[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-801-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":741},{"id":5,"name":6,"category":7,"favorite":8},801,"一建矿业工程实务","建筑工程",0,30,50,1603,[13,38,53,68,83,98,113,127,142,156,171,185,199,213,227,242,257,271,285,299,313,328,343,357,371,385,400,414,428,443,458,472,487,502,516,530,544,558,572,586,600,614,628,642,656,670,685,699,713,727],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1147782,2,"多选题","关于矿井防治水的说法，正确的是( )。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","采取了防护措施后，可以在防隔水煤(岩)柱中采掘",false,{"key":24,"text":25,"correct":26},"B","在矿井有突水危险的采掘区域，应当在其附近设置防水闸门",true,{"key":28,"text":29,"correct":22},"C","对于防治老空老窑水而言，最好的防治水策略是以堵为主",{"key":31,"text":32,"correct":26},"D","矿井水的形成一般是由于巷道揭露和采空区塌陷而波及水源所致",{"key":34,"text":35,"correct":26},"E","井下探放水应当采用专用钻机、由专业人员和专职探放水队伍进行施工","BDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1147783,"关于岩层底板等高线图的说法，正确的是( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"岩层底板等高线图中的每一条等高线都应有高度的标注",{"key":24,"text":45,"correct":22},"经过同一位置点的等高线，其绝对高度都必然相等",{"key":28,"text":47,"correct":22},"岩层底板等高线图中的所有等高线都是一条不间断的闭合曲线",{"key":31,"text":49,"correct":26},"等高线发生弯曲，则表明该底板出现变向",{"key":34,"text":51,"correct":26},"等高线变得稀疏，则该岩层变得平缓","ADE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1147784,"影响施工测量控制网精度要求的因素有( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"测量方法",{"key":24,"text":60,"correct":26},"建筑材料",{"key":28,"text":62,"correct":26},"结构形式",{"key":31,"text":64,"correct":26},"施工方法",{"key":34,"text":66,"correct":22},"测量仪器要求","BCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1147785,"关于井筒施工的测量工作，做法正确的是( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"通常井壁竖直度检查采用井筒中心线完成",{"key":24,"text":75,"correct":22},"井筒掘进不允许采用激光指向",{"key":28,"text":77,"correct":26},"井壁砌筑采用激光指向时的偏差不得超过5mm",{"key":31,"text":79,"correct":26},"井筒掘进到装载硐室时应重新测量井深",{"key":34,"text":81,"correct":26},"井筒到底后的巷道掘进，有重新定向的测量要求","CDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1147786,"井巷贯通的形式有( )。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"一井巷道贯通或两井巷道贯通",{"key":24,"text":90,"correct":22},"三井贯通",{"key":28,"text":92,"correct":26},"立井贯通",{"key":31,"text":94,"correct":22},"斜井贯通",{"key":34,"text":96,"correct":26},"井筒向深部延伸贯通","ACE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1147787,"关于测量仪器使用方法和功能的说法，正确的是( )。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"经纬仪可以获得测点的三维坐标",{"key":24,"text":105,"correct":26},"水准仪通过前后视差计算相对高程",{"key":28,"text":107,"correct":26},"用钢尺测量应按距离等情况修正",{"key":31,"text":109,"correct":22},"全站仪属于全球定位系统",{"key":34,"text":111,"correct":26},"光电测距仪测距要与经纬仪配合使用","BCE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":67,"analysis":37},1147788,"关于土的坚实程度评价，正确的是( )。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"一类土属于特坚硬土",{"key":24,"text":120,"correct":26},"松软土主要用锹和锄头挖掘",{"key":28,"text":122,"correct":26},"软与中等密实黏土属于坚土",{"key":31,"text":124,"correct":26},"砂土挖掘只有少许要用镐翻松",{"key":34,"text":126,"correct":22},"四类土以上不具有岩石的坚硬性质",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1147789,"关于矿业工程项目的特点，说法比较合理的是（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"矿井地质资料不准的重要因素是客观上勘察能力不够",{"key":24,"text":134,"correct":26},"矿业工程必须有井上和井下系统间的联系",{"key":28,"text":136,"correct":26},"矿井施工必须从地上通过井筒向地下逐步进行",{"key":31,"text":138,"correct":22},"每个矿山工业场地都布置有自己的选矿生产系统",{"key":34,"text":140,"correct":22},"矿业工程项目内容到公路或铁路的储运站为止","ABC",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":112,"analysis":37},1147790,"井筒施工中的井身工程，其分项工程包括（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"井颈工程",{"key":24,"text":149,"correct":26},"掘进工程",{"key":28,"text":151,"correct":26},"模板工程",{"key":31,"text":153,"correct":22},"支护工程",{"key":34,"text":155,"correct":26},"钢筋工程",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1147791,"矿业工程建造师从事的行业范畴包括有（ ）等建设方面。",[160,162,164,166,168],{"key":20,"text":161,"correct":26},"黄金矿山",{"key":24,"text":163,"correct":26},"冶金矿山",{"key":28,"text":165,"correct":26},"建材工业矿山",{"key":31,"text":167,"correct":26},"核工业(铀)矿山",{"key":34,"text":169,"correct":22},"煤层气","ABCD",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":184,"analysis":37},1147792,"某井筒工程表土段采用钢筋混凝土结构，基岩段用锚喷作为临时支护，永久支护采用素混凝土结构，则该井筒中属于子分部工程的内容是（ ）。",[175,177,179,181,182],{"key":20,"text":176,"correct":26},"钢筋混凝土结构工程",{"key":24,"text":178,"correct":26},"素混凝土结构工程",{"key":28,"text":180,"correct":22},"锚喷支护结构工程",{"key":31,"text":151,"correct":22},{"key":34,"text":183,"correct":22},"现浇混凝土工程","AB",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":112,"analysis":37},1147793,"为避免矿山安全事故，正确的做法有（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"掌握准确无误的地质勘察资料",{"key":24,"text":192,"correct":26},"遵循施工规程和安全规程",{"key":28,"text":194,"correct":26},"保证作业人员佩戴、使用劳动保护用品",{"key":31,"text":196,"correct":22},"落实作业人员的保险政策",{"key":34,"text":198,"correct":26},"做好矿山易发事故的控制",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":141,"analysis":37},1147794,"关于施工组织设计，下列说法正确的是（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":26},"施工组织设计是项目实施的依据",{"key":24,"text":206,"correct":26},"没有施工组织设计，单项工程不能进行施工准备",{"key":28,"text":208,"correct":26},"没有施工组织设计，单位工程不能开工",{"key":31,"text":210,"correct":22},"在施工组织设计中必须编制有地质勘探报告",{"key":34,"text":212,"correct":22},"有了施工组织设计，单位工程就可以开工",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":112,"analysis":37},1147795,"应编制单项工程施工组织设计的工程有（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"地面预注浆工程",{"key":24,"text":220,"correct":26},"矿井工程",{"key":28,"text":222,"correct":26},"与干线连接的矿区标准铁路",{"key":31,"text":224,"correct":22},"井筒工程",{"key":34,"text":226,"correct":26},"选矿厂工程",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":241,"analysis":37},1147796,"矿业工程的单项工程施工组织设计的编制依据包括有（ ）。",[231,233,235,237,239],{"key":20,"text":232,"correct":26},"合同或协议",{"key":24,"text":234,"correct":26},"工程总概算",{"key":28,"text":236,"correct":22},"施工图设计",{"key":31,"text":238,"correct":26},"地质精查报告",{"key":34,"text":240,"correct":22},"企业定额","ABD",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},1147797,"下列关于矿井项目的工程施工安排，说法合理的是（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"根据主要矛盾线上关键工程的自由时差和总时差大小安排各项投入",{"key":24,"text":249,"correct":22},"施工准备期应以安排井筒开工以及相关准备工作为主",{"key":28,"text":251,"correct":26},"矿井设备安装工程应以其在联合试运转之前完成为原则",{"key":31,"text":253,"correct":22},"重大设备到场时间应尽量提前，以有备无患",{"key":34,"text":255,"correct":26},"可按合同要求，部分工程内容可以移交后再施工","CE",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":184,"analysis":37},1147798,"关于井筒工程的施工顺序，以下考虑正确的是（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":26},"主井工作量一般比较大，因此主井往往先于副井开工",{"key":24,"text":264,"correct":26},"主井与副井同时开工要求的人力、财力投入比较大",{"key":28,"text":266,"correct":22},"当风井与主、副井距离比较远时，要求其较主、副井先开工",{"key":31,"text":268,"correct":22},"要求主井与副井同时到底的好处是可以比较两队的施工水平",{"key":34,"text":270,"correct":22},"主井在副井建成后再施工可给主井提供可靠的地质资料",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":52,"analysis":37},1147799,"关于三类工程平衡的做法，正确的是（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":26},"矿、土、安工程平衡要以关键线路为基础",{"key":24,"text":278,"correct":22},"土建、安装工程都应排在矿建工程后面进行",{"key":28,"text":280,"correct":22},"施工准备期不要安排土建、安装的永久工程内容",{"key":31,"text":282,"correct":26},"一般民用建筑工程可以集中在竣工前兴建或完成",{"key":34,"text":284,"correct":26},"机电设备进场应考虑相应工程的排队，不宜过早",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":241,"analysis":37},1147800,"井筒到底后，为满足快速安全施工的要求，井底车场可能需要增加的临时工程有（ ）。",[289,291,293,295,297],{"key":20,"text":290,"correct":26},"临时水仓",{"key":24,"text":292,"correct":26},"临时变电所",{"key":28,"text":294,"correct":22},"临时炸药库",{"key":31,"text":296,"correct":26},"临时贯通道",{"key":34,"text":298,"correct":22},"临时装载硐室",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":112,"analysis":37},1147801,"属于矿井项目工程施工组织设计的技术经济指标的是（ ）。",[303,305,307,309,311],{"key":20,"text":304,"correct":22},"施工准备工期长短",{"key":24,"text":306,"correct":26},"井筒及主要巷道月进度指标",{"key":28,"text":308,"correct":26},"建筑安装工人劳动生产率",{"key":31,"text":310,"correct":22},"大型机械台班用量及费用",{"key":34,"text":312,"correct":26},"临时工程预算占矿井建筑安装工程总投资的比重",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":327,"analysis":37},1147802,"矿业工程施工顺序的安排中，需要优先考虑的项目是（ ）。",[317,319,321,323,325],{"key":20,"text":318,"correct":22},"临时工程",{"key":24,"text":320,"correct":26},"关键工程",{"key":28,"text":322,"correct":26},"井下供电系统",{"key":31,"text":324,"correct":26},"井下排水系统",{"key":34,"text":326,"correct":26},"通风系统","BCDE",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":342,"analysis":37},1147803,"井巷工程过渡期的排水工作安排，做法正确的是（ ）。",[332,334,336,338,340],{"key":20,"text":333,"correct":26},"主、副井筒贯通前的两井筒排水工作仍由各自凿井期的排水设施完成",{"key":24,"text":335,"correct":26},"贯通后，主井进行改装期井下涌水集中到副井排出",{"key":28,"text":337,"correct":22},"主井临时罐笼提升期的主、副井筒涌水均由矿车通过罐笼提升排水",{"key":31,"text":339,"correct":26},"临时罐笼提升期的涌水如过大，则可以设置包含临时水仓、泵房的排水系统",{"key":34,"text":341,"correct":26},"永久水仓、泵房应尽早建成并投入使用","ABDE",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":170,"analysis":37},1147804,"矿业工程施工准备工作的内容包括（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":26},"技术准备",{"key":24,"text":350,"correct":26},"工程准备",{"key":28,"text":352,"correct":26},"物资准备",{"key":31,"text":354,"correct":26},"劳动力准备",{"key":34,"text":356,"correct":22},"资质与法律文件准备",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":241,"analysis":37},1147805,"施工准备阶段要编制的计划和相应落实的工作内容包括（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":26},"劳力需要量计划和生活设施准备",{"key":24,"text":364,"correct":26},"材料需要量计划和场地准备",{"key":28,"text":366,"correct":22},"施工机械需要量计划和安装设备进场工作",{"key":31,"text":368,"correct":26},"施工图供应计划和会审工作安排",{"key":34,"text":370,"correct":22},"工业场地用地计划和购置工作",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":97,"analysis":37},1147806,"工业广场地面施工总平面布置的设计依据，包括（ ）。",[375,377,379,381,383],{"key":20,"text":376,"correct":26},"工程项目的总平面设计图纸",{"key":24,"text":378,"correct":22},"井筒地质检查钻孔位置设计方案",{"key":28,"text":380,"correct":26},"工业广场工程地质与水文地质图",{"key":31,"text":382,"correct":22},"地质构造图",{"key":34,"text":384,"correct":26},"临时工程建筑项目表",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":399,"analysis":37},1147807,"施工总平面布置设计原则包括（ ）。",[389,391,393,395,397],{"key":20,"text":390,"correct":26},"不影响永久性建筑物的施工",{"key":24,"text":392,"correct":26},"有利于施工",{"key":28,"text":394,"correct":26},"方便运输",{"key":31,"text":396,"correct":22},"便于办公需要",{"key":34,"text":398,"correct":26},"安全与卫生要求","ABCE",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":327,"analysis":37},1147808,"在施工准备阶段中，施工单位确定分包商后尚应完成（ ）等协调工作。",[404,406,408,410,412],{"key":20,"text":405,"correct":22},"检查和落实分包商的资质条件",{"key":24,"text":407,"correct":26},"建立与分包商的工作联系制度",{"key":28,"text":409,"correct":26},"检查分包商的项目进度计划",{"key":31,"text":411,"correct":26},"提供和落实分包项目的施工图纸",{"key":34,"text":413,"correct":26},"审核分包商的施工安全规程",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":52,"analysis":37},1147809,"以下对影响矿业工程项目工期的分析，正确的是（ ）。",[418,420,422,424,426],{"key":20,"text":419,"correct":26},"矿井实际地质条件变复杂会延长工期",{"key":24,"text":421,"correct":22},"工期影响与施工单位的资金储备无关",{"key":28,"text":423,"correct":22},"保证设备供应不影响进度的措施就是做到设备及时到位",{"key":31,"text":425,"correct":26},"技术措施不当是影响工期的重要因素",{"key":34,"text":427,"correct":26},"对意外情况有预案能减少不利因素的影响",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":442,"analysis":37},1147810,"建井总工期是以下（ ）的工期之和。",[432,434,436,438,440],{"key":20,"text":433,"correct":26},"施工准备期",{"key":24,"text":435,"correct":22},"矿井投产工期",{"key":28,"text":437,"correct":26},"矿井竣工工期",{"key":31,"text":439,"correct":22},"巷道施工期",{"key":34,"text":441,"correct":22},"井筒施工工期","AC",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":457,"analysis":37},1147811,"矿山工程进度计划编制的基本程序，正确的是（ ）。",[447,449,451,453,455],{"key":20,"text":448,"correct":22},"绘制初步网络计划在调查研究之前",{"key":24,"text":450,"correct":26},"确定方案在调查研究之后",{"key":28,"text":452,"correct":26},"划分工序在方案确定之后",{"key":31,"text":454,"correct":22},"确定初始网络图(或横道图)后就可以确定进度计划",{"key":34,"text":456,"correct":22},"编制进度计划和资源能力没有关系","BC",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":327,"analysis":37},1147812,"与横道图计划相比，网络计划的主要优点有（ ）。",[462,464,466,468,470],{"key":20,"text":463,"correct":22},"形象、直观，且易于编制和理解",{"key":24,"text":465,"correct":26},"可以找出关键线路和关键工作",{"key":28,"text":467,"correct":26},"可以明确各项工作的机动时间",{"key":31,"text":469,"correct":26},"可以利用计算机进行计算、优化和调整",{"key":34,"text":471,"correct":26},"能明确表达各项工作之间的逻辑关系",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":486,"analysis":37},1147813,"通常，要加快一条巷道的施工进度，可考虑采用的手段有（ ）。",[476,478,480,482,484],{"key":20,"text":477,"correct":26},"平行作业或平行施工方法",{"key":24,"text":479,"correct":22},"实现多个工作面的多头作业",{"key":28,"text":481,"correct":22},"一天24h连续作业",{"key":31,"text":483,"correct":22},"取消放炮后的通风T序",{"key":34,"text":485,"correct":26},"采用多台钻机同时作业","AE",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":501,"analysis":37},1147814,"下列施工单位为避免进度受影响所做的工作，合理的是（ ）。",[491,493,495,497,499],{"key":20,"text":492,"correct":26},"检查和审核设计图纸符合现场条件",{"key":24,"text":494,"correct":26},"指正会审图纸中的交底不清楚问题",{"key":28,"text":496,"correct":22},"拒绝业主对图纸的修改",{"key":31,"text":498,"correct":22},"对设计内容进行变更",{"key":34,"text":500,"correct":26},"按施工图纸进行技术交底和培训","ABE",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":170,"analysis":37},1147815,"矿山工程进度拖延时，正确的事后措施包括有（ ）。",[506,508,510,512,514],{"key":20,"text":507,"correct":26},"分析原因和影响工期程度",{"key":24,"text":509,"correct":26},"经过业主同意，删减工程量或工程范围",{"key":28,"text":511,"correct":26},"采用外包方法请专业公司帮助解决",{"key":31,"text":513,"correct":26},"分析网络计划，根据影响工期与否选择是否调整资源投入",{"key":34,"text":515,"correct":22},"集中到验收前一并处理",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":67,"analysis":37},1147816,"以下关于矿井工程施工重要节点的判断，正确的是（ ）。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"第一个矿井动工的关节是完成广场购地",{"key":24,"text":523,"correct":26},"两井筒同时到底是影响后续工程进度的重要因素",{"key":28,"text":525,"correct":26},"井筒到底是井底全面开始巷道工程的关节",{"key":31,"text":527,"correct":26},"副井永久装备开始是其绞车房工程成为施工重点的标志",{"key":34,"text":529,"correct":22},"完成主井装载硐室施工是开始井底车场工程的标志",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":342,"analysis":37},1147817,"加快井巷工程关键路线施工速度的方法有（ ）。",[534,536,538,540,542],{"key":20,"text":535,"correct":26},"全面规划，统筹安排，综合平衡",{"key":24,"text":537,"correct":26},"采取平行交叉作业施工方法",{"key":28,"text":539,"correct":22},"合理制定井巷施工进度指标",{"key":31,"text":541,"correct":26},"优选重点队伍施工关键工作",{"key":34,"text":543,"correct":26},"采用新工艺、新技术、新装备，提高井巷工程单进水平",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":342,"analysis":37},1147818,"避免施工中出现不利施工因素而影响进度的合理方法，包括（ ）。",[548,550,552,554,556],{"key":20,"text":549,"correct":26},"必要的补充地质勘探",{"key":24,"text":551,"correct":26},"准备阶段充分的调研",{"key":28,"text":553,"correct":22},"采用完全可靠的方案",{"key":31,"text":555,"correct":26},"施工组织设计有预案",{"key":34,"text":557,"correct":26},"严格遵循安全规程和施丁．规程",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":170,"analysis":37},1147819,"质量控制的影响因素通常指的是下列哪些因素（ ）。",[562,564,566,568,570],{"key":20,"text":563,"correct":26},"人",{"key":24,"text":565,"correct":26},"料(材料)",{"key":28,"text":567,"correct":26},"机(设备)",{"key":31,"text":569,"correct":26},"法(方法)",{"key":34,"text":571,"correct":22},"工期",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":241,"analysis":37},1147820,"施工环境是质量控制的影响因素，下列哪些属于施工环境的因素（ ）。",[576,578,580,582,584],{"key":20,"text":577,"correct":26},"工程技术环境",{"key":24,"text":579,"correct":26},"管理环境",{"key":28,"text":581,"correct":22},"场外交通环境",{"key":31,"text":583,"correct":26},"作业环境",{"key":34,"text":585,"correct":22},"自然环境",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":141,"analysis":37},1147821,"抽样本身就是质量检验的一种方法，根据抽样形式决定的检验方法，可以分为（ ）。",[590,592,594,596,598],{"key":20,"text":591,"correct":26},"全检",{"key":24,"text":593,"correct":26},"抽查",{"key":28,"text":595,"correct":26},"免检",{"key":31,"text":597,"correct":22},"专检",{"key":34,"text":599,"correct":22},"破坏性检验",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":442,"analysis":37},1147822,"在工序能力分析方法中，通常以。为标准衡量工序能力，下列说法正确的是（ ）。",[604,606,608,610,612],{"key":20,"text":605,"correct":26},"σ值越大，工序特性值的波动越大，说明工序能力越小；",{"key":24,"text":607,"correct":22},"σ值越大，工序特性值的波动越大，说明工序能力越大；",{"key":28,"text":609,"correct":26},"σ值越小，工序特|生值的波动越小，说明工序能力越大；",{"key":31,"text":611,"correct":22},"σ值越小，工序特性值的波动越小，说明工序能力越小；",{"key":34,"text":613,"correct":22},"σ值较大时，工序特性值的波动可以忽略",{"id":615,"libraryId":5,"type":15,"typeLabel":16,"stem":616,"options":617,"answer":170,"analysis":37},1147823,"下列属于施工质量分析方法的有（ ）。",[618,620,622,624,626],{"key":20,"text":619,"correct":26},"工序能力分析方法",{"key":24,"text":621,"correct":26},"控制图法",{"key":28,"text":623,"correct":26},"因果分析图法",{"key":31,"text":625,"correct":26},"排列图法",{"key":34,"text":627,"correct":22},"抽样检验法",{"id":629,"libraryId":5,"type":15,"typeLabel":16,"stem":630,"options":631,"answer":399,"analysis":37},1147824,"建(构)筑物应进行专门的施工勘察的情况有（ ）。",[632,634,636,638,640],{"key":20,"text":633,"correct":26},"开挖基槽发现土质、土层结构与勘察资料不符时",{"key":24,"text":635,"correct":26},"为地基处理，需进一步提供勘察资料时",{"key":28,"text":637,"correct":26},"工程地质条件复杂，详勘阶段难以查清时",{"key":31,"text":639,"correct":22},"施工单位为方便工程施工时",{"key":34,"text":641,"correct":26},"在施工时出现新的岩土工程地质问题时",{"id":643,"libraryId":5,"type":15,"typeLabel":16,"stem":644,"options":645,"answer":327,"analysis":37},1147825,"关于尾矿坝坝基开挖及岸坡处理施工的要求，正确的是（ ）。",[646,648,650,652,654],{"key":20,"text":647,"correct":22},"开挖清理坝肩岸坡工作可边填筑边开挖",{"key":24,"text":649,"correct":26},"天然黏性土坝基可预留保护层",{"key":28,"text":651,"correct":26},"坝基易风化的岩石，应留保护层",{"key":31,"text":653,"correct":26},"灌浆法处理坝基应在施工现场进行灌浆试验",{"key":34,"text":655,"correct":26},"开挖清理坝肩岸坡工作宜自上而下一次完成",{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":67,"analysis":37},1147826,"根据《煤矿井巷工程施工规范》GB50511--2010规定，说法正确的有（ ）。",[660,662,664,666,668],{"key":20,"text":661,"correct":22},"松软破碎的大断面巷道采用全断面爆破，利于陕速施工",{"key":24,"text":663,"correct":26},"巷道采用锚喷作永久支护时，永久支护与掘进工作面问的距离不宜大于40m",{"key":28,"text":665,"correct":26},"巷道采用砌碹支护时，临时支护应紧跟工作面",{"key":31,"text":667,"correct":26},"永久水沟距掘进工作面不宜大于40m",{"key":34,"text":669,"correct":22},"在有条件的情况下，岩石巷道宜采用掘进机掘进",{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":684,"analysis":37},1147827,"露天矿疏干井工程填砾施工，说法正确的是（ ）。",[674,676,678,680,682],{"key":20,"text":675,"correct":26},"含泥土杂质较多的砾料，应用水冲洗干净后使用",{"key":24,"text":677,"correct":22},"现场储备的砾料不应大于设计值的1．2倍",{"key":28,"text":679,"correct":22},"填砾应采用静水填砾法",{"key":31,"text":681,"correct":26},"填砾应从孔口井管四周均匀填入，不得从单一方位填入",{"key":34,"text":683,"correct":22},"砾料填至预定位置后，无需测定填砾面位置","AD",{"id":686,"libraryId":5,"type":15,"typeLabel":16,"stem":687,"options":688,"answer":97,"analysis":37},1147828,"符合立井井筒基岩爆破作业规定的有（ ）。",[689,691,693,695,697],{"key":20,"text":690,"correct":26},"短段掘砌混合作业的眼深应为3．5～5．0m",{"key":24,"text":692,"correct":22},"宜采用低威力、防水性能好的水胶炸药",{"key":28,"text":694,"correct":26},"浅眼多循环作业的眼深应为1．2～2．0m",{"key":31,"text":696,"correct":22},"周边眼药卷直径不小于45mm",{"key":34,"text":698,"correct":26},"光面爆破周边眼的眼距应控制在0．4～0．6m",{"id":700,"libraryId":5,"type":15,"typeLabel":16,"stem":701,"options":702,"answer":170,"analysis":37},1147829,"下列关于矿山井巷工程中单位(子单位)工程质量合格条件的说法正确的是（ ）。",[703,705,707,709,711],{"key":20,"text":704,"correct":26},"单位工程的各分部工程合格",{"key":24,"text":706,"correct":26},"质量控制资料文件应完整",{"key":28,"text":708,"correct":26},"各分部工程有关安全和功能的检测资料应复查完整",{"key":31,"text":710,"correct":26},"主要功能项目的抽查结果应符合相关专业质量验收规范的规定",{"key":34,"text":712,"correct":22},"观感质量得分率应达到65％及以上",{"id":714,"libraryId":5,"type":15,"typeLabel":16,"stem":715,"options":716,"answer":241,"analysis":37},1147830,"锚喷支护巷道工程质量评定中的主控项目包括（ ）。",[717,719,721,723,725],{"key":20,"text":718,"correct":26},"锚杆杆体及配件的材质、品种、规格和强度",{"key":24,"text":720,"correct":26},"锚杆锚固药卷的材质、规格、配比和性能",{"key":28,"text":722,"correct":22},"锚杆的间距和排距",{"key":31,"text":724,"correct":26},"喷射混凝土材料的质量",{"key":34,"text":726,"correct":22},"锚杆的外露长度",{"id":728,"libraryId":5,"type":15,"typeLabel":16,"stem":729,"options":730,"answer":141,"analysis":37},1147831,"土工合成材料地基的主控项目是（ ）。",[731,733,735,737,739],{"key":20,"text":732,"correct":26},"土工合成材料强度",{"key":24,"text":734,"correct":26},"土工合成材料延伸率",{"key":28,"text":736,"correct":26},"地基承载力",{"key":31,"text":738,"correct":22},"土工合成材料搭接长度",{"key":34,"text":740,"correct":22},"每层铺设厚度",[742,746,749,752,755,758],{"id":743,"name":744,"category":7,"favorite":745},1,"领导干部任职前廉政法规知识测试题",92,{"id":747,"name":748,"category":7,"favorite":743},595,"建筑结构与设备",{"id":750,"name":751,"category":7,"favorite":743},715,"招标采购专业知识与法律法规",{"id":753,"name":754,"category":7,"favorite":743},848,"市政方向-通用基础",{"id":756,"name":757,"category":7,"favorite":8},534,"BIM工程师",{"id":759,"name":757,"category":7,"favorite":8},535]