[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-801-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},801,"一建矿业工程实务","建筑工程",0,17,50,1603,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,367,379,391,403,415,427,439,451,463,475,487,499,511,523,535,547,559,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1146931,1,"单选题","矿井工程施工中，通常都会利用的永久建筑和设施是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","员工宿舍",false,{"key":24,"text":25,"correct":26},"B","副井提升系统",true,{"key":28,"text":29,"correct":22},"C","主井提升系统",{"key":31,"text":32,"correct":22},"D","办公楼","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1146932,"关于矿业工程施工的图纸准备工作，正确的要求是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"根据地质条件检查图纸是否满足工程施工要求，否则应更换图纸",{"key":24,"text":41,"correct":22},"掌握施工对工程地质条件的影响",{"key":28,"text":43,"correct":22},"检查图纸的完整、齐全性就是检查其套数，缺一套就缺一个工程内容",{"key":31,"text":45,"correct":26},"根据图纸标定的坐标确定建筑物位置，并检查其正确性",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1146933,"矿井项目的现场准备工作内容，说法不正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"做好施工场地的控制网测量施测工作",{"key":24,"text":53,"correct":22},"平整工业广场，清除障碍物",{"key":28,"text":55,"correct":22},"提出设备、机具、材料进场计划",{"key":31,"text":57,"correct":26},"完成“二通一平”工作",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1146934,"施工准备工作中的（ ）还要为确定仓库、堆场面积、组织运输准备之用。",[62,64,66,68],{"key":20,"text":63,"correct":22},"劳动力需要量计划",{"key":24,"text":65,"correct":22},"施工机械需要量计划",{"key":28,"text":67,"correct":26},"材料、设备供应计划",{"key":31,"text":69,"correct":22},"工程进度计划",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1146935,"下列工程内容，属于临时性土建工程和安装工程的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"稳车和稳车棚",{"key":24,"text":77,"correct":22},"井塔",{"key":28,"text":79,"correct":22},"行政办公楼",{"key":31,"text":81,"correct":22},"福利楼",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1146936,"矿建工程施工中设计图纸的现场签证工作主要是因为（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"图纸错误",{"key":24,"text":89,"correct":22},"施工单位根据需要提出变更",{"key":28,"text":91,"correct":26},"地质条件的不确定性导致的设计变更",{"key":31,"text":93,"correct":22},"业主调整设计方案导致设计变更",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1146937,"井巷工程开工前的劳力准备内容，要求不正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"落实人员和施工队伍",{"key":24,"text":101,"correct":22},"完成技术交底工作",{"key":28,"text":103,"correct":26},"配备好机具及施工用料",{"key":31,"text":105,"correct":22},"建立现场管理制度",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1146938,"下面属于施工准备工作中的工程准备的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"图纸会审",{"key":24,"text":113,"correct":26},"四通一平",{"key":28,"text":115,"correct":22},"制定施工设备计划",{"key":31,"text":117,"correct":22},"选择分包商",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1146939,"矿业工程在确定工期过程中，做法不合理的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"要同时明确协调内容和关系",{"key":24,"text":125,"correct":22},"要因地制宜，量力而行",{"key":28,"text":127,"correct":22},"合理配备所需资源",{"key":31,"text":129,"correct":26},"总工期必须大于合同工期",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1146940,"关于工程进度的编制，做法正确的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"工期就是各工序延续时间的和",{"key":24,"text":137,"correct":22},"工序延续时间是工序定额与人力的乘积",{"key":28,"text":139,"correct":26},"网络计划的第一步是编制工序表",{"key":31,"text":141,"correct":22},"网络优化的内容就是缩短工期",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1146941,"采用定额计算法确定工序延续时间，计算参数不包括（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"工序的工程量",{"key":24,"text":149,"correct":26},"工序的辅助时间",{"key":28,"text":151,"correct":22},"参与该工序的人力或机械数量",{"key":31,"text":153,"correct":22},"工序的产量定额",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1146942,"在一个单项工程中有多个承包单位参加施工时，应按（ ）分解进度目标。",[158,160,162,164],{"key":20,"text":159,"correct":26},"按承包单位",{"key":24,"text":161,"correct":22},"按时间前后统一",{"key":28,"text":163,"correct":22},"按施工阶段",{"key":31,"text":165,"correct":22},"按施工项目",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1146943,"矿山工程的建井工期是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"准备期与矿井竣工期之和",{"key":24,"text":173,"correct":22},"建井总工期",{"key":28,"text":175,"correct":22},"矿井投产期",{"key":31,"text":177,"correct":26},"竣工期",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1146944,"下列对网络计划编制的要求中，正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"正常的组织关系绝对不能颠倒",{"key":24,"text":185,"correct":22},"应该一次成功",{"key":28,"text":187,"correct":22},"唯一要求是满足工期要求",{"key":31,"text":189,"correct":22},"必须是最短的工时结果",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1146945,"通常，不会影响矿井建设工期的井巷工程项目是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"立井井筒",{"key":24,"text":197,"correct":22},"主要运输大巷",{"key":28,"text":199,"correct":26},"井底煤仓",{"key":31,"text":201,"correct":22},"风井总回风巷",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1146946,"确定建井工期的方法，通常是根据（ ）来确定。",[206,208,210,212],{"key":20,"text":207,"correct":22},"累计重要土建、安装工程完成时间",{"key":24,"text":209,"correct":26},"井巷工程的施工期",{"key":28,"text":211,"correct":22},"设备的最终到货时间",{"key":31,"text":213,"correct":22},"矿建、土建、安装时间总和",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1146947,"横道图施工进度计划的主要优点是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"能正确反映出工程项目的关键所在",{"key":24,"text":221,"correct":22},"能明确反映出工作之间的逻辑关系",{"key":28,"text":223,"correct":22},"可有效反映出工作所具有的机动时间",{"key":31,"text":225,"correct":26},"形象、直观，易于编制和理解",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1146948,"对初始网络图优化的关键工作是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"修订初始网络的计算错误",{"key":24,"text":233,"correct":22},"将初始网络计划画成网络图",{"key":28,"text":235,"correct":26},"可行性判断并修订",{"key":31,"text":237,"correct":22},"签字提交使用",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1146949,"通常，工程进度滞后而要求更新的最终目的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"延长工期",{"key":24,"text":245,"correct":26},"调整后续工程进度计划",{"key":28,"text":247,"correct":22},"调整前期工程量内容",{"key":31,"text":249,"correct":22},"增加索赔机会",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1146950,"当对一关键工作延误采取措施时，合理的结论是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":26},"尽早调整紧邻后续关键工序有利于尽早恢复进度正常",{"key":24,"text":257,"correct":22},"重新安排前续关键工序时间更容易满足原工期要求",{"key":28,"text":259,"correct":22},"矿建工程一般都可以通过对头掘进的方法恢复工期进度",{"key":31,"text":261,"correct":22},"平行作业法对提高不同条件下的井巷施工速度都很有效",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1146951,"当关键线路的某工程项目施工进度被拖延时，以下措施合理的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"可以利用工作自由时差调整",{"key":24,"text":269,"correct":22},"缩短该线路上的后续工序持续时间来调整",{"key":28,"text":271,"correct":22},"可以利用工作总时差调整",{"key":31,"text":273,"correct":26},"可以利用某非关键线路上的总时差调整",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},1146952,"属于设计因素影响施工进度计划的内容，包括有（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"施工方认为设计要求的技术过高",{"key":24,"text":281,"correct":22},"建设方资金投入满足不了设计要求",{"key":28,"text":283,"correct":22},"设备与设计要求不符",{"key":31,"text":285,"correct":26},"建设方要求决定的设计变更",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},1146953,"在进度计划受影响时，措施不合理的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"调配人员和设备力量",{"key":24,"text":293,"correct":22},"建设或监理单位协调",{"key":28,"text":295,"correct":22},"采取一定经济措施",{"key":31,"text":297,"correct":26},"施工单位削减设计内容",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1146954,"关于矿山工程进度控制中的事中控制内容，正确的说法是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"及时检查与协调",{"key":24,"text":305,"correct":22},"改变物资供应计划",{"key":28,"text":307,"correct":22},"及时调整施工计划",{"key":31,"text":309,"correct":22},"变更资金供应方式",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1146955,"加快井巷工程关键线路工作施工的有效措施是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"主井和副井同时施工",{"key":24,"text":317,"correct":26},"矿井贯通巷道安排重点队伍施工",{"key":28,"text":319,"correct":22},"积极做好通风和排水工作",{"key":31,"text":321,"correct":22},"采区煤巷采用掘进机施工",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},1146956,"矿井井筒施工阶段，进度控制的要点是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"优化井筒施工提升方案，保证井筒施工提升能力",{"key":24,"text":329,"correct":22},"选用大型抓岩机，加快井筒施工的出渣速度",{"key":28,"text":331,"correct":26},"认真处理好主井井筒与装载硐室的施工",{"key":31,"text":333,"correct":22},"做好主、副井交替装备工作",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1146957,"以下有利于矿山项目提前竣工的合理方法是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"不设井筒单开巷道",{"key":24,"text":341,"correct":26},"永久井塔可以安装好再移到井口",{"key":28,"text":343,"correct":22},"基岩采用箕斗提升",{"key":31,"text":345,"correct":22},"施工力量均匀安排在各个工作面",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":28,"analysis":33},1146958,"下列进度控制措施中，属于组织管理措施的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"优选施工方案",{"key":24,"text":353,"correct":22},"采用新技术、新工艺",{"key":28,"text":355,"correct":26},"加强总包与分包单位间的协调工作",{"key":31,"text":357,"correct":22},"编制资源需求计划",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},1146959,"工序能力指数记为CPK(或C D)可以判别工序施工状态好坏。一般把工序能力指数分5级，其中，表示工序能力指数合格，但不充分的是等级（ ）。",[362,364,365,366],{"key":20,"text":363,"correct":22},"特级",{"key":24,"text":20,"correct":22},{"key":28,"text":24,"correct":26},{"key":31,"text":28,"correct":22},{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},1146960,"工程质量事故分为四个等级，下列不属于其中四个等级的是（ ）。",[371,373,375,377],{"key":20,"text":372,"correct":22},"特别重大事故",{"key":24,"text":374,"correct":26},"较重大事故",{"key":28,"text":376,"correct":22},"较大事故",{"key":31,"text":378,"correct":22},"一般事故",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":28,"analysis":33},1146961,"按照《建设工程质量管理条例》的规定，建设工程发生质量事故，有关单位应在（ ）内向当地建设行政主管部门和其他有关部门报告。",[383,385,387,389],{"key":20,"text":384,"correct":22},"8h",{"key":24,"text":386,"correct":22},"12h",{"key":28,"text":388,"correct":26},"24h",{"key":31,"text":390,"correct":22},"48h",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":28,"analysis":33},1146962,"根据统计观念，抽样判别均存在误判或漏判的概率，一般项目的误判率和漏判率分别在（ ）以下。",[395,397,399,401],{"key":20,"text":396,"correct":22},"3％；5％",{"key":24,"text":398,"correct":22},"5％：8％",{"key":28,"text":400,"correct":26},"5％；10％",{"key":31,"text":402,"correct":22},"8％：10％",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},1146963,"工序能力指数记为CPK(或CP)可以判别工序施工状态好坏。理想的工序能力指数的范围是（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"CPK≤0．67",{"key":24,"text":410,"correct":22},"1．0>CPK>0．67",{"key":28,"text":412,"correct":22},"1．33>CPK>1．0",{"key":31,"text":414,"correct":26},"1．67>CPK>1．3",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":31,"analysis":33},1146964,"对于工程质量一般事故中的直接经济损失部分给出了其下限，即直接经济损失所在范围为（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"50万元以上500万元以下",{"key":24,"text":422,"correct":22},"50万元以上1000万元以下",{"key":28,"text":424,"correct":22},"100万元以上500万元以下",{"key":31,"text":426,"correct":26},"100万元以上1000万元以下",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":28,"analysis":33},1146965,"施工单位接到质量通知单后在（ ）的组织与参与下，应尽快进行质量事故的调查，写出质量事故的报告。",[431,433,435,437],{"key":20,"text":432,"correct":22},"设计工程师",{"key":24,"text":434,"correct":22},"项目经理",{"key":28,"text":436,"correct":26},"监理工程师",{"key":31,"text":438,"correct":22},"质量工程师",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":20,"analysis":33},1146966,"下列不属于质量保证体系的内容是（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":26},"实施保证体系",{"key":24,"text":446,"correct":22},"组织保证体系",{"key":28,"text":448,"correct":22},"思想保证体系",{"key":31,"text":450,"correct":22},"工作保证体系",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":28,"analysis":33},1146967,"在排列图法中，习惯上通常将影响因素分为三类，其中属于B类的累计频率为（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"0～80％",{"key":24,"text":458,"correct":22},"50％～80％",{"key":28,"text":460,"correct":26},"80％～90％",{"key":31,"text":462,"correct":22},"90％～100％",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},1146968,"特别重大质量事故的调查程序应按照（ ）有关规定办理。",[467,469,471,473],{"key":20,"text":468,"correct":22},"当地人民政府",{"key":24,"text":470,"correct":22},"上级建设行政主管部门",{"key":28,"text":472,"correct":22},"事故发生地的建设行政主管部门",{"key":31,"text":474,"correct":26},"国务院",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},1146969,"基槽开挖后，在基坑底可不进行轻型动力触探的情形是（ ）。",[479,481,483,485],{"key":20,"text":480,"correct":22},"持力层明显不均匀",{"key":24,"text":482,"correct":22},"有浅埋的坑穴、古墓、古井等，直接观察难以发现时",{"key":28,"text":484,"correct":22},"浅部有软弱下卧层",{"key":31,"text":486,"correct":26},"基坑有承压水层，触探可造成冒水涌砂时",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":20,"analysis":33},1146970,"露天矿疏干井工程扩孔时，符合要求的是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":26},"扩孔期间，每小班应提钻一次",{"key":24,"text":494,"correct":22},"应减少扩孔直径级差",{"key":28,"text":496,"correct":22},"增加扩孔级差",{"key":31,"text":498,"correct":22},"扩孔速度越快越好",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":24,"analysis":33},1146971,"较薄的平面结构混凝土通常采用（ ）进行振捣。",[503,505,507,509],{"key":20,"text":504,"correct":22},"振捣棒",{"key":24,"text":506,"correct":26},"平板振捣器",{"key":28,"text":508,"correct":22},"附壁振动器",{"key":31,"text":510,"correct":22},"表面加压振动",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},1146972,"?立井井筒基岩炮眼钻进时，不符合要求的是（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"应避开残眼和岩层裂隙",{"key":24,"text":518,"correct":26},"荒直径小于5m时，宜采用伞形钻架钻眼",{"key":28,"text":520,"correct":22},"掏槽眼应按要求增加深度",{"key":31,"text":522,"correct":22},"每圈炮眼应钻至同一水平位置",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1146973,"倾斜巷道倾角为12度，支架架设的迎山角为（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"1度～2度",{"key":24,"text":530,"correct":26},"2度～3度",{"key":28,"text":532,"correct":22},"3度～4度",{"key":31,"text":534,"correct":22},"4度～5度",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},1146974,"锚杆安装时其外露太长、托盘不能贴紧岩面的工序衔接问题是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":26},"锚杆孔的深度未检查",{"key":24,"text":542,"correct":22},"锚杆预紧力不够",{"key":28,"text":544,"correct":22},"锚杆长度过长",{"key":31,"text":546,"correct":22},"锚杆固结时间太早",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":28,"analysis":33},1146975,"对锚杆支护能力有重要影响的锚杆施工质量指标是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"锚杆杆体强度",{"key":24,"text":554,"correct":22},"锚固力",{"key":28,"text":556,"correct":26},"抗拉拔力",{"key":31,"text":558,"correct":22},"砂浆强度",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},1146976,"分部工程质量由（ ）组织有关单位和人员进行验收。",[563,565,566,568],{"key":20,"text":564,"correct":26},"总监理工程师",{"key":24,"text":434,"correct":22},{"key":28,"text":567,"correct":22},"施工单位负责人",{"key":31,"text":569,"correct":22},"施工员",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},1146977,"矿山(煤矿)井巷工程分项工程的检验验收，应在（ ）基础上由监理工程师组织验收。",[574,576,578,580],{"key":20,"text":575,"correct":22},"隐蔽工程验收",{"key":24,"text":577,"correct":26},"施工班组的自检",{"key":28,"text":579,"correct":22},"检验批验收",{"key":31,"text":581,"correct":22},"子分项工程验收",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":31,"analysis":33},1146978,"立井井筒工程竣工验收时，通常不检查（ ）。",[586,588,590,592],{"key":20,"text":587,"correct":22},"井筒中心坐标和断面大小",{"key":24,"text":589,"correct":22},"井壁质量",{"key":28,"text":591,"correct":22},"井筒涌水量的大小",{"key":31,"text":593,"correct":26},"通过井筒的风速大小",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},1146979,"基岩裸露巷道掘进采用光面爆破时，其周边眼的眼痕率不应（ ）。",[598,600,602,604],{"key":20,"text":599,"correct":22},"小于50％",{"key":24,"text":601,"correct":26},"小于60％",{"key":28,"text":603,"correct":22},"大于50％",{"key":31,"text":605,"correct":22},"大于60％",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":28,"analysis":33},1146980,"关于露天矿疏干井工程验收合格要求，以下说法错误的是（ ）。",[610,612,614,616],{"key":20,"text":611,"correct":22},"钻井管井深度小于100m，管井斜度小于2。",{"key":24,"text":613,"correct":22},"导正器规格、设置的数量应符合疏干井设计要求，且不影响滤料的填人",{"key":28,"text":615,"correct":26},"钻井管井深度大于100m时，每增加100m，管井斜度小于1。",{"key":31,"text":617,"correct":22},"过滤器的综合孔隙率与设计值的误差不得超过10％",[619,622,625,628,631,634],{"id":15,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":15},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]