"text":99,"correct":22},"减少渗透性，提高稳定性",{"key":24,"text":101,"correct":26},"减少稳定性，提高渗透性",{"key":28,"text":103,"correct":26},"减少可碎性，提高抗爆性",{"key":31,"text":105,"correct":26},"减少抗爆性，提高可碎性",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1146435,"关于对凿井井架的要求，说法不正确的是（）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"应满足提升、悬吊设施的荷载要求",{"key":24,"text":113,"correct":22},"井架围护材料应满足防爆要求",{"key":28,"text":115,"correct":26},"应保证有足够的过卷高度和伞钻进出",{"key":31,"text":117,"correct":26},"角柱跨度应满足各种提升方式要求",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1146436,"关于复合井壁，说法不正确的是（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"采用一种复合材料砌筑",{"key":24,"text":125,"correct":26},"多用于冻结法凿井的永久支护",{"key":28,"text":127,"correct":26},"可用于具有膨胀性质的岩层中",{"key":31,"text":129,"correct":26},"可用于较大地应力的岩层中",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1146437,"关于喷混凝土支护的特点，说法正确的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"喷混凝土具有延性好的特点",{"key":24,"text":137,"correct":22},"它既可以作为临时支护，也可作为永久支护",{"key":28,"text":139,"correct":26},"它的厚度越厚越对围岩稳定有利",{"key":31,"text":141,"correct":26},"喷混凝土在使用中不容易与岩石脱落",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1146438,"关于正台阶工作面（下行分层）施工法上分层超前距离的说法，正确的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"超前距离应大于10m，以保证上分层掘砌施工设备的布置",{"key":24,"text":149,"correct":22},"上分层的超前距离一般为2～3m",{"key":28,"text":151,"correct":26},"超前距离应满足上分层爆破施工对下分层不产生影响",{"key":31,"text":153,"correct":26},"超前距离应满足上分层支护施工对下分层不产生影响",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1146439,"简易龙门架，它结构简单，组装拆卸方便，配以凿井绞车和1.5-2m3左右的吊桶，可用于深度不超过（）的表土施工。",[158,160,162,163],{"key":20,"text":159,"correct":26},"20m",{"key":24,"text":161,"correct":26},"30m",{"key":28,"text":75,"correct":22},{"key":31,"text":77,"correct":26},{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},1146440,"仅限于主井、风井中采用的井壁结构形式是（）。",[168,170,172,174],{"key":20,"text":169,"correct":26},"整体浇筑式井壁",{"key":24,"text":171,"correct":22},"锚喷井壁",{"key":28,"text":173,"correct":26},"砌筑井壁",{"key":31,"text":175,"correct":26},"复合井壁",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":31,"analysis":33},1146441,"井壁下沉时，井壁上沿应高出泥浆浆面1.5m以上，同时要及时排除泥浆，以免泥浆外溢和沉淀。为了防止片帮，泥浆面不得低于锁口以下（）",[180,182,184,186],{"key":20,"text":181,"correct":26},"0.5m",{"key":24,"text":183,"correct":26},"0.7m",{"key":28,"text":185,"correct":26},"0.8m",{"key":31,"text":187,"correct":22},"1.0m",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":31,"analysis":33},1146442,"井巷收敛测量测量的内容是（）。",[192,194,196,198],{"key":20,"text":193,"correct":26},"井巷表面一点的绝对位移量",{"key":24,"text":195,"correct":26},"围岩内部一点的绝对位移量",{"key":28,"text":197,"correct":26},"围岩内部一点对其表面的变形量",{"key":31,"text":199,"correct":22},"井巷表面两点间的相对变形",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":28,"analysis":33},1146443,"就矿山井巷工程而论，帷幕法仅适用于深度不超过（）的含水不稳定表士层中的立井和斜井施工。",[204,205,207,209],{"key":20,"text":79,"correct":26},{"key":24,"text":206,"correct":26},"80m",{"key":28,"text":208,"correct":22},"100m",{"key":31,"text":210,"correct":26},"120m",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":20,"analysis":33},1146444,"矿井设计是分阶段进行的，矿区总体设计批准后应进行（）。",[215,217,219,221],{"key":20,"text":216,"correct":22},"矿井可行性研究",{"key":24,"text":218,"correct":26},"矿井初步设计",{"key":28,"text":220,"correct":26},"矿井初步设计安全专篇",{"key":31,"text":222,"correct":26},"矿井施工图设计",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1146445,"立井井筒采用现浇混凝土支护时，装配式钢模板的高度不宜超过（）m。",[227,229,231,233],{"key":20,"text":228,"correct":26},"0．6",{"key":24,"text":230,"correct":22},"1．2",{"key":28,"text":232,"correct":26},"1．8",{"key":31,"text":234,"correct":26},"2．0",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},1146446,"立井井筒施工的中心回转式抓岩机应固定在（）。",[239,241,243,245],{"key":20,"text":240,"correct":22},"吊盘的下层盘",{"key":24,"text":242,"correct":26},"吊盘的上层盘",{"key":28,"text":244,"correct":26},"固定盘下",{"key":31,"text":246,"correct":26},"井壁上",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":31,"analysis":33},1146447,"立井井筒施工中，用于提升及悬吊掘进设备的专用设备是（）。",[251,253,255,257],{"key":20,"text":252,"correct":26},"吊盘",{"key":24,"text":254,"correct":26},"钢丝绳",{"key":28,"text":256,"correct":26},"天轮",{"key":31,"text":258,"correct":22},"凿井井架",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},1146448,"立井井筒施工作业方式在选择时，应综合分析和考虑的内容不包括（）",[263,265,267,269],{"key":20,"text":264,"correct":22},"井筒穿过岩层性质，地下水的大小",{"key":24,"text":266,"correct":26},"井筒直径和深度（基岩部分）",{"key":28,"text":268,"correct":26},"可能采用的施工工艺及技术装备条件",{"key":31,"text":270,"correct":26},"施工队伍的操作技术水平和施工管理水平",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":31,"analysis":33},1146449,"平硐施工的通风可选用对旋式风机和直径（）左右的不燃性胶质风筒向工作面进行压入式供风。",[275,277,279,281],{"key":20,"text":276,"correct":26},"500mm",{"key":24,"text":278,"correct":26},"600mm",{"key":28,"text":280,"correct":26},"800mm",{"key":31,"text":282,"correct":22},"1000mm",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":20,"analysis":33},1146450,"平巷断面尺寸要根据通过巷道的运输设备等因素来确定，并最后用（）校核。",[287,289,291,293],{"key":20,"text":288,"correct":22},"通过的风速",{"key":24,"text":290,"correct":26},"预计产煤量",{"key":28,"text":292,"correct":26},"运输设备的类型",{"key":31,"text":294,"correct":26},"各种安全间隙",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":28,"analysis":33},1146451,"软岩巷道采取二次支护的主要原因是（）。",[299,301,303,305],{"key":20,"text":300,"correct":26},"巷道采用了分次施工方法",{"key":24,"text":302,"correct":26},"巷道围岩压力大",{"key":28,"text":304,"correct":22},"围岩变形且长期不稳定",{"key":31,"text":306,"correct":26},"巷道底板容易产生底鼓",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":31,"analysis":33},1146452,"施工中，为提高装岩和排矸的速度，往往每隔（）设一调车躲避硐，以便于汽车进入工作面前调车。",[311,312,313,314],{"key":20,"text":161,"correct":26},{"key":24,"text":77,"correct":26},{"key":28,"text":206,"correct":26},{"key":31,"text":208,"correct":22},{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":31,"analysis":33},1146453,"使用溜灰管输送混凝土，不符合要求的是（）",[319,321,323,325],{"key":20,"text":320,"correct":26},"溜灰管送料前，应先输送少量水泥砂浆",{"key":24,"text":322,"correct":26},"井壁浇筑完后，应及时用水清洗",{"key":28,"text":324,"correct":26},"石子粒径不得大于40mm，混凝土坍落度不应小于150mm",{"key":31,"text":326,"correct":22},"溜灰管内径不宜小于100mm，末端应安设缓冲装置并采用分灰器入模",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":31,"analysis":33},1146454,"适用于直径5m、井深600m立井井筒施工的机械化配套方案是（）。",[331,333,335,337],{"key":20,"text":332,"correct":26},"IV型井架，JK2．8／15．5提升机，FJD-6伞钻，液压滑升模板",{"key":24,"text":334,"correct":26},"IV型井架，2JK3／15．5提升机，FJD-9伞钻，液压滑升模板",{"key":28,"text":336,"correct":26},"IVG型井架，2JK3／15．5提升机，FJD-4伞钻，YJM系列模板",{"key":31,"text":338,"correct":22},"IVG型井架，2JK2．5／20提升机，FJD-6伞钻，YJM系列模板",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":28,"analysis":33},1146455,"巷道施工的装载与运输是掘进中劳动量大，占循环时间最长的工序，一般情况下它可占掘进循环时间的（）",[343,345,347,349],{"key":20,"text":344,"correct":26},"10%-30%",{"key":24,"text":346,"correct":26},"15%-35%",{"key":28,"text":348,"correct":22},"35%-50%",{"key":31,"text":350,"correct":26},"50%-70%",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":31,"analysis":33},1146456,"巷道施工应采用一次成巷，只有特殊情况才允许采用分次成巷。允许采用分次成巷的巷道是（）。",[355,357,359,361],{"key":20,"text":356,"correct":26},"井底车场",{"key":24,"text":358,"correct":26},"防水闸门",{"key":28,"text":360,"correct":26},"防火闸门",{"key":31,"text":362,"correct":22},"急需贯通的通风巷道",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},1146457,"巷道与硐室的钻眼爆破法施工，其基本程序不包括（）。",[367,369,371,373],{"key":20,"text":368,"correct":26},"临时支护",{"key":24,"text":370,"correct":22},"通风",{"key":28,"text":372,"correct":26},"安全检查",{"key":31,"text":374,"correct":26},"装渣出渣",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":20,"analysis":33},1146458,"斜井从明槽进入暗挖段的（）部位宜与明槽部分的永久支护同时施工。",[379,381,383,385],{"key":20,"text":380,"correct":22},"1-3m",{"key":24,"text":382,"correct":26},"1-5m",{"key":28,"text":384,"correct":26},"1-6m",{"key":31,"text":386,"correct":26},"1-8m",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":31,"analysis":33},1146459,"斜井明挖段混凝土浇筑强度达到设计强度（）以上时可进行回填。",[391,393,395,397],{"key":20,"text":392,"correct":26},"40%",{"key":24,"text":394,"correct":26},"50%",{"key":28,"text":396,"correct":26},"60%",{"key":31,"text":398,"correct":22},"70%",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":31,"analysis":33},1146460,"在含水软弱地层、承载力差的地段施工时，为保证挖、运机械的正常运转，对底板应采取加固措施，如抛石砂浆换底，换底的深度应不小于（）。",[403,405,407,409],{"key":20,"text":404,"correct":26},"100mm",{"key":24,"text":406,"correct":26},"200mm",{"key":28,"text":408,"correct":26},"300mm",{"key":31,"text":276,"correct":22},{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":28,"analysis":33},1146461,"在立井井筒施工中，表土层是否稳定对施工方式和进度影响很大，属于稳定表土的是（）。",[414,416,418,420],{"key":20,"text":415,"correct":26},"含水砂层",{"key":24,"text":417,"correct":26},"浸水的大孔隙土层",{"key":28,"text":419,"correct":22},"非饱和水的黏土层",{"key":31,"text":421,"correct":26},"膨胀土层",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},1146462,"在立井施工中，（）工作约占整个掘进工作循环时间的50％～60％，是决定立井施工速度的关键工作。",[426,428,430,432],{"key":20,"text":427,"correct":26},"钻眼爆破",{"key":24,"text":429,"correct":22},"装岩提升",{"key":28,"text":431,"correct":26},"井筒支护",{"key":31,"text":433,"correct":26},"通风与排水",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":24,"analysis":33},1146463,"综合机械化施工配套作业线设备配套方案适用于井筒直径（）m、井筒深度（）m的大型凿井工程。",[438,440,442,444],{"key":20,"text":439,"correct":26},"5-12m；300-600m",{"key":24,"text":441,"correct":22},"5-12m；400-1000m",{"key":28,"text":443,"correct":26},"8-15m；300-600m",{"key":31,"text":445,"correct":26},"8-15m；400-1000m",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":31,"analysis":33},1146464,"钻井法凿井施工中，泥浆洗井具有（）的作用。",[450,452,454,456],{"key":20,"text":451,"correct":26},"保证井壁清洁",{"key":24,"text":453,"correct":26},"提高钻机扭矩",{"key":28,"text":455,"correct":26},"粉碎土块",{"key":31,"text":457,"correct":22},"保护井壁防止片帮",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":28,"analysis":33},1146465,"平硐开拓方式与立井、斜井开拓方式的主要区别是（）。",[462,464,466,468],{"key":20,"text":463,"correct":26},"井田内的划分方式不同",{"key":24,"text":465,"correct":26},"巷道布置方式不同",{"key":28,"text":467,"correct":22},"进入矿层的方式不同",{"key":31,"text":469,"correct":26},"矿产资源的开采方式不同",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":31,"analysis":33},1146466,"在平硐开拓方式中，为排水方便，平硐必须有（）的流水坡度。",[474,476,478,480],{"key":20,"text":475,"correct":26},"2‰～4‰",{"key":24,"text":477,"correct":26},"2‰～5‰",{"key":28,"text":479,"correct":26},"3‰～4‰",{"key":31,"text":481,"correct":22},"3‰～5‰",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},1146467,"关于矿井主要通风机的性质，说法正确的是其（）。",[486,488,490,492],{"key":20,"text":487,"correct":26},"为矿井中功率最大的风机",{"key":24,"text":489,"correct":22},"服务于整个矿井或其一分区",{"key":28,"text":491,"correct":26},"用于解决系统中风量不够问题",{"key":31,"text":493,"correct":26},"安装在井下",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":28,"analysis":33},1146468,"深立井井筒施工时，为了增大通风系统的风压，提高通风效果，合理的通风方式是（）。",[498,500,502,504],{"key":20,"text":499,"correct":26},"压入式为主，辅以抽出式",{"key":24,"text":501,"correct":26},"并联抽出式",{"key":28,"text":503,"correct":22},"抽出式为主、辅以压入式",{"key":31,"text":505,"correct":26},"并联压入式",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":31,"analysis":33},1146469,"属于立井井筒表土普通法施工的是（）。",[510,512,514,516],{"key":20,"text":511,"correct":26},"沉井法",{"key":24,"text":513,"correct":26},"冻结法",{"key":28,"text":515,"correct":26},"钻井法",{"key":31,"text":517,"correct":22},"板桩法",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},1146470,"关于钻井法凿井的钻井与井壁施工的先后关系，说法正确的是（）。",[522,524,526,528],{"key":20,"text":523,"correct":22},"钻完后下沉井壁",{"key":24,"text":525,"correct":26},"钻一段沉一段",{"key":28,"text":527,"correct":26},"先下沉后钻井",{"key":31,"text":529,"correct":26},"与钻头同时跟进",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":28,"analysis":33},1146471,"冻结工程中，冻结孔的圈数一般根据（）来确定。",[534,536,538,540],{"key":20,"text":535,"correct":26},"冻土强度",{"key":24,"text":537,"correct":26},"冻结速度",{"key":28,"text":539,"correct":22},"冻结壁厚度",{"key":31,"text":541,"correct":26},"制冷液种类",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":20,"analysis":33},1146472,"用于施工井壁混凝土的模板，其组装后的外沿半径应（）。",[546,548,550,552],{"key":20,"text":547,"correct":22},"较井筒设计净半径大1～4cm",{"key":24,"text":549,"correct":26},"较井筒内径小1～4cm",{"key":28,"text":551,"correct":26},"等于井筒设计净半径",{"key":31,"text":553,"correct":26},"等于井筒设计荒半径",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":28,"analysis":33},1146473,"井筒采用短段掘砌法施工时，混凝土浇筑模板应在混凝土强度达到（）时拆模。",[558,560,562,564],{"key":20,"text":559,"correct":26},"0．07～0．1MPa",{"key":24,"text":561,"correct":26},"0．5～1．0MPa",{"key":28,"text":563,"correct":22},"0．7～1．0MPa",{"key":31,"text":565,"correct":26},"1．5～2．0MPa",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":31,"analysis":33},1146474,"关于巷道施工的掘进与永久支护顺序作业方式特点，说法正确的是其（）。",[570,572,574,576],{"key":20,"text":571,"correct":26},"要求巷道断面大",{"key":24,"text":573,"correct":26},"作业人员多",{"key":28,"text":575,"correct":26},"施工人员分工明确",{"key":31,"text":577,"correct":22},"成巷速度较慢",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":31,"analysis":33},1146475,"在巷道掘进循环中占时最多的工序是（）。",[582,584,585,586],{"key":20,"text":583,"correct":26},"永久支护",{"key":24,"text":427,"correct":26},{"key":28,"text":372,"correct":26},{"key":31,"text":587,"correct":22},"装载运输",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":28,"analysis":33},1146476,"关于斜井明洞衬砌施工程序，正确的是（）。",[592,594,596,598],{"key":20,"text":593,"correct":26},"立模板后绑扎钢筋",{"key":24,"text":595,"correct":26},"浇筑混凝土后应加固模板",{"key":28,"text":597,"correct":22},"等混凝土达到强度后再拆模板",{"key":31,"text":599,"correct":26},"拆模后可即回填",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":20,"analysis":33},1146477,"通常情况下，全断面一次掘进硐室的高度不应超过（）。",[604,606,608,610],{"key":20,"text":605,"correct":22},"4～5m",{"key":24,"text":607,"correct":26},"5～6m",{"key":28,"text":609,"correct":26},"6～7m",{"key":31,"text":611,"correct":26},"7～8m",[613,616,619,622,625,628],{"id":15,"name":614,"category":7,"favorite":615},"领导干部任职前廉政法规知识测试题",92,{"id":617,"name":618,"category":7,"favorite":15},595,"建筑结构与设备",{"id":620,"name":621,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":623,"name":624,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":626,"name":627,"category":7,"favorite":8},534,"BIM工程师",{"id":629,"name":627,"category":7,"favorite":8},535]