[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-801-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":740},{"id":5,"name":6,"category":7,"favorite":8},801,"一建矿业工程实务","建筑工程",0,26,50,1603,[13,38,53,67,81,96,110,125,140,155,169,183,198,213,228,243,258,272,286,300,314,328,342,356,371,385,399,414,428,442,456,470,484,498,512,527,541,555,570,584,599,613,627,641,655,669,683,698,712,726],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1147581,2,"多选题","矿业工程建造师从事的行业范畴包括有（）等建设方面。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","黄金矿山",true,{"key":24,"text":25,"correct":22},"B","冶金矿山",{"key":27,"text":28,"correct":22},"C","建材工业矿山",{"key":30,"text":31,"correct":22},"D","核工业（铀）矿山",{"key":33,"text":34,"correct":35},"E","煤层气",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1147582,"井筒施工中的井身工程，其分项工程包括（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":35},"井颈工程",{"key":24,"text":45,"correct":22},"掘进工程",{"key":27,"text":47,"correct":22},"模板工程",{"key":30,"text":49,"correct":35},"支护工程",{"key":33,"text":51,"correct":22},"钢筋工程","BCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":66,"analysis":37},1147583,"某井筒工程表土段采用钢筋混凝土结构，基岩段用锚喷作为临时支护，永久支护采用素混凝土结构，则该井筒中属于子分部工程的内容是（）。",[57,59,61,63,64],{"key":20,"text":58,"correct":22},"钢筋混凝土结构工程",{"key":24,"text":60,"correct":22},"素混凝土结构工程",{"key":27,"text":62,"correct":35},"锚喷支护结构工程",{"key":30,"text":47,"correct":35},{"key":33,"text":65,"correct":35},"现浇混凝土工程","AB",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":52,"analysis":37},1147584,"为避免矿山安全事故，正确的做法有（）。",[71,73,75,77,79],{"key":20,"text":72,"correct":35},"掌握准确无误的地质勘察资料",{"key":24,"text":74,"correct":22},"遵循施工规程和安全规程",{"key":27,"text":76,"correct":22},"保证作业人员佩戴、使用劳动保护用品",{"key":30,"text":78,"correct":35},"落实作业人员的保险政策",{"key":33,"text":80,"correct":22},"做好矿山易发事故的控制",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":95,"analysis":37},1147585,"关于三类工程平衡的做法，正确的是（）。",[85,87,89,91,93],{"key":20,"text":86,"correct":22},"矿、土、安工程平衡要以关键线路为基础",{"key":24,"text":88,"correct":35},"土建、安装工程都应排在矿建工程后面进行",{"key":27,"text":90,"correct":35},"施工准备期不要安排土建、安装的永久工程内容",{"key":30,"text":92,"correct":22},"一般民用建筑工程可以集中在竣工前兴建或完成",{"key":33,"text":94,"correct":22},"机电设备进场应考虑相应工程的排队，不宜过早","ADE",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":52,"analysis":37},1147586,"属于矿井项目工程施工组织设计的技术经济指标的是（）。",[100,102,104,106,108],{"key":20,"text":101,"correct":35},"施工准备工期长短",{"key":24,"text":103,"correct":22},"井筒及主要巷道月进度指标",{"key":27,"text":105,"correct":22},"建筑安装工人劳动生产率",{"key":30,"text":107,"correct":35},"大型机械台班用量及费用",{"key":33,"text":109,"correct":22},"临时工程预算占矿井建筑安装工程总投资的比重",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":124,"analysis":37},1147587,"施工总平面布置设计原则包括（）。",[114,116,118,120,122],{"key":20,"text":115,"correct":22},"不影响永久性建筑物的施工",{"key":24,"text":117,"correct":22},"有利于施工",{"key":27,"text":119,"correct":22},"方便运输",{"key":30,"text":121,"correct":35},"便于办公需要",{"key":33,"text":123,"correct":22},"安全与卫生要求","ABCE",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":139,"analysis":37},1147588,"建井总工期是以下（）的工期之和。",[129,131,133,135,137],{"key":20,"text":130,"correct":22},"施工准备期",{"key":24,"text":132,"correct":35},"矿井投产工期",{"key":27,"text":134,"correct":22},"矿井竣工工期",{"key":30,"text":136,"correct":35},"巷道施工期",{"key":33,"text":138,"correct":35},"井筒施工工期","AC",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":154,"analysis":37},1147589,"通常，要加快一条巷道的施工进度，可考虑采用的手段有（）。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"平行作业或平行施工方法",{"key":24,"text":147,"correct":22},"实现多个工作面的多头作业",{"key":27,"text":149,"correct":35},"一天24h连续作业",{"key":30,"text":151,"correct":35},"取消放炮后的通风工序",{"key":33,"text":153,"correct":22},"采用多台钻机同时作业","ABE",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":36,"analysis":37},1147590,"矿山工程进度拖延时，正确的事后措施包括有（）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"分析原因和影响工期程度",{"key":24,"text":162,"correct":22},"经过业主同意，删减工程量或工程范围",{"key":27,"text":164,"correct":22},"采用外包方法请专业公司帮助解决",{"key":30,"text":166,"correct":22},"分析网络计划，根据影响工期与否选择是否调整资源投入",{"key":33,"text":168,"correct":35},"集中到验收前一并处理",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":139,"analysis":37},1147591,"在工序能力分析方法中，通常以。为标准衡量工序能力，下列说法正确的是（）。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"σ值越大，工序特性值的波动越大，说明工序能力越小；",{"key":24,"text":176,"correct":35},"σ值越大，工序特性值的波动越大，说明工序能力越大；",{"key":27,"text":178,"correct":22},"σ值越小，工序特|生值的波动越小，说明工序能力越大；",{"key":30,"text":180,"correct":35},"σ值越小，工序特性值的波动越小，说明工序能力越小；",{"key":33,"text":182,"correct":35},"σ值较大时，工序特性值的波动可以忽略",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":37},1147592,"抽样本身就是质量检验的一种方法，根据抽样形式决定的检验方法，可以分为（）。",[187,189,191,193,195],{"key":20,"text":188,"correct":22},"全检",{"key":24,"text":190,"correct":22},"抽查",{"key":27,"text":192,"correct":22},"免检",{"key":30,"text":194,"correct":35},"专检",{"key":33,"text":196,"correct":35},"破坏性检验","ABC",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":212,"analysis":37},1147594,"关于尾矿坝坝基开挖及岸坡处理施工的要求，正确的是（）。",[202,204,206,208,210],{"key":20,"text":203,"correct":35},"开挖清理坝肩岸坡工作可边填筑边开挖",{"key":24,"text":205,"correct":22},"天然黏性土坝基可预留保护层",{"key":27,"text":207,"correct":22},"坝基易风化的岩石，应留保护层",{"key":30,"text":209,"correct":22},"灌浆法处理坝基应在施工现场进行灌浆试验",{"key":33,"text":211,"correct":22},"开挖清理坝肩岸坡工作宜自上而下一次完成","BCDE",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},1147595,"露天矿疏干井工程填砾施工，说法正确的是（）。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"含泥土杂质较多的砾料，应用水冲洗干净后使用",{"key":24,"text":220,"correct":35},"现场储备的砾料不应大于设计值的1．2倍",{"key":27,"text":222,"correct":35},"填砾应采用静水填砾法",{"key":30,"text":224,"correct":22},"填砾应从孔口井管四周均匀填入，不得从单一方位填入",{"key":33,"text":226,"correct":35},"砾料填至预定位置后，无需测定填砾面位置","AD",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":242,"analysis":37},1147596,"符合立井井筒基岩爆破作业规定的有（）。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"短段掘砌混合作业的眼深应为3．5～5．0m",{"key":24,"text":235,"correct":35},"宜采用低威力、防水性能好的水胶炸药",{"key":27,"text":237,"correct":22},"浅眼多循环作业的眼深应为1．2～2．0m",{"key":30,"text":239,"correct":35},"周边眼药卷直径不小于45mm",{"key":33,"text":241,"correct":22},"光面爆破周边眼的眼距应控制在0．4～0．6m","ACE",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":257,"analysis":37},1147597,"根据《煤矿井巷工程施工规范》GB50511--2010规定，说法正确的有（）。",[247,249,251,253,255],{"key":20,"text":248,"correct":35},"松软破碎的大断面巷道采用全断面爆破，利于陕速施工",{"key":24,"text":250,"correct":22},"巷道采用锚喷作永久支护时，永久支护与掘进工作面问的距离不宜大于40m",{"key":27,"text":252,"correct":22},"巷道采用砌碹支护时，临时支护应紧跟工作面",{"key":30,"text":254,"correct":22},"永久水沟距掘进工作面不宜大于40m",{"key":33,"text":256,"correct":35},"在有条件的情况下，岩石巷道宜采用掘进机掘进","BCD",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":124,"analysis":37},1147598,"混凝土实体检验的主要检验项目是（）。",[262,264,266,268,270],{"key":20,"text":263,"correct":22},"混凝土强度",{"key":24,"text":265,"correct":22},"钢筋保护层厚度",{"key":27,"text":267,"correct":22},"合同约定的项目",{"key":30,"text":269,"correct":35},"纵向钢筋布置位置",{"key":33,"text":271,"correct":22},"其他认为必要检查的项目",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":36,"analysis":37},1147599,"下列关于矿山井巷工程中单位（子单位）工程质量合格条件的说法正确的是（）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"单位工程的各分部工程合格",{"key":24,"text":279,"correct":22},"质量控制资料文件应完整",{"key":27,"text":281,"correct":22},"各分部工程有关安全和功能的检测资料应复查完整",{"key":30,"text":283,"correct":22},"主要功能项目的抽查结果应符合相关专业质量验收规范的规定",{"key":33,"text":285,"correct":35},"观感质量得分率应达到65％及以上",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":257,"analysis":37},1147600,"关于尾矿坝筑坝材料密度检测，说法正确的有（）。",[290,292,294,296,298],{"key":20,"text":291,"correct":35},"黏性土现场密度检测宜采用表面波压实密度仪法",{"key":24,"text":293,"correct":22},"砾质土现场密度检测宜采用灌砂（灌水）法",{"key":27,"text":295,"correct":22},"土质不均匀的黏性土和砾质土的压实度检测宜采用三点击实法",{"key":30,"text":297,"correct":22},"堆石料现场密度检测宜采用挖坑灌水法",{"key":33,"text":299,"correct":35},"反滤料、过渡料及砂（砾）石料现场密度检测宜采用环刀法",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":124,"analysis":37},1147601,"事故应急救援的基本任务包括（）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"立即组织营救遇险人员",{"key":24,"text":307,"correct":22},"迅速控制危险源，尽可能缩小灾害影响",{"key":27,"text":309,"correct":22},"做好现场清理，消除危害后果",{"key":30,"text":311,"correct":35},"成立事故调查组",{"key":33,"text":313,"correct":22},"查清事故原因，评估危害程度",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":154,"analysis":37},1147602,"根据矿山安全标准化要求，企业建立的安全生产方针和目标应做到（）。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"遵循“安全第一，预防为主，综合治理”的方针",{"key":24,"text":321,"correct":22},"遵循“以人为本、风险控制、持续改进”的原则",{"key":27,"text":323,"correct":35},"目标应具体，有的内容虽不能测量，但应确保能实现",{"key":30,"text":325,"correct":35},"体现安全生产现状，并保持目标的长期稳定性",{"key":33,"text":327,"correct":22},"为实现安全方针和目标建立有效的支持保障机制",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":124,"analysis":37},1147603,"金属非金属矿山建立的安全生产应急体系，应重点关注（）等重大风险内容。",[332,334,336,338,340],{"key":20,"text":333,"correct":22},"透水",{"key":24,"text":335,"correct":22},"地压灾害",{"key":27,"text":337,"correct":22},"尾矿库溃坝",{"key":30,"text":339,"correct":35},"瓦斯突出灾害",{"key":33,"text":341,"correct":22},"中毒和窒息",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":124,"analysis":37},1147604,"下列安全检查中的工作、处置方法，正确的是（）。",[346,348,350,352,354],{"key":20,"text":347,"correct":22},"当场责令现场人员改正违章行为",{"key":24,"text":349,"correct":22},"抽查考核现场人员安全技术知识",{"key":27,"text":351,"correct":22},"登记安全问题以便以后追究",{"key":30,"text":353,"correct":35},"给现场签发不留底的安全隐患罚单",{"key":33,"text":355,"correct":22},"追查遗留安全问题的改正情况",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":370,"analysis":37},1147605,"采用井壁注浆堵水时需遵守的规定，说法错误的有（）。",[360,362,364,366,368],{"key":20,"text":361,"correct":35},"最大注浆压力必须小于井壁承载强度",{"key":24,"text":363,"correct":22},"井筒在流沙层部位时，注浆口深度必须小于井壁厚度100mm",{"key":27,"text":365,"correct":22},"井筒采用双层井壁支护时，注浆孔不得进入外壁",{"key":30,"text":367,"correct":35},"注浆管必须固结在井壁中，并装有阀门。",{"key":33,"text":369,"correct":35},"钻孔可能发生涌砂时，应采取套管法或其他安全措施。","BC",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":124,"analysis":37},1147606,"关于地面建筑工程施工的安全要求，正确的是（）。",[375,377,379,381,383],{"key":20,"text":376,"correct":22},"楼梯每个踏步上方的净空高度应不小于2．2m",{"key":24,"text":378,"correct":22},"长度超过60m的厂房，应设两个主要楼梯",{"key":27,"text":380,"correct":22},"厂房内的一般设备维修护道宽度不应小于1．0m",{"key":30,"text":382,"correct":35},"通道的坡度不到12°时应设踏步；超过12°时应加设防滑条",{"key":33,"text":384,"correct":22},"高度超过0．6m的平台其周围应设栏杆",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":124,"analysis":37},1147607,"起重与吊装工作的安全管理规定说法正确的是（）。",[389,391,393,395,397],{"key":20,"text":390,"correct":22},"非本工程施工人员严禁进入吊装施工现场",{"key":24,"text":392,"correct":22},"施工指挥和操作人员均需佩戴标记",{"key":27,"text":394,"correct":22},"作业区域设有警戒标志，必要时派人监护",{"key":30,"text":396,"correct":35},"吊装过程中发生意外，各操作岗位应迅速撤离现场",{"key":33,"text":398,"correct":22},"施工人员必须戴好安全帽",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":413,"analysis":37},1147608,"下列关于在竖井、斜井运输爆炸物品安全要求的说法正确的是（）。",[403,405,407,409,411],{"key":20,"text":404,"correct":22},"应事先通知绞车司机和信号工、把钩工",{"key":24,"text":406,"correct":35},"罐笼中同时运送炸药、雷管时，除爆破工外不得有其他人员",{"key":27,"text":408,"correct":22},"用罐笼运输硝铵类炸药，装载高度不应超过罐笼高度的2／3",{"key":30,"text":410,"correct":22},"用罐笼运输雷管时，升降速度不应超过2m／s",{"key":33,"text":412,"correct":22},"用吊桶运输爆炸物品时，升降速度不应超过1m／s","ACDE",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":124,"analysis":37},1147609,"矿山工程中防尘措施做法正确的是（）。",[418,420,422,424,426],{"key":20,"text":419,"correct":22},"采区湿式凿岩、水炮泥",{"key":24,"text":421,"correct":22},"采用水幕净化风流",{"key":27,"text":423,"correct":22},"冲洗岩帮、洒水降尘",{"key":30,"text":425,"correct":35},"冻结法凿井采用湿式凿岩",{"key":33,"text":427,"correct":22},"加强个人防护",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":36,"analysis":37},1147610,"电气安全标志分颜色标志和图形标志，下列关于安全标志的说法正确的是（）。",[432,434,436,438,440],{"key":20,"text":433,"correct":22},"禁止标志用于制止某种危险行动",{"key":24,"text":435,"correct":22},"警告标志用于提醒和注意避免发生危险",{"key":27,"text":437,"correct":22},"指令标志用于指示人们必须遵守的规则",{"key":30,"text":439,"correct":22},"提示标志表示安全目标方向及安全措施",{"key":33,"text":441,"correct":35},"劝阻标志用于指示人们更好的选择行为",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":52,"analysis":37},1147611,"矿山井下发现火情的正确做法是（）。",[446,448,450,452,454],{"key":20,"text":447,"correct":35},"发现火隋后应立即报告并设法远离火区",{"key":24,"text":449,"correct":22},"调度室应迅速启动应急预案",{"key":27,"text":451,"correct":22},"应迅速组织撤离可能危及的人员",{"key":30,"text":453,"correct":35},"电气设备着火应首先使其隔绝空气",{"key":33,"text":455,"correct":22},"灭火措施应根据火灾性质、通风和瓦斯情况",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":36,"analysis":37},1147612,"瓦斯突出、窒息事故后的紧急处理做法，正确的是（）。",[460,462,464,466,468],{"key":20,"text":461,"correct":22},"首先是设法撤离灾区人员",{"key":24,"text":463,"correct":22},"首先抢救遇险人员",{"key":27,"text":465,"correct":22},"切断电源",{"key":30,"text":467,"correct":22},"避免后续操作引起的二次火花",{"key":33,"text":469,"correct":35},"切断电源同时做到停止通风",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":124,"analysis":37},1147613,"为防止支护结构发生坍塌进行基坑支护监测，下面属于基坑监测内容的是（）等。",[474,476,478,480,482],{"key":20,"text":475,"correct":22},"水平位移和垂直位移",{"key":24,"text":477,"correct":22},"地表裂缝",{"key":27,"text":479,"correct":22},"基坑顶部建（构）筑物变形",{"key":30,"text":481,"correct":35},"地下水位",{"key":33,"text":483,"correct":22},"支护结构内力及变形",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":257,"analysis":37},1147614,"环境影响评价的形式有（）。",[488,490,492,494,496],{"key":20,"text":489,"correct":35},"免评价",{"key":24,"text":491,"correct":22},"填报文件影响登记表",{"key":27,"text":493,"correct":22},"编制环境影响报告表",{"key":30,"text":495,"correct":22},"编制环境影响报告书",{"key":33,"text":497,"correct":35},"环境影响专项报告书",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":36,"analysis":37},1147615,"矿山项目决策阶段影响工程投资的因素有（）。",[502,504,506,508,510],{"key":20,"text":503,"correct":22},"市场因素",{"key":24,"text":505,"correct":22},"资源条件因素",{"key":27,"text":507,"correct":22},"技术因素",{"key":30,"text":509,"correct":22},"环境因素",{"key":33,"text":511,"correct":35},"总平面设计",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":526,"analysis":37},1147616,"关于矿井项目招标应满足的条件，正确的说法包括（）等。",[516,518,520,522,524],{"key":20,"text":517,"correct":22},"项目所在矿区已获准开发",{"key":24,"text":519,"correct":22},"资源勘察已经审查同意",{"key":27,"text":521,"correct":35},"补充地质勘探已经列入计划",{"key":30,"text":523,"correct":22},"安全设施设计已经安全监察部门审查同意",{"key":33,"text":525,"correct":22},"建设用地已购置且完成临时用地规划和部分租赁工作","ABDE",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":413,"analysis":37},1147617,"下列关于招投标中的开标、决标工作，做法正确的是（）。",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"开标应公开，开标后是评标工作",{"key":24,"text":534,"correct":35},"投标人可推荐委托人参加开标会议",{"key":27,"text":536,"correct":22},"中标前不允许彼此商量投标价格",{"key":30,"text":538,"correct":22},"招标人应根据评标情况确定中标人",{"key":33,"text":540,"correct":22},"根据招标人委托可由评标委员会确定中标人",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":52,"analysis":37},1147618,"下列招标文件中的内容，不合理的是（）。",[545,547,549,551,553],{"key":20,"text":546,"correct":35},"一个矿山的两个井筒分别招标",{"key":24,"text":548,"correct":22},"一个井筒分为井颈和井身两部分进行分别招标",{"key":27,"text":550,"correct":22},"对井筒漏水量较规程要求的水平更低",{"key":30,"text":552,"correct":35},"井筒规格的要求高于规程标准",{"key":33,"text":554,"correct":22},"井筒水文地质勘探工作在定标后进行",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":569,"analysis":37},1147619,"关于投标报价的说法，合理的是（）。",[559,561,563,565,567],{"key":20,"text":560,"correct":22},"报价要考虑一定的风险费用",{"key":24,"text":562,"correct":35},"最低报价是能中标的最有效办法",{"key":27,"text":564,"correct":22},"报价应考虑企业的利益",{"key":30,"text":566,"correct":22},"报价不当将可能引入风险",{"key":33,"text":568,"correct":35},"投标策略就是要报低价","ACD",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":526,"analysis":37},1147620,"承包商在合同谈判时明确安全施工相关内容的意义在于（）。",[574,576,578,580,582],{"key":20,"text":575,"correct":22},"矿业工程项目属于高危行业",{"key":24,"text":577,"correct":22},"矿业工程的安全事故往往较严重",{"key":27,"text":579,"correct":35},"施工发生安全事故与发包方无关",{"key":30,"text":581,"correct":22},"项目应随时接受相关部门安全检查",{"key":33,"text":583,"correct":22},"安全施工是矿业工程项目考核的重要指标",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":598,"analysis":37},1147621,"对合同内容的认识，说法正确的是（）。",[588,590,592,594,596],{"key":20,"text":589,"correct":35},"合同中的纠纷处理方法可定为协商",{"key":24,"text":591,"correct":22},"安全要求也是矿业工程承包的基本内容",{"key":27,"text":593,"correct":35},"项目变更的同时合同也应进行变更",{"key":30,"text":595,"correct":22},"考虑合同的价格形式应结合项目性质",{"key":33,"text":597,"correct":22},"无论主观故意和无意违约都应承担相应责任","BDE",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":36,"analysis":37},1147622,"合同分析的基本内容的包括（）。",[603,605,607,609,611],{"key":20,"text":604,"correct":22},"合同的法律基础",{"key":24,"text":606,"correct":22},"承包商的主要任务和发包单位的责任",{"key":27,"text":608,"correct":22},"合同价格和施工工期",{"key":30,"text":610,"correct":22},"违约责任",{"key":33,"text":612,"correct":35},"合同的格式",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":36,"analysis":37},1147623,"矿业工程合同文件包括有（）等。",[617,619,621,623,625],{"key":20,"text":618,"correct":22},"合同协议书",{"key":24,"text":620,"correct":22},"中标通知书",{"key":27,"text":622,"correct":22},"技术标准和要求",{"key":30,"text":624,"correct":22},"专用条款",{"key":33,"text":626,"correct":35},"发包方相关要求的备忘录",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":227,"analysis":37},1147624,"关于工程合同签订时的会谈内容和做法，正确的是（）。",[631,633,635,637,639],{"key":20,"text":632,"correct":22},"合同承包范围的更改应有会谈纪要，并以合同附件形式留在合同中",{"key":24,"text":634,"correct":35},"单价合同的“增减量幅度”是指单价的增减与工程量增减的比例值大小",{"key":27,"text":636,"correct":35},"合同价款会谈的内容是固定价款和可调价款的协商",{"key":30,"text":638,"correct":22},"对于可调价格的确认应考虑本单位能力、工程条件、项目风险",{"key":33,"text":640,"correct":35},"付款方式的确定内容就是指付款内容、付款数额（或比例）",{"id":642,"libraryId":5,"type":15,"typeLabel":16,"stem":643,"options":644,"answer":36,"analysis":37},1147625,"工程索赔文件内容包括（）。",[645,647,649,651,653],{"key":20,"text":646,"correct":22},"综述部分",{"key":24,"text":648,"correct":22},"论证部分",{"key":27,"text":650,"correct":22},"索赔款项（或工期）计算部分",{"key":30,"text":652,"correct":22},"证据部分",{"key":33,"text":654,"correct":35},"索赔成立的条件",{"id":656,"libraryId":5,"type":15,"typeLabel":16,"stem":657,"options":658,"answer":66,"analysis":37},1147626,"下列关于确定工程变更价款的说法，正确的是（）。",[659,661,663,665,667],{"key":20,"text":660,"correct":22},"承包人应在工程变更确定后14d内，提出变更工程价款的报告",{"key":24,"text":662,"correct":22},"监理工程师应在收到变更工程价款报告之日起14d内予以确认",{"key":27,"text":664,"correct":35},"工程变更价款最终应由业主确认",{"key":30,"text":666,"correct":35},"监理工程师不同意承包人提出的变更价款的，则承包人应予以接受",{"key":33,"text":668,"correct":35},"工程变更价款最终应由承包人确认",{"id":670,"libraryId":5,"type":15,"typeLabel":16,"stem":671,"options":672,"answer":36,"analysis":37},1147627,"“一通三防”是指（）。",[673,675,677,679,681],{"key":20,"text":674,"correct":22},"通风",{"key":24,"text":676,"correct":22},"防瓦斯",{"key":27,"text":678,"correct":22},"综合防尘",{"key":30,"text":680,"correct":22},"防灭火",{"key":33,"text":682,"correct":35},"防汛",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":697,"analysis":37},1147628,"爆破作业现场“三图一表”的图指的是（）。",[687,689,691,693,695],{"key":20,"text":688,"correct":22},"施工断面图",{"key":24,"text":690,"correct":22},"炮眼布置三视图",{"key":27,"text":692,"correct":35},"通风线路图",{"key":30,"text":694,"correct":22},"避灾线路图",{"key":33,"text":696,"correct":35},"工作面设备布置图","ABD",{"id":699,"libraryId":5,"type":15,"typeLabel":16,"stem":700,"options":701,"answer":197,"analysis":37},1147629,"矿业工程技术档案的内容包括（）。",[702,704,706,708,710],{"key":20,"text":703,"correct":22},"施工组织管理技术档案",{"key":24,"text":705,"correct":22},"工程技术档案",{"key":27,"text":707,"correct":22},"工程进度交换图纸",{"key":30,"text":709,"correct":35},"招投标资料",{"key":33,"text":711,"correct":35},"合同管理资料",{"id":713,"libraryId":5,"type":15,"typeLabel":16,"stem":714,"options":715,"answer":197,"analysis":37},1147630,"关于矿业工程技术档案的管理工作，以下观点正确的是（）。",[716,718,720,722,724],{"key":20,"text":717,"correct":22},"应随工程进度及时收集、整理",{"key":24,"text":719,"correct":22},"应由有关责任方签字盖章",{"key":27,"text":721,"correct":22},"应实行技术负责人负责制",{"key":30,"text":723,"correct":35},"应在工程竣工验收时汇总并移交建设单位",{"key":33,"text":725,"correct":35},"不能长期保存的竣工资料应为复印件",{"id":727,"libraryId":5,"type":15,"typeLabel":16,"stem":728,"options":729,"answer":197,"analysis":37},1147631,"矿业工程竣工资料汇总、组卷的方法是（）。",[730,732,734,736,738],{"key":20,"text":731,"correct":22},"工程质量控制资料按单位工程、分部工程、专业、阶段等汇总、组卷",{"key":24,"text":733,"correct":22},"工程观感质量检查资料按单位工程、专业等汇总、组卷",{"key":27,"text":735,"correct":22},"竣工图按单位工程、专业等汇总、组卷",{"key":30,"text":737,"correct":35},"验收合格后，竣工资料移交时间由发包方确定",{"key":33,"text":739,"correct":35},"每张移交图纸上均应有双方签字、盖章",[741,745,748,751,754,757],{"id":742,"name":743,"category":7,"favorite":744},1,"领导干部任职前廉政法规知识测试题",92,{"id":746,"name":747,"category":7,"favorite":742},595,"建筑结构与设备",{"id":749,"name":750,"category":7,"favorite":742},715,"招标采购专业知识与法律法规",{"id":752,"name":753,"category":7,"favorite":742},848,"市政方向-通用基础",{"id":755,"name":756,"category":7,"favorite":8},534,"BIM工程师",{"id":758,"name":756,"category":7,"favorite":8},535]