[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1147055":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1147055,801,1,"单选题","根据《建设工程工程量清单计价规范》GB50500--2013，编制分部分项清单时，编制人员须确定项目名称、计量单位、工程数量和（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","填表须知",false,{"key":16,"text":17,"correct":18},"B","项目特征",true,{"key":20,"text":21,"correct":14},"C","项目总说明",{"key":23,"text":24,"correct":14},"D","项目工程内容","分部分项工程项目清单的编制要确定项目编码、项目名称、项目特征、计量单位，并按不同专业工程量计算规范给出的工程量计算规则，进行工程量的计算。",{"id":6,"name":27,"category":28,"favorite":29},"一建矿业工程实务","建筑工程",0]