[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1147708":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1147708,801,2,"多选题","关于基坑开挖施工，说法正确的有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","场地开挖一般采取由上而下、分块分段分层进行",true,{"key":16,"text":17,"correct":18},"B","相邻基坑开挖时应先浅后深或同时进行",false,{"key":20,"text":21,"correct":14},"C","在基坑边缘上侧堆土或材料以及移动施工机械时，应与基坑边缘保持1m以上距离",{"key":23,"text":24,"correct":18},"D","填土应按不同土的透水性从小到大，自下而上分层回填",{"key":26,"text":27,"correct":18},"E","填土压实的分层厚度、压实遍数与填土含水情况无关","AC","相邻基坑开挖时应先深后浅或同时进行；填土的土质不同时，应有规则地分层，将透水性大的土层置于透水性较小的土层之下；填土压实的分层厚度与压实遍数同压实机械的功率、填土种类和含水情况都有关。",{"id":6,"name":31,"category":32,"favorite":33},"一建矿业工程实务","建筑工程",0]