[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1146368":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1146368,801,1,"单选题","冬期填筑应较常温时每层铺土厚度减少（），并预留沉降层，碾压增加1-3遍。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","10%-20%",false,{"key":16,"text":17,"correct":14},"B","10%-25%",{"key":19,"text":20,"correct":21},"C","20%-25%",true,{"key":23,"text":24,"correct":14},"D","20%-30%","2020版教材页码P60-63 冬期填筑应较常温时每层铺土厚度减少20%-25%，并预留沉降层，碾压增加1-3遍。",{"id":6,"name":27,"category":28,"favorite":29},"一建矿业工程实务","建筑工程",0]