[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1146499":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1146499,801,1,"单选题","穿爆工程施工，孔径大于（）的穿孔设备必须配备除尘设施。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","60mm",false,{"key":16,"text":17,"correct":14},"B","80mm",{"key":19,"text":20,"correct":14},"C","90mm",{"key":22,"text":23,"correct":24},"D","100mm",true,"2020版教材页码P140-142 穿爆工程施工，孔径大于100mm的穿孔设备必须配备除尘设施。抛掷爆破台阶，在距离坡顶线8m以内范围严禁钻机沿坡顶线平行方向行走，当遇伞檐（指台阶顶部残留的突出岩体）、裂缝地段时，应加大距离。",{"id":6,"name":27,"category":28,"favorite":29},"一建矿业工程实务","建筑工程",0]