[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-801-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":68},{"id":5,"name":6,"category":7,"favorite":8},801,"一建矿业工程实务","建筑工程",0,33,50,1603,[13,38,53],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1147932,2,"多选题","下列《金属非金属露天矿山安全规程》的要求，说法正确的是（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","露天采场的出入沟口、平硐口和工业场地等处，都必须采取妥善的防洪措施",true,{"key":24,"text":25,"correct":22},"B","矿山必须按设计要求建立完整的排水系统",{"key":27,"text":28,"correct":22},"C","靠近矿山铁路修筑建构筑物，都必须事先征得矿山运输和安全部门同意",{"key":30,"text":31,"correct":32},"D","堆放物的边缘与铁路建筑接近限界的距离，不得小于0．25m",false,{"key":34,"text":35,"correct":22},"E","露天矿边界上覆盖的松散岩土层厚度超过2m时，其倾角应小于自然安息角","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1147933,"以下关于尾矿库闭库的规定，符合要求的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":32},"尾矿库使用到设计年限就应闭库",{"key":24,"text":45,"correct":22},"尾矿库应在到期前12个月内进行闭库设计",{"key":27,"text":47,"correct":32},"尾矿库闭库必须有新建尾矿库衔接",{"key":30,"text":49,"correct":22},"闭库设计应经省级以上安检部门审查",{"key":34,"text":51,"correct":22},"尾矿库闭库工作及闭库后的安全管理由原生产经营单位负责","BDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1147934,"金属非金属露天矿山施工中，必须事先制定施工安全措施、征得矿山运输和安全部门同意和批准的施工内容包括（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"横穿路基架设电线",{"key":24,"text":60,"correct":22},"跨越矿山铁路",{"key":27,"text":62,"correct":22},"靠近露天矿山铁路修建构筑物",{"key":30,"text":64,"correct":32},"大型设备穿越涵洞",{"key":34,"text":66,"correct":32},"在矿山铁路两侧堆放物品","ABC",[69,73,76,79,82,85],{"id":70,"name":71,"category":7,"favorite":72},1,"领导干部任职前廉政法规知识测试题",92,{"id":74,"name":75,"category":7,"favorite":70},595,"建筑结构与设备",{"id":77,"name":78,"category":7,"favorite":70},715,"招标采购专业知识与法律法规",{"id":80,"name":81,"category":7,"favorite":70},848,"市政方向-通用基础",{"id":83,"name":84,"category":7,"favorite":8},534,"BIM工程师",{"id":86,"name":84,"category":7,"favorite":8},535]