[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1146748":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1146748,801,1,"单选题","钢筋混凝土预制桩打桩施工时应当( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","轻锤低击",false,{"key":16,"text":17,"correct":14},"B","轻锤重击",{"key":19,"text":20,"correct":21},"C","重锤低击",true,{"key":23,"text":24,"correct":14},"D","重锤重击","正式打桩时宜用“重锤低击”、“低提重打”的方法。",{"id":6,"name":27,"category":28,"favorite":29},"一建矿业工程实务","建筑工程",0]