[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1147838":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1147838,801,2,"多选题","某井筒为混凝土结构，有关其竣工验收的说法，正确的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","该井筒验收一般按一个分部工程验收",false,{"key":16,"text":17,"correct":14},"B","该井筒也无需划分子分部工程",{"key":19,"text":20,"correct":21},"C","其观感质量验收的得分率应在70％以上",true,{"key":23,"text":24,"correct":21},"D","该井筒验收的质量控制资料应包含隐蔽工程验收资料",{"key":26,"text":27,"correct":21},"E","井筒壁后充填材料及充填密实要求属于其主控项目内容","CDE","井筒结构一般分为井颈、井身、井窝等三个分部工程(A)；尽管该井筒只有混凝土结构，但是井筒施工一般要经过几个月或者更多，因此要按验收月划分为多个子分部工程(B)；井筒工程属于单位工程，单位工程的观感质量验收的得分率70％为其合格要求(C)；井筒在混凝土井壁施工时应有合格的隐蔽工程验收(如裸露井筒的质量等)合格的要求(D)；井筒的壁后充填检查属于主控项目(E)。",{"id":6,"name":31,"category":32,"favorite":33},"一建矿业工程实务","建筑工程",0]