[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-801-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":619},{"id":5,"name":6,"category":7,"favorite":8},801,"一建矿业工程实务","建筑工程",0,16,50,1603,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,379,391,403,415,427,439,451,463,475,487,499,511,523,535,547,559,571,583,595,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1146881,1,"单选题","比可塑黏土的天然含水量更高、土质更软的是( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","软黏土",true,{"key":24,"text":25,"correct":26},"B","粉质黏土",false,{"key":28,"text":29,"correct":26},"C","硬塑黏土",{"key":31,"text":32,"correct":26},"D","流动态土","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1146882,"设V1是开挖前土体自然体积，V2是开挖后的松散土体体积，V3是运去填方压实后的土体体积；则为计算充填一定体积大小并经过压实其所需要的挖掘体积，需要的参数是( )。",[38,40,42,44],{"key":20,"text":39,"correct":26},"V1和V2",{"key":24,"text":41,"correct":22},"V1和V3",{"key":28,"text":43,"correct":26},"V3和V2",{"key":31,"text":45,"correct":26},"V1、V2和V3",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1146883,"根据岩土锚喷支护规范的围岩分类方法，属于稳定性较差的围岩是指：跨度为3～5m巷道的稳定时间为( )。",[50,52,54,56],{"key":20,"text":51,"correct":26},"一个月以上",{"key":24,"text":53,"correct":26},"10天以内",{"key":28,"text":55,"correct":22},"仅有几天",{"key":31,"text":57,"correct":26},"1天以内",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1146884,"根据《煤矿井巷工程施工规范》GB 50511--2010，泥岩、胶结不好的砂岩、煤等属于( )岩层。",[62,64,66,68],{"key":20,"text":63,"correct":26},"稳定",{"key":24,"text":65,"correct":26},"中等稳定",{"key":28,"text":67,"correct":22},"弱稳定",{"key":31,"text":69,"correct":26},"不稳定",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1146885,"岩体节理面的重要力学特性是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"强度性质有方向性",{"key":24,"text":77,"correct":26},"抗剪强度高",{"key":28,"text":79,"correct":26},"抗压强度低",{"key":31,"text":81,"correct":26},"有较好的抗拉强度",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1146886,"关于岩体断层特点的说法，不正确的是( )。",[86,88,90,92],{"key":20,"text":87,"correct":26},"断层是岩体的断裂形式",{"key":24,"text":89,"correct":26},"沿断裂岩面水平运动的是平推断层",{"key":28,"text":91,"correct":26},"断层的断距和落差不同",{"key":31,"text":93,"correct":22},"断层都会引起涌水",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1146887,"开采侏罗系煤层的矿井，主要充水含水层为( )。",[98,100,102,104],{"key":20,"text":99,"correct":26},"松散砂层含水层",{"key":24,"text":101,"correct":22},"基岩裂隙带(水)",{"key":28,"text":103,"correct":26},"煤层顶板砂岩含水层",{"key":31,"text":105,"correct":26},"岩溶含水层",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1146888,"下列属于人为产生的矿井通水通道为( )。",[110,112,114,116],{"key":20,"text":111,"correct":26},"压力裂隙",{"key":24,"text":113,"correct":26},"导水陷落柱",{"key":28,"text":115,"correct":26},"岩溶塌陷",{"key":31,"text":117,"correct":22},"封闭不良的钻孔",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1146889,"水文地质条件复杂、极复杂矿井应当( )至少开展一次水害隐患排查及治理活动。",[122,124,126,128],{"key":20,"text":123,"correct":22},"每月",{"key":24,"text":125,"correct":26},"每季",{"key":28,"text":127,"correct":26},"每年",{"key":31,"text":129,"correct":26},"每半年",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1146890,"探放老空积水最小超前水平钻距不得小于( )m，止水套管长度不得小于10m。",[134,136,138,140],{"key":20,"text":135,"correct":26},"10",{"key":24,"text":137,"correct":26},"20",{"key":28,"text":139,"correct":22},"30",{"key":31,"text":141,"correct":26},"40",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1146891,"报废的井巷必须做好隐蔽工程记录，并在( )上标明，归档备查。",[146,148,150,152],{"key":20,"text":147,"correct":26},"采掘工程平面图",{"key":24,"text":149,"correct":22},"井上下对照图",{"key":28,"text":151,"correct":26},"井田地形地质图",{"key":31,"text":153,"correct":26},"矿井充水性图",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1146892,"矿图中，矿体等高线变得更密集时，表示矿体出现( )现象。",[158,160,162,164],{"key":20,"text":159,"correct":26},"走向改变",{"key":24,"text":161,"correct":26},"倾向有变化",{"key":28,"text":163,"correct":22},"倾角变陡",{"key":31,"text":165,"correct":26},"坡度变小",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1146893,"关于施工测量工作的基本目标，说法正确的( )。",[170,172,174,176],{"key":20,"text":171,"correct":26},"标定建筑物的大小、高程",{"key":24,"text":173,"correct":26},"确定设计图纸的尺度",{"key":28,"text":175,"correct":22},"可以对建筑物定位、放样",{"key":31,"text":177,"correct":26},"保证建筑物施工精度",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1146894,"施工测量控制网的精度一般和( )无关。",[182,184,186,188],{"key":20,"text":183,"correct":22},"建筑物的大小",{"key":24,"text":185,"correct":26},"建筑物的性质",{"key":28,"text":187,"correct":26},"建筑材料的种类",{"key":31,"text":189,"correct":26},"建筑结构形式",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1146895,"施工测量控制网的建立，可使区域内的施工测量统一部署，还可以( )。",[194,196,198,200],{"key":20,"text":195,"correct":26},"提高测量精度",{"key":24,"text":197,"correct":26},"形成建筑物轴线",{"key":28,"text":199,"correct":26},"构成施工质量的核查依据",{"key":31,"text":201,"correct":22},"控制测量误差的传递",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1146896,"GPS的测量数据可以获得的最终结论是被测量位置的( )。",[206,208,210,212],{"key":20,"text":207,"correct":26},"绝对高程",{"key":24,"text":209,"correct":26},"相对高程",{"key":28,"text":211,"correct":22},"三维坐标",{"key":31,"text":213,"correct":26},"平面坐标",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1146897,"石灰岩属于( )岩石。",[218,220,222,224],{"key":20,"text":219,"correct":26},"火山岩",{"key":24,"text":221,"correct":26},"变质岩",{"key":28,"text":223,"correct":26},"岩浆岩",{"key":31,"text":225,"correct":22},"沉积岩",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1146898,"在井下，会给围岩造成最严重破坏的地应力往往是( )。",[230,232,234,236],{"key":20,"text":231,"correct":26},"自重应力",{"key":24,"text":233,"correct":22},"构造应力",{"key":28,"text":235,"correct":26},"温度应力",{"key":31,"text":237,"correct":26},"水压力",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1146899,"对于地表水形成井巷涌水的原因，说法不正确的是( )",[242,244,246,248],{"key":20,"text":243,"correct":26},"因洪水水位高出井口标高",{"key":24,"text":245,"correct":22},"由河水顺井筒流入井底",{"key":28,"text":247,"correct":26},"井筒揭露地表水层时并沿井壁形成水通道",{"key":31,"text":249,"correct":26},"巷道顶板导水裂隙带贯通地表水",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},1146900,"矿山井下平面控制测量的方法主要是采用( )形式。",[254,256,258,260],{"key":20,"text":255,"correct":26},"方格网",{"key":24,"text":257,"correct":26},"三角网",{"key":28,"text":259,"correct":22},"导线网",{"key":31,"text":261,"correct":26},"GPS网",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},1146901,"矿井进行井上下的联系测量，至少应满足( )的要求。",[266,268,270,272],{"key":20,"text":267,"correct":26},"重复进行两次",{"key":24,"text":269,"correct":26},"连续进行两次",{"key":28,"text":271,"correct":22},"独立进行两次",{"key":31,"text":273,"correct":26},"两人进行两次",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},1146902,"属于矿井巷道贯通的几何要素是( )。",[278,280,282,284],{"key":20,"text":279,"correct":22},"巷道贯通距离",{"key":24,"text":281,"correct":26},"腰线",{"key":28,"text":283,"correct":26},"中心线",{"key":31,"text":285,"correct":26},"巷道施工长度",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1146903,"关于陀螺经纬仪的功能，说法正确的是( )。",[290,292,294,296],{"key":20,"text":291,"correct":26},"用陀螺仪测量必须依附已知直线方位",{"key":24,"text":293,"correct":22},"陀螺经纬仪可以自行定向",{"key":28,"text":295,"correct":26},"陀螺经纬仪是可旋转的经纬仪",{"key":31,"text":297,"correct":26},"陀螺经纬仪指陀螺有经纬仪功能",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1146904,"矿产资源的开发首先是由（ ）所决定。",[302,304,306,308],{"key":20,"text":303,"correct":22},"矿产资源赋存条件",{"key":24,"text":305,"correct":26},"地区经济条件",{"key":28,"text":307,"correct":26},"地区交通条件",{"key":31,"text":309,"correct":26},"资源开发的技术水平",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},1146905,"进行矿山规划、设计的前提条件是具有被批准的（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"建设的可行性报告",{"key":24,"text":317,"correct":26},"技术方案",{"key":28,"text":319,"correct":22},"资源的勘探报告",{"key":31,"text":321,"correct":26},"审批报告",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},1146906,"影响矿产资源的产业发展及其开发的基本环节是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"资源储存条件与地域经济需求",{"key":24,"text":329,"correct":26},"资源开发能力与资源市场运作",{"key":28,"text":331,"correct":22},"国家规划调控与资源市场运作",{"key":31,"text":333,"correct":26},"地域经济需求和资源开发能力",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},1146907,"构成项目内容、可以独立发挥生产能力或效益的工程，称为（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"单项工程",{"key":24,"text":341,"correct":26},"单位工程",{"key":28,"text":343,"correct":26},"分项工程",{"key":31,"text":345,"correct":26},"分部工程",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},1146908,"煤矿井巷工程的施工内容中，属于单位工程的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"通风安全设施",{"key":24,"text":353,"correct":26},"巷道水沟",{"key":28,"text":355,"correct":26},"井筒壁座",{"key":31,"text":357,"correct":26},"井底水窝",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},1146909,"井筒工程的子单位工程是按井筒单位工程的（ ）划分的部分。",[362,364,366,368],{"key":20,"text":363,"correct":26},"不同工程材料",{"key":24,"text":365,"correct":22},"不同施工年度",{"key":28,"text":367,"correct":26},"不同工程部位",{"key":31,"text":369,"correct":26},"不同施工工种",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},1146910,"划分巷道主体工程的子分部工程的一种方法是按巷道主体分部工程的（ ）划分的部分。",[374,375,376,377],{"key":20,"text":363,"correct":26},{"key":24,"text":367,"correct":26},{"key":28,"text":369,"correct":26},{"key":31,"text":378,"correct":22},"不同支护方式",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":31,"analysis":33},1146911,"在矿山工程项目中，决定地面生产系统布局和影响施工设施布局的，主要是（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":26},"施工方案",{"key":24,"text":386,"correct":26},"土建工程",{"key":28,"text":388,"correct":26},"大型施工设备",{"key":31,"text":390,"correct":22},"地下产生系统",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":31,"analysis":33},1146912,"通常情况下井筒是矿井工程的关键工程，其主要原因是（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":26},"井筒工程量比较大",{"key":24,"text":398,"correct":26},"井筒施工难度比较大",{"key":28,"text":400,"correct":26},"井筒施工承担着探明地层条件的任务",{"key":31,"text":402,"correct":22},"井筒是进入井下开拓空间的必经之路",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},1146913,"下面属于分项工程的是（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":26},"尾矿坝工程中的护坡工程",{"key":24,"text":410,"correct":26},"尾矿坝工程中的导流工程",{"key":28,"text":412,"correct":26},"露天煤矿道路工程中的基层工程",{"key":31,"text":414,"correct":22},"井筒施工中的掘进工程",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},1146914,"单位工程施工组织设计的编制依据应包括（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":26},"编制单位的上级机关文件",{"key":24,"text":422,"correct":26},"地方政府审批书",{"key":28,"text":424,"correct":22},"合同和招标文件",{"key":31,"text":426,"correct":26},"监理单位意见书",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":31,"analysis":33},1146915,"施工组织设计的优化，最终应体现在（ ）上。",[431,433,435,437],{"key":20,"text":432,"correct":26},"工程规模",{"key":24,"text":434,"correct":26},"施工速度",{"key":28,"text":436,"correct":26},"投资费用",{"key":31,"text":438,"correct":22},"经济技术指标",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":28,"analysis":33},1146916,"矿业工程中，（ ）总是构成矿井工程项目关键路线的关键工程。",[443,445,447,449],{"key":20,"text":444,"correct":26},"行政办公楼工程",{"key":24,"text":446,"correct":26},"井架安装工程",{"key":28,"text":448,"correct":22},"井筒掘砌工程",{"key":31,"text":450,"correct":26},"储矿仓与铁路",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":28,"analysis":33},1146917,"风井若在关键线路上，则安排风井（ ）不合理。",[455,457,459,461],{"key":20,"text":456,"correct":26},"比主、副井提前开工",{"key":24,"text":458,"correct":26},"略晚于主、副井开工",{"key":28,"text":460,"correct":22},"于主、副井完成后开工",{"key":31,"text":462,"correct":26},"与主、副井同时开工",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},1146918,"一般井筒施工中，含主井改装的提升运输形式存在三个阶段，其顺序合理的是（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":26},"副井吊桶提升(主井改装)期、主副井未贯通期和主井临时罐笼提升期",{"key":24,"text":470,"correct":22},"主副井未贯通期、副井吊桶提升(主井改装)期和主井临时罐笼提升期",{"key":28,"text":472,"correct":26},"主井临时罐笼提升期、主副井未贯通期和副井吊桶提升(主井改装)期",{"key":31,"text":474,"correct":26},"主副井未贯通期、主井临时罐笼提升期和副井吊桶提升(主井改装)期",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":20,"analysis":33},1146919,"建设单位编制的单项工程施工组织设计需要（ ）组织审批。",[479,481,483,485],{"key":20,"text":480,"correct":22},"建设单位的上级主管部门",{"key":24,"text":482,"correct":26},"设计单位",{"key":28,"text":484,"correct":26},"地方行政主管部门",{"key":31,"text":486,"correct":26},"施工单位的上级机关",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":20,"analysis":33},1146920,"单位工程施工组织设计由承担施工任务的单位负责编制，吸收建设单位、设计部门参加，由（ ）审批。",[491,493,495,497],{"key":20,"text":492,"correct":22},"编制单位报上一级领导机关",{"key":24,"text":494,"correct":26},"工程处审批",{"key":28,"text":496,"correct":26},"公司(局)",{"key":31,"text":498,"correct":26},"建设单位",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":24,"analysis":33},1146921,"单项工程施工组织设计适用于（ ）。",[503,505,507,509],{"key":20,"text":504,"correct":26},"矿区项目",{"key":24,"text":506,"correct":22},"矿井项目",{"key":28,"text":508,"correct":26},"井筒项目",{"key":31,"text":510,"correct":26},"冻结井筒施工项目",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":28,"analysis":33},1146922,"着重于施工方案内容、总工期和投资概算内容的单项工程施工组织设计，应在（ ）编制完成。",[515,517,519,521],{"key":20,"text":516,"correct":26},"合同签订前完成",{"key":24,"text":518,"correct":26},"合同签订后完成",{"key":28,"text":520,"correct":22},"招投标前完成",{"key":31,"text":522,"correct":26},"招投标后完成",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1146923,"单位工程施工组织设计的工程量计算，具有（ ）的特点。",[527,529,531,533],{"key":20,"text":528,"correct":26},"根据概算指标",{"key":24,"text":530,"correct":22},"要求比较准确",{"key":28,"text":532,"correct":26},"依据初步设计",{"key":31,"text":534,"correct":26},"依据企业定额指标",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},1146924,"矿山井巷工程的开拓方式分为（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"单向掘进和对头掘进",{"key":24,"text":542,"correct":26},"单向掘进和双向掘进",{"key":28,"text":544,"correct":26},"双向掘进和对头掘进",{"key":31,"text":546,"correct":26},"单头掘进和单向掘进",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":24,"analysis":33},1146925,"主副井错开施工的时间应根据最优网络图而定，一般为（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":26},"1～4个星期",{"key":24,"text":554,"correct":22},"1～4个月",{"key":28,"text":556,"correct":26},"2～4个月",{"key":31,"text":558,"correct":26},"3～6个月",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":31,"analysis":33},1146926,"主副井贯通前，矿井的通风方式是利用（ ）进行通风。",[563,565,567,569],{"key":20,"text":564,"correct":26},"副井进风，主井出风",{"key":24,"text":566,"correct":26},"主井进风，副井出风",{"key":28,"text":568,"correct":26},"在井下贯通联络巷内修建临时风门",{"key":31,"text":570,"correct":22},"原来凿井时的通风设备",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},1146927,"井底车场巷道施工的组织中，最主要的原则是（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":26},"施工工作面数量主要由劳力多少决定",{"key":24,"text":578,"correct":22},"施工工作队数量应根据工期要求、资源条件、井下空间等综合确定",{"key":28,"text":580,"correct":26},"车场施工安排主要应考虑供电能力大小",{"key":31,"text":582,"correct":26},"涌水大时巷道施工顺序应考虑避免上山掘进",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":20,"analysis":33},1146928,"矿井建设期间为综合平衡的“四个排队”中，规模、影响、范围最大是（ ）的排队。",[587,589,591,593],{"key":20,"text":588,"correct":22},"井巷、土建和机电设备安装工程间",{"key":24,"text":590,"correct":26},"设备间",{"key":28,"text":592,"correct":26},"年度计划与季度计划",{"key":31,"text":594,"correct":26},"多工序间",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":31,"analysis":33},1146929,"关于现场勘察和施测的内容，说法错误的是（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":26},"现场勘察要调查地区可提供的水、电条件",{"key":24,"text":602,"correct":26},"现场勘察应掌握当地生活服务能力",{"key":28,"text":604,"correct":26},"调查的内容包括风俗习惯",{"key":31,"text":606,"correct":22},"现场勘察的内容限于工业广场范围",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":24,"analysis":33},1146930,"关于施工总平面布置的原则，正确的是（ ）。",[611,613,615,617],{"key":20,"text":612,"correct":26},"压风机房位置确定后，则提升机房的布置不宜离其过近",{"key":24,"text":614,"correct":22},"斜井施工中临时提升机布置在永久提升机的前方",{"key":28,"text":616,"correct":26},"混凝土搅拌站施工任务繁重应设置在变电所附件",{"key":31,"text":618,"correct":26},"为避免炸药库安全事故的影响，宜将其布置在广场的空旷处",[620,623,626,629,632,635],{"id":15,"name":621,"category":7,"favorite":622},"领导干部任职前廉政法规知识测试题",92,{"id":624,"name":625,"category":7,"favorite":15},595,"建筑结构与设备",{"id":627,"name":628,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":630,"name":631,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":633,"name":634,"category":7,"favorite":8},534,"BIM工程师",{"id":636,"name":634,"category":7,"favorite":8},535]