[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1147106":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1147106,801,1,"单选题","矿井水害恢复后，应全面整理（ ）两个过程的图纸和资料。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","人员受害和被救",false,{"key":16,"text":17,"correct":14},"B","设备被淹和抢修",{"key":19,"text":20,"correct":21},"C","矿井淹没和恢复",true,{"key":23,"text":24,"correct":14},"D","灾害水流通途径的进出","矿井恢复后，应当全面整理淹没和恢复两个过程的图纸和资料，确定突水原因，提出避免发生重复事故的措施意见，并总结排水恢复中水文地质工作的经验和教训。",{"id":6,"name":27,"category":28,"favorite":29},"一建矿业工程实务","建筑工程",0]