[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1146199":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1146199,801,1,"单选题","关于矿山井下平面控制测量与高程控制测量的说法，不正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","与地面控制网不同，井下主要采用导线测量的形式",false,{"key":16,"text":17,"correct":18},"B","井下施工测量同地面一样，也是先布网后施工",true,{"key":20,"text":21,"correct":14},"C","井下主要巷道敷设时，每隔1.5∽2.0km 加测一条陀螺定向边，以提供检核",{"key":23,"text":24,"correct":14},"D","井下高程控制测量与地面一样，采用水准测量或三角高程测量","井下平面控制测量主要采用导线测量的形式，且测量过程是随巷道的推进而进行。故B 不正确。",{"id":6,"name":27,"category":28,"favorite":29},"一建矿业工程实务","建筑工程",0]