[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1146158":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1146158,801,1,"单选题","防水混凝土施工期间应将地下水位降至防水工程底板垫层（）以下。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","200mm",false,{"key":16,"text":17,"correct":14},"B","300mm",{"key":19,"text":20,"correct":21},"C","500mm",true,{"key":23,"text":24,"correct":14},"D","600mm","地下水位应降至防水工程底板垫层下≥500mm。故C正确。",{"id":6,"name":27,"category":28,"favorite":29},"一建矿业工程实务","建筑工程",0]