[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1147567":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1147567,801,2,"多选题","室内地面涂料防水的施工技术要求说法正确的是（）",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","施工环境温度应符合防水材料的技术要求，并宜在5℃以上",true,{"key":16,"text":17,"correct":14},"B","防水层应从地面延伸到墙面，高出地面100mm",{"key":19,"text":20,"correct":14},"C","涂膜涂刷应均匀一致，不得漏刷",{"key":22,"text":23,"correct":14},"D","防水层完工后，经蓄水试验无渗漏，方可铺设面层",{"key":25,"text":26,"correct":27},"E","蓄水高度不超过100mm，蓄水时间为24-48h",false,"ABCD","2020版教材页码P47-48 室内地面涂料防水的施工技术要求： 1.施工环境温度应符合防水材料的技术要求，并宜在5℃以上。 2.防水层应从地面延伸到墙面，高出地面100mm。 3.涂膜涂刷应均匀一致，不得漏刷。 4.防水层完工后，经蓄水试验无渗漏，方可铺设面层。蓄水高度不超过200mm，蓄水时间为24-48h。",{"id":6,"name":31,"category":32,"favorite":33},"一建矿业工程实务","建筑工程",0]