[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-801-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":738},{"id":5,"name":6,"category":7,"favorite":8},801,"一建矿业工程实务","建筑工程",0,28,50,1603,[13,38,53,68,83,97,112,127,142,157,172,186,200,215,229,243,257,271,285,300,315,329,343,358,369,384,399,414,429,443,457,471,485,499,514,528,542,556,570,584,598,612,626,640,654,668,682,696,710,724],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1147682,2,"多选题","矿井地面变电所应当设置在( )。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","炸药库附近",false,{"key":24,"text":25,"correct":22},"B","井底车场水平的副井附近",{"key":27,"text":28,"correct":29},"C","绞车房附近",true,{"key":31,"text":32,"correct":29},"D","压风机房附近",{"key":34,"text":35,"correct":29},"E","与公路相连接","CDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1147683,"地面炸药库区内的设施布置，应考虑包括( )的安全距离。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"库区与居住区间",{"key":24,"text":45,"correct":29},"库房间殉爆",{"key":27,"text":47,"correct":22},"炸药库与库区间",{"key":31,"text":49,"correct":29},"库区与输电线路间",{"key":34,"text":51,"correct":29},"库区与道路","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1147684,"应布置在下风一侧的建筑、设备库房的有( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"坑木场",{"key":24,"text":60,"correct":29},"锅炉房",{"key":27,"text":62,"correct":22},"压风机房",{"key":31,"text":64,"correct":29},"破碎筛分厂",{"key":34,"text":66,"correct":22},"绞车房","ABD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1147685,"关于高强螺栓连接，下列说法正确的是（）。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"高强螺栓采用高强钢材制作，可施加较大的预紧力",{"key":24,"text":75,"correct":29},"高强螺栓分为摩擦型和承压型连接",{"key":27,"text":77,"correct":29},"摩擦型高强螺栓连接具有在动力载荷下不易松动的优点",{"key":31,"text":79,"correct":29},"承压型高强螺栓连接在摩擦力被克服之后剪切变形较大",{"key":34,"text":81,"correct":22},"承压型高强螺栓常用于直接承受动力载荷结构的连接","ABCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":82,"analysis":37},1147686,"井点降水方法按其系统的设置和原理不同，井点类型有( )。",[87,89,91,93,95],{"key":20,"text":88,"correct":29},"轻型井点",{"key":24,"text":90,"correct":29},"喷射井点",{"key":27,"text":92,"correct":29},"管井井点",{"key":31,"text":94,"correct":29},"深井井点",{"key":34,"text":96,"correct":22},"环形井点",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1147687,"集水明排法适用于( )土层。",[101,103,105,107,109],{"key":20,"text":102,"correct":29},"粗粒",{"key":24,"text":104,"correct":22},"粉砂",{"key":27,"text":106,"correct":22},"细砂",{"key":31,"text":108,"correct":22},"渗水量大的黏土层",{"key":34,"text":110,"correct":29},"渗水量小的黏土层","AE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1147688,"按受力特点及材料性能，基础可分为( )。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"条形基础",{"key":24,"text":119,"correct":22},"独立基础",{"key":27,"text":121,"correct":29},"刚性基础",{"key":31,"text":123,"correct":29},"柔性基础",{"key":34,"text":125,"correct":22},"箱形基础","CD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1147689,"地基处理需要解决的问题有( )。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"地基的硬度不够",{"key":24,"text":134,"correct":29},"地基的渗漏破坏",{"key":27,"text":136,"correct":29},"地基不均匀沉降引起建筑物开裂",{"key":31,"text":138,"correct":29},"地基在受震动力作用下的失稳",{"key":34,"text":140,"correct":22},"荷载条件下地基有变形","BCD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1147690,"重锤夯实地基的特点有( )。",[146,148,150,152,154],{"key":20,"text":147,"correct":29},"施工简便",{"key":24,"text":149,"correct":22},"费用较高",{"key":27,"text":151,"correct":29},"工期较长",{"key":31,"text":153,"correct":22},"孔隙水易消散",{"key":34,"text":155,"correct":29},"加固深度有限","ACE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},1147691,"关于地基处理的方法，说法正确的是( )。",[161,163,165,167,169],{"key":20,"text":162,"correct":29},"换土垫层时的施工前都要试验确定夯压遍数",{"key":24,"text":164,"correct":22},"强夯法适用于湿陷性黄土地基的处理",{"key":27,"text":166,"correct":29},"土桩和灰土桩都只能使用在地下水位以上的地基",{"key":31,"text":168,"correct":29},"深层搅拌法的原理是采用固化剂与软土拌合硬化成复合地基",{"key":34,"text":170,"correct":22},"砂石桩对淤泥质黏土的短期效果相当明显，后期更高","ACD",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":156,"analysis":37},1147692,"深层搅拌法适用于加固的土层有( )。",[176,178,180,182,184],{"key":20,"text":177,"correct":29},"淤泥",{"key":24,"text":179,"correct":22},"砂土",{"key":27,"text":181,"correct":29},"黏性土",{"key":31,"text":183,"correct":22},"杂填土",{"key":34,"text":185,"correct":29},"淤泥质土",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":156,"analysis":37},1147693,"桩基施工时，正确的打桩的顺序有( )。",[190,192,194,196,198],{"key":20,"text":191,"correct":29},"先深后浅",{"key":24,"text":193,"correct":22},"先浅后深",{"key":27,"text":195,"correct":29},"先大后小",{"key":31,"text":197,"correct":22},"先小后大",{"key":34,"text":199,"correct":29},"先长后短",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},1147694,"振动沉桩法的主要特点有( )。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"适用范围广",{"key":24,"text":207,"correct":29},"使用效能高",{"key":27,"text":209,"correct":29},"施工设备构造简单",{"key":31,"text":211,"correct":22},"附属机具多",{"key":34,"text":213,"correct":22},"需要消耗大量动力","BC",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":141,"analysis":37},1147695,"钢筋混凝土爆扩灌注桩的适用的土层有( )。",[219,221,223,225,227],{"key":20,"text":220,"correct":22},"软土",{"key":24,"text":222,"correct":29},"砂质土",{"key":27,"text":224,"correct":29},"黏土",{"key":31,"text":226,"correct":29},"砂质黏土",{"key":34,"text":228,"correct":22},"新填土",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":67,"analysis":37},1147696,"大型混凝土设备基础的主要施工特点有( )。",[233,235,237,239,241],{"key":20,"text":234,"correct":29},"造型复杂",{"key":24,"text":236,"correct":29},"埋设铁件种类多，数量大",{"key":27,"text":238,"correct":22},"尺度大",{"key":31,"text":240,"correct":29},"施工精度要求高",{"key":34,"text":242,"correct":22},"挖掘深度深",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":256,"analysis":37},1147697,"排除地面水常用的施工方法有设置( )。",[247,249,251,253,255],{"key":20,"text":248,"correct":29},"排水沟",{"key":24,"text":250,"correct":29},"截水沟",{"key":27,"text":252,"correct":29},"筑土堤",{"key":31,"text":254,"correct":22},"深水泵",{"key":34,"text":88,"correct":22},"ABC",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":67,"analysis":37},1147698,"钢筋混凝土预制桩振动沉桩施工的特点有( )。",[261,263,265,267,269],{"key":20,"text":262,"correct":29},"设备构造简单",{"key":24,"text":264,"correct":29},"效能高",{"key":27,"text":266,"correct":22},"所用机具设备较多",{"key":31,"text":268,"correct":29},"施工方便",{"key":34,"text":270,"correct":22},"适用范围较广",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":82,"analysis":37},1147699,"钢筋混凝土灌注桩的优点有( )。",[275,277,279,281,283],{"key":20,"text":276,"correct":29},"节约钢材",{"key":24,"text":278,"correct":29},"造价低",{"key":27,"text":280,"correct":29},"无噪声",{"key":31,"text":282,"correct":29},"无振动",{"key":34,"text":284,"correct":22},"施工后可马上承受荷载",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":299,"analysis":37},1147700,"干法作业成孔灌注桩的施工程序包括( )。",[289,291,293,295,297],{"key":20,"text":290,"correct":29},"钻孔",{"key":24,"text":292,"correct":22},"搅拌泥浆",{"key":27,"text":294,"correct":22},"下套管",{"key":31,"text":296,"correct":29},"下钢筋笼",{"key":34,"text":298,"correct":29},"灌注混凝土","ADE",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":314,"analysis":37},1147701,"造成沉管灌注桩出现断桩、颈缩、夹泥等现象的原因有( )。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"泥浆密度过小",{"key":24,"text":307,"correct":29},"桩周围饱和黏土回挤严重",{"key":27,"text":309,"correct":22},"重锤击打",{"key":31,"text":311,"correct":29},"泥块沾在套管未清洁",{"key":34,"text":313,"correct":29},"抽管太急","BDE",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":111,"analysis":37},1147702,"关于土层锚杆施工时对土层锚杆技术要求，说法正确的有( )。",[319,321,323,325,327],{"key":20,"text":320,"correct":29},"间排距应不小于2．0m×2．5m",{"key":24,"text":322,"correct":22},"上覆层厚度不大于2m",{"key":27,"text":324,"correct":22},"锚固段长度应在2m以上",{"key":31,"text":326,"correct":22},"预应力应和设计受拉荷载一致",{"key":34,"text":328,"correct":29},"倾斜锚杆的角度宜在15°～35°的范围",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":256,"analysis":37},1147703,"用土层锚杆应充分考虑锚杆或锚索在地下防腐问题，施工时不应采用( )。",[333,335,337,339,341],{"key":20,"text":334,"correct":29},"高铝水泥拌制砂浆",{"key":24,"text":336,"correct":29},"污水",{"key":27,"text":338,"correct":29},"pH值小于4．0的酸性水",{"key":31,"text":340,"correct":22},"用pH值大于9．0的碱性水",{"key":34,"text":342,"correct":22},"热处理钢筋",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":357,"analysis":37},1147704,"喷锚施工中喷混凝土的工艺方法有( )。",[347,349,351,353,355],{"key":20,"text":348,"correct":29},"干喷",{"key":24,"text":350,"correct":29},"湿喷",{"key":27,"text":352,"correct":29},"潮喷",{"key":31,"text":354,"correct":22},"旋喷",{"key":34,"text":356,"correct":29},"水泥裹砂","ABCE",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":357,"analysis":37},1147705,"地下连续墙适用的土层地质条件有( )。",[362,363,364,365,367],{"key":20,"text":181,"correct":29},{"key":24,"text":185,"correct":29},{"key":27,"text":222,"correct":29},{"key":31,"text":366,"correct":22},"溶岩地段",{"key":34,"text":368,"correct":29},"冲积土",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":383,"analysis":37},1147706,"地下连续墙的导墙的作用有( )。",[373,375,377,379,381],{"key":20,"text":374,"correct":29},"挡土",{"key":24,"text":376,"correct":29},"测量基准",{"key":27,"text":378,"correct":22},"槽段分隔",{"key":31,"text":380,"correct":22},"泥浆人口",{"key":34,"text":382,"correct":22},"截水","AB",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":398,"analysis":37},1147707,"关于施工地下连续墙时用的泥浆，说法正确的有( )。",[388,390,392,394,396],{"key":20,"text":389,"correct":22},"泥浆由普通的黏性土与水搅拌而成",{"key":24,"text":391,"correct":29},"泥浆可以冷却切土机械的刀具",{"key":27,"text":393,"correct":29},"搅拌完成后的泥浆宜贮存3h后使用",{"key":31,"text":395,"correct":22},"槽内泥浆应低于导墙顶0．3m",{"key":34,"text":397,"correct":29},"槽内泥浆应高于地下水位0．5m","BCE",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":413,"analysis":37},1147708,"关于基坑开挖施工，说法正确的有( )。",[403,405,407,409,411],{"key":20,"text":404,"correct":29},"场地开挖一般采取由上而下、分块分段分层进行",{"key":24,"text":406,"correct":22},"相邻基坑开挖时应先浅后深或同时进行",{"key":27,"text":408,"correct":29},"在基坑边缘上侧堆土或材料以及移动施工机械时，应与基坑边缘保持1m以上距离",{"key":31,"text":410,"correct":22},"填土应按不同土的透水性从小到大，自下而上分层回填",{"key":34,"text":412,"correct":22},"填土压实的分层厚度、压实遍数与填土含水情况无关","AC",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":428,"analysis":37},1147709,"确定基坑开挖的土方边坡坡度时应考虑的主要因素有( )。",[418,420,422,424,426],{"key":20,"text":419,"correct":29},"土质情况",{"key":24,"text":421,"correct":22},"所使用的开挖机械情况",{"key":27,"text":423,"correct":29},"施工地点气候情况",{"key":31,"text":425,"correct":29},"基坑的深度",{"key":34,"text":427,"correct":29},"边坡留置时间的长短","ACDE",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":357,"analysis":37},1147710,"以下炸药中属于铵油类炸药的是( )。",[433,435,437,439,441],{"key":20,"text":434,"correct":29},"普通铵油炸药",{"key":24,"text":436,"correct":29},"改性铵油炸药",{"key":27,"text":438,"correct":29},"膨化硝铵炸药",{"key":31,"text":440,"correct":22},"胶质硝化甘油炸药",{"key":34,"text":442,"correct":29},"重铵油炸药",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":357,"analysis":37},1147711,"煤矿许用炸药包括( )。",[447,449,451,453,455],{"key":20,"text":448,"correct":29},"被筒炸药",{"key":24,"text":450,"correct":29},"离子交换炸药",{"key":27,"text":452,"correct":29},"当量炸药",{"key":31,"text":454,"correct":22},"岩石硝铵炸药",{"key":34,"text":456,"correct":29},"许用含水炸药",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":428,"analysis":37},1147712,"起爆器材是指用于起爆炸药的起爆材料和传爆材料，目前爆破工程中常用的起爆器材包括( )。",[461,463,465,467,469],{"key":20,"text":462,"correct":29},"导爆管",{"key":24,"text":464,"correct":22},"导火索",{"key":27,"text":466,"correct":29},"导爆索",{"key":31,"text":468,"correct":29},"电雷管",{"key":34,"text":470,"correct":29},"导爆管雷管",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":52,"analysis":37},1147713,"电力起爆法在各种环境的电干扰下存在早爆和误爆危险，这些电干扰包括( )。",[475,477,479,481,483],{"key":20,"text":476,"correct":29},"杂散电",{"key":24,"text":478,"correct":29},"射频电",{"key":27,"text":480,"correct":22},"电雷管检测电",{"key":31,"text":482,"correct":29},"雷电",{"key":34,"text":484,"correct":29},"静电",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":126,"analysis":37},1147714,"目前爆破工程中常用的非电起爆方法包括( )。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"电子雷管起爆法",{"key":24,"text":492,"correct":22},"导火索起爆法",{"key":27,"text":494,"correct":29},"导爆索起爆法",{"key":31,"text":496,"correct":29},"导爆管起爆法",{"key":34,"text":498,"correct":22},"继爆管起爆法",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":513,"analysis":37},1147715,"按装药方式和装药空间形状分类，爆破方法分为( )。",[503,505,507,509,511],{"key":20,"text":504,"correct":29},"裸露药包法",{"key":24,"text":506,"correct":29},"药室法",{"key":27,"text":508,"correct":22},"连续装药法",{"key":31,"text":510,"correct":22},"间隔装药法",{"key":34,"text":512,"correct":29},"炮孔法","ABE",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":357,"analysis":37},1147716,"露天深孔台阶爆破常用的装药结构有( )几种。",[518,520,522,524,526],{"key":20,"text":519,"correct":29},"连续装药结构",{"key":24,"text":521,"correct":29},"间隔装药结构",{"key":27,"text":523,"correct":29},"混合装药结构",{"key":31,"text":525,"correct":22},"底部炮泥垫层装药结构",{"key":34,"text":527,"correct":29},"底部空气垫层装药结构",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":52,"analysis":37},1147717,"露天深孔台阶爆破常用的起爆顺序有（ ）几种。",[532,534,536,538,540],{"key":20,"text":533,"correct":29},"排间顺序起爆",{"key":24,"text":535,"correct":29},"波浪式起爆",{"key":27,"text":537,"correct":22},"复式起爆",{"key":31,"text":539,"correct":29},"斜线起爆",{"key":34,"text":541,"correct":29},"周边深孔预裂起爆",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":357,"analysis":37},1147718,"爆破工程施工组织设计应包括的内容为( )。",[546,548,550,552,554],{"key":20,"text":547,"correct":29},"施工组织机构及职责",{"key":24,"text":549,"correct":29},"施工准备工作及施工平面布置图",{"key":27,"text":551,"correct":29},"施工人、材、机的安排及安全、进度、质量保证措施",{"key":31,"text":553,"correct":22},"工程施工预算",{"key":34,"text":555,"correct":29},"爆破器材管理、使用安全保障、文明施工、环境保护、预防事故的措施及应急预案",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":82,"analysis":37},1147719,"井巷掘进爆破中的斜眼掏槽方式包括( )。",[560,562,564,566,568],{"key":20,"text":561,"correct":29},"单向掏槽",{"key":24,"text":563,"correct":29},"楔形掏槽",{"key":27,"text":565,"correct":29},"锥形掏槽",{"key":31,"text":567,"correct":29},"扇形掏槽",{"key":34,"text":569,"correct":22},"筒形掏槽",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":583,"analysis":37},1147720,"井巷掘进爆破中的直眼掏槽方式包括( )。",[574,575,577,579,581],{"key":20,"text":561,"correct":22},{"key":24,"text":576,"correct":29},"缝隙掏槽",{"key":27,"text":578,"correct":29},"简形掏槽",{"key":31,"text":580,"correct":29},"螺旋掏槽",{"key":34,"text":582,"correct":29},"双螺旋掏槽","BCDE",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":428,"analysis":37},1147721,"巷道光面爆破中对周边孔钻孔的要求是( )。",[588,590,592,594,596],{"key":20,"text":589,"correct":29},"周边孔要相互平行",{"key":24,"text":591,"correct":22},"周边孔深度与掏槽孔深度一致",{"key":27,"text":593,"correct":29},"周边孔均垂直于工作面",{"key":31,"text":595,"correct":29},"周边孔底部要落在同一平面上",{"key":34,"text":597,"correct":29},"周边孔开孔位置要准确，都位于巷道断面轮廓线上",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":52,"analysis":37},1147722,"立井井筒施工的掘进段高，由( )等因素确定。",[602,604,606,608,610],{"key":20,"text":603,"correct":29},"井筒穿过岩层的性质",{"key":24,"text":605,"correct":29},"涌水量大小",{"key":27,"text":607,"correct":22},"井壁结构的形式",{"key":31,"text":609,"correct":29},"井筒施工速度",{"key":34,"text":611,"correct":29},"临时支护形式",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":299,"analysis":37},1147723,"关于立井施工机械化配套的内容，说法正确的( )。",[616,618,620,622,624],{"key":20,"text":617,"correct":29},"提升能力与装岩能力配套",{"key":24,"text":619,"correct":22},"炮眼深度与一次爆破矸石量配套",{"key":27,"text":621,"correct":22},"地面排矸能力与矿车运输能力配套",{"key":31,"text":623,"correct":29},"支护能力与掘进能力配套",{"key":34,"text":625,"correct":29},"辅助设备与掘砌设备配套",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":256,"analysis":37},1147724,"在井壁结构中，钢筋混凝土井壁结构的特点是( )。",[630,632,634,636,638],{"key":20,"text":631,"correct":29},"强度高",{"key":24,"text":633,"correct":29},"适用年限长",{"key":27,"text":635,"correct":29},"便于机械化施工",{"key":31,"text":637,"correct":22},"工序简单",{"key":34,"text":639,"correct":22},"容易渗漏水",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":398,"analysis":37},1147725,"关于井筒内凿井吊桶的布设，合理的是( )。",[644,646,648,650,652],{"key":20,"text":645,"correct":22},"单吊桶提升则吊桶应位于井筒中心线",{"key":24,"text":647,"correct":29},"多套提升则应考虑使井架受力均衡",{"key":27,"text":649,"correct":29},"应考虑临时罐笼提升的方位要求",{"key":31,"text":651,"correct":22},"双钩提升的吊桶应落在工作面同一位置",{"key":34,"text":653,"correct":29},"吊桶通过喇叭口时应满足安全间隙",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":171,"analysis":37},1147726,"井筒必须设置有各种盘，它们是（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":29},"井口地面位置设有封口盘",{"key":24,"text":661,"correct":22},"激光指向机安设在测量盘",{"key":27,"text":663,"correct":29},"接长管路工作在固定盘上进行",{"key":31,"text":665,"correct":29},"钢丝绳悬吊的是吊盘",{"key":34,"text":667,"correct":22},"安装工作需要在安装盘上完成",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":67,"analysis":37},1147727,"巷道施工一次成巷的主要特点是( )。",[672,674,676,678,680],{"key":20,"text":673,"correct":29},"可一次完成，不留收尾工程",{"key":24,"text":675,"correct":29},"施工作业安全，质量好",{"key":27,"text":677,"correct":22},"施工干扰多，速度慢",{"key":31,"text":679,"correct":29},"掘进和支护能最大限度同时施工",{"key":34,"text":681,"correct":22},"工作面不需要临时支护",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":357,"analysis":37},1147728,"巷道工作面采用矿车运输排矸时，其调车的方式包括有( )。",[686,688,690,692,694],{"key":20,"text":687,"correct":29},"错车场调车",{"key":24,"text":689,"correct":29},"平移调车器调车",{"key":27,"text":691,"correct":29},"浮放道岔调车",{"key":31,"text":693,"correct":22},"起重式调车",{"key":34,"text":695,"correct":29},"转载设备调车",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":398,"analysis":37},1147729,"对于斜井表土明槽开挖的原则，说法正确的有( )。",[700,702,704,706,708],{"key":20,"text":701,"correct":22},"当边坡稳定性相对较差时，可以采用先墙后拱法施工",{"key":24,"text":703,"correct":29},"坡度开挖方式应根据地形和地质条件确定",{"key":27,"text":705,"correct":29},"遇到岩石的地方可以采用爆破，但要避免爆破对边坡稳定的影响",{"key":31,"text":707,"correct":22},"明槽地面不得开槽，积水由集水池用水泵排出",{"key":34,"text":709,"correct":29},"含水软弱地层可以采用抛石砂浆换底的方法",{"id":711,"libraryId":5,"type":15,"typeLabel":16,"stem":712,"options":713,"answer":428,"analysis":37},1147730,"斜井永久支护采用远距离输运地面混凝土时，尤其应注意的问题有( )。",[714,716,718,720,722],{"key":20,"text":715,"correct":29},"防止管道击穿",{"key":24,"text":717,"correct":22},"避免运输途中混凝土凝结",{"key":27,"text":719,"correct":29},"喷射工作风压调节",{"key":31,"text":721,"correct":29},"防止管路堵塞",{"key":34,"text":723,"correct":29},"搅拌站与工作面间的联系",{"id":725,"libraryId":5,"type":15,"typeLabel":16,"stem":726,"options":727,"answer":357,"analysis":37},1147731,"下列属于副井系统硐室的是( )。",[728,730,732,734,736],{"key":20,"text":729,"correct":29},"井筒与车场连接硐室",{"key":24,"text":731,"correct":29},"主变电所",{"key":27,"text":733,"correct":29},"水仓",{"key":31,"text":735,"correct":22},"装载硐室",{"key":34,"text":737,"correct":29},"附属井底水窝及泵房",[739,743,746,749,752,755],{"id":740,"name":741,"category":7,"favorite":742},1,"领导干部任职前廉政法规知识测试题",92,{"id":744,"name":745,"category":7,"favorite":740},595,"建筑结构与设备",{"id":747,"name":748,"category":7,"favorite":740},715,"招标采购专业知识与法律法规",{"id":750,"name":751,"category":7,"favorite":740},848,"市政方向-通用基础",{"id":753,"name":754,"category":7,"favorite":8},534,"BIM工程师",{"id":756,"name":754,"category":7,"favorite":8},535]