[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1147040":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1147040,801,1,"单选题","承发包双方在施工合同中约定的和合同价款无关的事项有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","投标保证金的数额、支付方式及时间",true,{"key":16,"text":17,"correct":18},"B","工程价款的调整因素、方法、程序、支付方式及时间",false,{"key":20,"text":21,"correct":18},"C","承担计价风险的内容、范围以及超出约定内容、范围的调整方法。",{"key":23,"text":24,"correct":18},"D","工程竣工价款结算编制与核对、支付方式及时间","投标保证金的数额、支付方式及时间和施工阶段的合同价款确定和调整都没有关系，因为签订合同时候投标过程已经结束了，所以选A。",{"id":6,"name":27,"category":28,"favorite":29},"一建矿业工程实务","建筑工程",0]