[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-801-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},801,"一建矿业工程实务","建筑工程",0,19,50,1603,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,558,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1147031,1,"单选题","工程项目成本控制的一项重要手段是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","银行控制",false,{"key":24,"text":25,"correct":26},"B","定额管理",true,{"key":28,"text":29,"correct":22},"C","奖罚政策",{"key":31,"text":32,"correct":22},"D","限制流动资金","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1147032,"当工序成本没有超支时，引起实际开支与计划不符的原因是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"因施工发生困难",{"key":24,"text":41,"correct":22},"施工质量出现偏差",{"key":28,"text":43,"correct":26},"施工进度与计划不符",{"key":31,"text":45,"correct":22},"设备购置不当",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1147033,"成本控制的原则是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"少花钱",{"key":24,"text":53,"correct":22},"多挣钱",{"key":28,"text":55,"correct":22},"权与利相结合",{"key":31,"text":57,"correct":26},"职能控制",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1147034,"编制和应用施工定额之所以有利于推广先进技术是因为（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"施工定额是强制实施的",{"key":24,"text":65,"correct":22},"施工定额是工程定额体系的基础",{"key":28,"text":67,"correct":26},"施工定额水平本身包含成熟先进的施工技术",{"key":31,"text":69,"correct":22},"施工定额是用先进的技术方法测定出来的",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1147035,"下列矿山定额选项中不属于按建设工程内容分类的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"矿山地面建筑工程定额",{"key":24,"text":77,"correct":26},"预算定额",{"key":28,"text":79,"correct":22},"矿山机电设备安装工程定额",{"key":31,"text":81,"correct":22},"井巷工程定额",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1147036,"不属于按物质消耗分类范畴的定额是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"基础定额",{"key":24,"text":89,"correct":22},"人工消耗定额",{"key":28,"text":91,"correct":22},"材料消耗定额",{"key":31,"text":93,"correct":22},"机械消耗定额",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1147037,"招标人应根据相关工程的工期定额合理计算工程，压缩的工期天数不得超过定额工期的（ ），超过者，应在招标文件中明示增加赶工费用。",[98,100,102,104],{"key":20,"text":99,"correct":22},"10％",{"key":24,"text":101,"correct":22},"15％",{"key":28,"text":103,"correct":26},"20％",{"key":31,"text":105,"correct":22},"25％",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1147038,"矿业工程项目的风险}生主要体现在（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"工期长",{"key":24,"text":113,"correct":22},"条件难",{"key":28,"text":115,"correct":22},"项目效益低",{"key":31,"text":117,"correct":26},"多项条件的不确定",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1147039,"不属于矿产开发可行性研究的内容是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"项目经济分析和评价",{"key":24,"text":125,"correct":22},"矿产资源可靠性研究",{"key":28,"text":127,"correct":26},"项目施工图设计",{"key":31,"text":129,"correct":22},"项目环境影响评价",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1147040,"承发包双方在施工合同中约定的和合同价款无关的事项有（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"投标保证金的数额、支付方式及时间",{"key":24,"text":137,"correct":22},"工程价款的调整因素、方法、程序、支付方式及时间",{"key":28,"text":139,"correct":22},"承担计价风险的内容、范围以及超出约定内容、范围的调整方法。",{"key":31,"text":141,"correct":22},"工程竣工价款结算编制与核对、支付方式及时间",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1147041,"对于矿业工程项目而言，制约项目规模大小的首要因素是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"市场因素",{"key":24,"text":149,"correct":22},"环境因素",{"key":28,"text":151,"correct":22},"技术因素",{"key":31,"text":153,"correct":26},"矿产资源因素",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1147042,"在建设项目投资的设备购置费中，还包括（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"设备运杂费",{"key":24,"text":161,"correct":22},"购置的税金",{"key":28,"text":163,"correct":22},"涨价的预备费",{"key":31,"text":165,"correct":22},"工程建设其他费用",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1147043,"某单位建筑工程初步设计深度不够，不能准确地计算工程量，但工程采用的技术比较成熟而又有类似指标可以利用时，编制该工程设计概算宜采用的方法是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"扩大单价法",{"key":24,"text":173,"correct":22},"类似工程换算法",{"key":28,"text":175,"correct":22},"生产能力指数法",{"key":31,"text":177,"correct":26},"概算指标法",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1147044,"不属于措施项目费的有（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"特殊地区施工增加费",{"key":24,"text":185,"correct":26},"仪器仪表使用费",{"key":28,"text":187,"correct":22},"脚手架工程费",{"key":31,"text":189,"correct":22},"安全文明施工费",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1147045,"不属于项目总平面设计内容的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"建设标准和产品方案",{"key":24,"text":197,"correct":22},"厂址方案和占地面积",{"key":28,"text":199,"correct":22},"总图运输和主要建筑物构筑物",{"key":31,"text":201,"correct":22},"公用设施的配置",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1147046,"下列工作中，不属于施工项目成本目标动态控制程序中的工作是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"目标分解",{"key":24,"text":209,"correct":26},"目标计划值搜集",{"key":28,"text":211,"correct":22},"目标计划值与实际值比较",{"key":31,"text":213,"correct":22},"采取措施纠偏",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},1147047,"根据《建设工程工程量清单计价规范》GB50500--2013，如果因发包人原因删减了合同中原定的某项工作，致使承包人发生的费用或(和)得到的收益不能被包括在其他已支付的项目中，也未被包含在任何可替代的工作中，则承包人（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"只能提出费用补偿，不能提出利润补偿",{"key":24,"text":221,"correct":22},"只能提出利润补偿，不能提出费用补偿",{"key":28,"text":223,"correct":26},"有权提出费用及利润补偿",{"key":31,"text":225,"correct":22},"无权要求任何费用和利润补偿",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1147048,"根据《建设工程工程量清单计价规范》GB50500---2013，工程变更引起施工方案改变并使措施项目发生变化时，承包人提出调整措施项目费用的，应事先将（ ）提交发包人确认。",[230,232,234,236],{"key":20,"text":231,"correct":26},"拟实施的施工方案",{"key":24,"text":233,"correct":22},"索赔意向通知",{"key":28,"text":235,"correct":22},"拟申请增加的费用明细",{"key":31,"text":237,"correct":22},"工程变更的内容",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1147049,"符合列入工程量清单中暂估价的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":26},"必然发生、暂时不能确定价格的材料金额",{"key":24,"text":245,"correct":22},"可能发生的材料金额",{"key":28,"text":247,"correct":22},"一种用于参考或比较用的材料金额",{"key":31,"text":249,"correct":22},"双方未能商定的材料金额",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1147050,"根据《建设工程工程量清单计价规范》GB50500---2013，建设工程投标报价中，不得作为竞争性费用的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"总承包服务费",{"key":24,"text":257,"correct":22},"夜间施工增加费",{"key":28,"text":259,"correct":22},"分部分项工程费",{"key":31,"text":261,"correct":26},"规费",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},1147051,"某工程施工期间，因承包人原因导致工期延误，且在延误期内国家相关政策发生变化，由此引起的合同价款调整，应该（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"调增的和调减的均予以调整",{"key":24,"text":269,"correct":22},"调增的和调减的均不予调整",{"key":28,"text":271,"correct":26},"调增的不予调整，调减的予以调整",{"key":31,"text":273,"correct":22},"调增的予以调整，调减的不予调整",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1147052,"根据《建设工程工程量清单计价规范》GB50500---2013，投标企业可以根据拟建工程的具体施工方案进行列项的清单是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"分部分项工程量清单",{"key":24,"text":281,"correct":26},"措施项目清单",{"key":28,"text":283,"correct":22},"其他项目清单",{"key":31,"text":285,"correct":22},"规费项目清单",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1147053,"不属于工程索赔依据的索赔文件是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"合同文件",{"key":24,"text":293,"correct":26},"索赔款项(或工期)计算部分",{"key":28,"text":295,"correct":22},"法律法规",{"key":31,"text":297,"correct":22},"相关证据",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1147054,"合同工程实施期间，如果出现设计图纸(含设计变更)与招标工程量清单任一项目的特征描述不符，且由此导致工程造价增减变化的，应按（ ）的规定重新确定相应工程量清单项目的综合单价，调整合同价款。",[302,304,306,308],{"key":20,"text":303,"correct":26},"实际施工的项目特征",{"key":24,"text":305,"correct":22},"设计图纸的项目特征",{"key":28,"text":307,"correct":22},"招标工程量清单",{"key":31,"text":309,"correct":22},"暂估价",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1147055,"根据《建设工程工程量清单计价规范》GB50500--2013，编制分部分项清单时，编制人员须确定项目名称、计量单位、工程数量和（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"填表须知",{"key":24,"text":317,"correct":26},"项目特征",{"key":28,"text":319,"correct":22},"项目总说明",{"key":31,"text":321,"correct":22},"项目工程内容",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},1147056,"关于工程量清单中其他项目清单包含的总承包服务费，表示（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"分包单位应给总承包单位服务费",{"key":24,"text":329,"correct":26},"发包人自行采购并委托总包保管的服务费",{"key":28,"text":331,"correct":22},"总承包商和分包单位提供的服务费",{"key":31,"text":333,"correct":22},"有专业工程分包就应设总承包服务费",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},1147057,"根据《建设工程工程量清单计价规范》GB50500—2013，编制工程量清单时，计日工表中的人工应按（ ）列项。",[338,340,342,344],{"key":20,"text":339,"correct":26},"工种",{"key":24,"text":341,"correct":22},"职称",{"key":28,"text":343,"correct":22},"职务",{"key":31,"text":345,"correct":22},"技术等级",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":28,"analysis":33},1147058,"采用冻结法凿井的矿业工程项目，如果单独进行冻结工程项目的招标，则这种招标形式属于（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"项目招标承包",{"key":24,"text":353,"correct":22},"项目建设招标总承包",{"key":28,"text":355,"correct":26},"专项招标承包",{"key":31,"text":357,"correct":22},"阶段招标承包",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},1147059,"招标工作中的资格预审应在（ ）之前进行。",[362,364,366,368],{"key":20,"text":363,"correct":22},"组织招标机构之前",{"key":24,"text":365,"correct":26},"发出邀请函后、发售招标文件之前",{"key":28,"text":367,"correct":22},"发售招标文件之后、召开标前会议前",{"key":31,"text":369,"correct":22},"与综合评审同时",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":28,"analysis":33},1147060,"从可行性研究、勘察设计、组织施工、设备订货、职工培训直到竣工验收，全部工作交由一个承包公司完成，这种承包方式称为（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"专项承包",{"key":24,"text":377,"correct":22},"项目承包",{"key":28,"text":379,"correct":26},"项目总承包",{"key":31,"text":381,"correct":22},"阶段承包",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},1147061,"对于矿山巷道工程项目的招标工作，做法不正确的是（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"自行招标",{"key":24,"text":389,"correct":22},"采用邀请招标",{"key":28,"text":391,"correct":22},"分施工招标和技术培训招标",{"key":31,"text":393,"correct":26},"将工作面爆破工作单独分包",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},1147062,"不应计入招标所要求的到位资金的是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":26},"未被银行证明的资金",{"key":24,"text":401,"correct":22},"银行借贷资金",{"key":28,"text":403,"correct":22},"合股资金",{"key":31,"text":405,"correct":22},"融资资金",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":31,"analysis":33},1147063,"以下招标人对投标人提出的要求，不合理的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"有同类项目的业绩证明",{"key":24,"text":413,"correct":22},"提供良好商务信誉证明",{"key":28,"text":415,"correct":22},"独立承包要求",{"key":31,"text":417,"correct":26},"充足的资金并同意垫资",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},1147064,"在矿山井巷工程中，属于隐蔽工程的是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"巷道掘进工程",{"key":24,"text":425,"correct":22},"注浆工程",{"key":28,"text":427,"correct":22},"喷混凝土工程",{"key":31,"text":429,"correct":26},"立井掘进工程",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},1147065,"以下情况，应列入风险管理内容的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":26},"地压不清井下含水层可能突水",{"key":24,"text":437,"correct":22},"建设方缺批准文件，项目可能被停建",{"key":28,"text":439,"correct":22},"技术方案不妥可能的安全威胁",{"key":31,"text":441,"correct":22},"缺资金可能影响工期拖延",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},1147066,"在下列状况中，承包商应向发包商追究损失的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"因停电6h的误工",{"key":24,"text":449,"correct":22},"因承包方采用新技术增加的费用",{"key":28,"text":451,"correct":22},"因发包方耽误使承包方延长2d工作",{"key":31,"text":453,"correct":26},"因第三方未完成“三通一平”的延误",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":28,"analysis":33},1147067,"在项目合同中，一般约定的付款方式不采用（ ）的形式。",[458,460,462,464],{"key":20,"text":459,"correct":22},"工程预付款",{"key":24,"text":461,"correct":22},"工程进度款",{"key":28,"text":463,"correct":26},"应急工程专用款",{"key":31,"text":465,"correct":22},"工程结算",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},1147068,"项目与风险情况有关联是因为（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"项目有明确的不利结果",{"key":24,"text":473,"correct":26},"项目的结果不明确",{"key":28,"text":475,"correct":22},"项目的合同已经有风险条款",{"key":31,"text":477,"correct":22},"干项目就是冒险",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":31,"analysis":33},1147069,"正确的风险应对措施，应包括实施行动(应急)步骤、时间和费用预算，最后是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"结束该项风险管理工作",{"key":24,"text":485,"correct":22},"分析风险大小",{"key":28,"text":487,"correct":22},"比较风险措施有效性",{"key":31,"text":489,"correct":26},"估计残留风险水平",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},1147070,"根据合同法的规定，以下变更的做法正确的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"变更是施工方确定，监理发布变更令",{"key":24,"text":497,"correct":22},"巷道支护形式已变更则原支护形式的工程费取消",{"key":28,"text":499,"correct":22},"由业主提出的变更其价款由施工方提出确定",{"key":31,"text":501,"correct":26},"施工方可以在施工中为加快进度提出变更要求",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},1147071,"关于索赔的认识，正确的是（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"索赔的结果都要通过法院判决",{"key":24,"text":509,"correct":22},"索赔都是由业主提出",{"key":28,"text":511,"correct":26},"合同有变更就可能引起索赔",{"key":31,"text":513,"correct":22},"施工顺序的变化不是索赔的理由",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":31,"analysis":33},1147072,"常见工程索赔类型中不包括（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"客观条件变化引起索赔",{"key":24,"text":521,"correct":22},"因为发包方违约引起的索赔",{"key":28,"text":523,"correct":22},"因合同文件缺陷引起的索赔",{"key":31,"text":525,"correct":26},"施工资料由于管理不善缺失",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":28,"analysis":33},1147073,"下列事项中，不能成为施工单位索赔理由的是（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"施工图纸未及时提供",{"key":24,"text":533,"correct":22},"施工场地未能实现“四通一平”",{"key":28,"text":535,"correct":26},"施工设备未能按时到位",{"key":31,"text":537,"correct":22},"井筒检查孔未完成",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},1147074,"根据合同法规定，（ ）可以变更合同。",[542,544,546,548],{"key":20,"text":543,"correct":22},"业主",{"key":24,"text":545,"correct":22},"设计单位",{"key":28,"text":547,"correct":22},"承包商",{"key":31,"text":549,"correct":26},"当事人协商同意后",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":24,"analysis":33},1147075,"不能成为工程索赔事件依据的索赔文件是（ ）。",[554,555,556,557],{"key":20,"text":291,"correct":22},{"key":24,"text":293,"correct":26},{"key":28,"text":295,"correct":22},{"key":31,"text":297,"correct":22},{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":31,"analysis":33},1147076,"关于费用索赔目的，错误的是（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":22},"弥补承包工程中所发生的损失费用",{"key":24,"text":565,"correct":22},"弥补已经为工程项目所支出的额外费用",{"key":28,"text":567,"correct":22},"取得已付出的劳动报酬",{"key":31,"text":569,"correct":26},"获得未来可能将要发生的额外费用",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":31,"analysis":33},1147077,"一承包商承揽了一井筒的施工任务，施工准备由承包商负责，业主协助，施工中发生的（ ）事件承包商可以向业主进行索赔。",[574,576,578,580],{"key":20,"text":575,"correct":22},"井口场地未进行平整而无法竖立井架",{"key":24,"text":577,"correct":22},"施工人员技术水平低而延误进度",{"key":28,"text":579,"correct":22},"施工设备没有及时进场而延误开工",{"key":31,"text":581,"correct":26},"施工图纸不能及时提供而延误施工",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},1147078,"下列不属于发包人违约的情况的是（ ）。",[586,588,590,592],{"key":20,"text":587,"correct":26},"自然条件变化",{"key":24,"text":589,"correct":22},"发包人更改设计",{"key":28,"text":591,"correct":22},"发包人工作不力违约",{"key":31,"text":593,"correct":22},"工程师指令或失误",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":28,"analysis":33},1147079,"矿业工程施工索赔的证据，应该包括事情的全过程和事情的方方面面。可作为常用证据的材料一般不包括（ ）。",[598,600,602,604],{"key":20,"text":599,"correct":22},"法律关系的证明材料",{"key":24,"text":601,"correct":22},"规范、标准及技术资料",{"key":28,"text":603,"correct":26},"事件发生的时间和地点",{"key":31,"text":605,"correct":22},"事件经过的相关证明",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":24,"analysis":33},1147080,"属于现场动态管理内容的是（ ）。",[610,612,614,616],{"key":20,"text":611,"correct":22},"规章制度检查",{"key":24,"text":613,"correct":26},"日常抽查",{"key":28,"text":615,"correct":22},"定期检查",{"key":31,"text":617,"correct":22},"按章考核",[619,622,625,628,631,634],{"id":15,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":15},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]