[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1146851":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1146851,801,1,"单选题","立井施工时吊桶要( )布置。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","在井筒中心线上，并偏离提升机一侧",false,{"key":16,"text":17,"correct":14},"B","在井筒中心线上，并靠近提升机一侧",{"key":19,"text":20,"correct":14},"C","偏离井筒中心线，并偏离提升机一侧",{"key":22,"text":23,"correct":24},"D","偏离井筒中心线，并靠近提升机一侧",true,"凿井施工中，吊桶是用于上下人员、运送材料设备和出矸的主要设备，井筒施工时，吊桶的上下提升运行频繁，其布置要求较高，既要满足提升的需要，也要综合考虑凿井井架受力平衡和井筒到底后改装的需要。通常，吊桶布置要偏离井筒中心线，并靠近提升机一侧布置，对双滚筒提升机作单滚筒用时，吊桶应布置在固定滚筒提升中心线上。多套提升时的布置应使井架受力均匀；在需要临时改绞的井筒中布置吊桶时应考虑车场施工时的临时罐笼提升的方位要求；吊桶通过喇叭口时，其最突出部分与孔口之间的安全间隙必须符合安全要求。显然，答案应选择D。",{"id":6,"name":27,"category":28,"favorite":29},"一建矿业工程实务","建筑工程",0]