[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":674},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,9,50,2362,[13,34,52,67,82,96,108,120,135,147,162,177,192,204,216,228,240,252,264,276,288,300,312,327,342,357,368,383,398,413,425,437,449,460,474,486,501,513,521,535,549,563,575,589,601,613,627,638,650,662],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1143725,1,"单选题","混凝土拌合必须采用机械搅拌， 正确的加料顺序为（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","粗骨料-水泥（粉煤灰）-细骨料-外加剂-水",false,{"key":24,"text":25,"correct":22},"B","粗骨料-水泥-粉煤灰-细骨料-外加剂-水",{"key":27,"text":28,"correct":29},"C","粗骨料-水泥（粉煤灰）-细骨料-水-外加剂",true,{"key":31,"text":32,"correct":22},"D","粗骨料-水泥-粉煤灰-细骨料-水-外加剂","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1143729,2,"多选题","《文明施工检查评分表》 检查评定的保证项目包括（）。",[40,42,44,46,48],{"key":20,"text":41,"correct":29},"现场围挡",{"key":24,"text":43,"correct":29},"现场防火",{"key":27,"text":45,"correct":22},"综合治理",{"key":31,"text":47,"correct":29},"材料管理",{"key":49,"text":50,"correct":22},"E","公示标牌","ABD",{"id":53,"libraryId":5,"type":36,"typeLabel":37,"stem":54,"options":55,"answer":66,"analysis":33},1143731,"按可能导致生产过程中危险和有害因素的性质进行分类， 生产过程危险和有害因素包括（）。",[56,58,60,62,64],{"key":20,"text":57,"correct":29},"人的因素",{"key":24,"text":59,"correct":22},"方法的因素",{"key":27,"text":61,"correct":29},"物的因素",{"key":31,"text":63,"correct":29},"管理因素",{"key":49,"text":65,"correct":29},"环境因素","ACDE",{"id":68,"libraryId":5,"type":36,"typeLabel":37,"stem":69,"options":70,"answer":81,"analysis":33},1143733,"拆除工程容易发生的安全事故包括（）。",[71,73,75,77,79],{"key":20,"text":72,"correct":29},"坍塌",{"key":24,"text":74,"correct":22},"触电",{"key":27,"text":76,"correct":22},"高处坠落",{"key":31,"text":78,"correct":29},"火灾",{"key":49,"text":80,"correct":29},"机械伤害","ADE",{"id":83,"libraryId":5,"type":36,"typeLabel":37,"stem":84,"options":85,"answer":66,"analysis":33},1143735,"常用的危险源识别方法包括（）。",[86,88,90,92,94],{"key":20,"text":87,"correct":29},"专家调查法",{"key":24,"text":89,"correct":22},"因果分析法",{"key":27,"text":91,"correct":29},"头脑风暴法",{"key":31,"text":93,"correct":29},"现场调查法",{"key":49,"text":95,"correct":29},"安全检查表法",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":27,"analysis":33},1143738,"吊装作业使用行灯照明时， 电压不超过（） V。",[100,102,104,106],{"key":20,"text":101,"correct":22},"12",{"key":24,"text":103,"correct":22},"24",{"key":27,"text":105,"correct":29},"36",{"key":31,"text":107,"correct":22},"48",{"id":109,"libraryId":5,"type":15,"typeLabel":16,"stem":110,"options":111,"answer":24,"analysis":33},1143740,"关于拆除作业的说法， 正确的是（）。",[112,114,116,118],{"key":20,"text":113,"correct":22},"人工拆除时，应从上至下，按板、梁、非承重墙、承重墙、柱等顺序依次进行",{"key":24,"text":115,"correct":29},"拆除应先拆除非承重结构，再拆除承重结构",{"key":27,"text":117,"correct":22},"栏杆、楼梯灯可以先行拆除",{"key":31,"text":119,"correct":22},"对只进行部分拆除的建筑，分离拆除后应及时将保留部分加固",{"id":121,"libraryId":5,"type":36,"typeLabel":37,"stem":122,"options":123,"answer":134,"analysis":33},1143742,"关于悬挑式操作平台的说法， 正确的是（）。",[124,126,128,130,132],{"key":20,"text":125,"correct":29},"操作平台的搁支点、拉结点、支撑点均应设置在主体结构上，且应可靠连接",{"key":24,"text":127,"correct":22},"悬挑式操作平台的悬挑长度不宜大于8m",{"key":27,"text":129,"correct":22},"采用斜拉方式的悬挑式操作平台，平台两侧的连接吊环应与钢丝绳连接，每一道钢丝绳应能承受操作平台的所有荷载",{"key":31,"text":131,"correct":29},"采用支撑方式的悬挑式操作平台，应在钢平台下方设置不少于两道斜撑",{"key":49,"text":133,"correct":22},"悬挑式操作平台应要保证水平","AD",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":27,"analysis":33},1143744,"某施工现场进行安全检查，《安全管理检查评分表》 得分为 80 分， 该项目在安全检查评分汇总表应得分值为 15 分； 施工现场有悬挑式脚手架、 落地式钢管脚手架两种， 得分分别为 80 分、 85 分，该项目在安全检查评分汇总表应得分为 10 分； 安全检查评分汇总表其他得分为 50 分。 该次安全检查评定等级为（）。",[139,141,143,145],{"key":20,"text":140,"correct":22},"优秀",{"key":24,"text":142,"correct":22},"良好",{"key":27,"text":144,"correct":29},"合格",{"key":31,"text":146,"correct":22},"不合格",{"id":148,"libraryId":5,"type":36,"typeLabel":37,"stem":149,"options":150,"answer":161,"analysis":33},1143746,"当因降水而危及基坑和周边环境安全时， 应采用的措施有（）。",[151,153,155,157,159],{"key":20,"text":152,"correct":29},"截水",{"key":24,"text":154,"correct":29},"回灌",{"key":27,"text":156,"correct":22},"真空井点降水",{"key":31,"text":158,"correct":22},"喷射井点降水",{"key":49,"text":160,"correct":22},"管井降水","AB",{"id":163,"libraryId":5,"type":36,"typeLabel":37,"stem":164,"options":165,"answer":176,"analysis":33},1143748,"下列关于模板工程施工安全的技术要求的说法中， 正确的有（）。",[166,168,170,172,174],{"key":20,"text":167,"correct":22},"脚手架或操作平台上临时堆放的模板不宜超过2层",{"key":24,"text":169,"correct":29},"六级以上风力时，应停止高空作业",{"key":27,"text":171,"correct":22},"同条件养护试件强度达到规定要求时，直接由技术负责人批准拆模",{"key":31,"text":173,"correct":29},"设计无要求时，模板的拆除可按先支的后拆、后支的先拆进行",{"key":49,"text":175,"correct":22},"后张法预应力混凝土结构或构件的侧模应在预应力张拉完毕拆除","BD",{"id":178,"libraryId":5,"type":36,"typeLabel":37,"stem":179,"options":180,"answer":191,"analysis":33},1143750,"关于脚手架的拆除的说法， 正确的有（）。",[181,183,185,187,189],{"key":20,"text":182,"correct":22},"应由下而上逐层进行，严禁上下同时作业",{"key":24,"text":184,"correct":22},"可以将连墙件整层拆除后再拆脚手架",{"key":27,"text":186,"correct":29},"分段拆除高差大于2步时，应增设连墙件加固",{"key":31,"text":188,"correct":22},"拆除作业应设专人指挥，严禁多人同时操作",{"key":49,"text":190,"correct":29},"拆除的构配件应采用起重设备吊运或人工传递至地面，严禁抛掷","CE",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":31,"analysis":33},1143752,"下列关于安全防护棚的搭设说法， 正确的是（）。",[196,198,200,202],{"key":20,"text":197,"correct":22},"安全防护棚为机动车辆通行时，棚底至地面高度不应小于3m",{"key":24,"text":199,"correct":22},"建筑物高度大于24m并采用木质板搭设时，应搭设双层防护棚，两层防护棚间距不小于500mm",{"key":27,"text":201,"correct":22},"防护棚的搭设应根据建筑高度确定",{"key":31,"text":203,"correct":29},"当采用厚度不小于50mm木质板搭设时，可采用单层搭设",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":20,"analysis":33},1143755,"关于交叉作业安全防护网搭设的说法， 正确的是（）。",[208,210,212,214],{"key":20,"text":209,"correct":29},"安全防护网搭设时，应每隔3m设一根支撑杆",{"key":24,"text":211,"correct":22},"支撑杆水平夹角不宜小于30°",{"key":27,"text":213,"correct":22},"安全防护网应外低里高",{"key":31,"text":215,"correct":22},"安全防护网应采用密目式安全网",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":31,"analysis":33},1143756,"塔吊的金属结构、 电气设备的外壳应有可靠的接地装置， 并且接地电阻不大于（） Ω。",[220,222,224,226],{"key":20,"text":221,"correct":22},"1",{"key":24,"text":223,"correct":22},"2",{"key":27,"text":225,"correct":22},"3",{"key":31,"text":227,"correct":29},"4",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":27,"analysis":33},1143758,"安全事故按照事故严重程度分类， 可以分为（）。",[232,234,236,238],{"key":20,"text":233,"correct":22},"一般事故、较大事故、重大事故、特别重大事故",{"key":24,"text":235,"correct":22},"一般事故、严重事故、特别严重事故",{"key":27,"text":237,"correct":29},"轻伤事故、重伤事故、死亡事故",{"key":31,"text":239,"correct":22},"一般事故、重伤事故、死亡事故",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":27,"analysis":33},1143760,"下列关于洞口作业安全防范的说法， 正确的是（）",[244,246,248,250],{"key":20,"text":245,"correct":22},"垂直洞口短边边长大于或等于500mm时，应在临空一侧设置高度不小于1.2m的防护栏杆，并采用密目式安全立网封闭即可",{"key":24,"text":247,"correct":22},"水平洞口短边边长大于或等于1500mm时，应在洞口作业侧设置高度不小于1.2m的防护栏杆，并应采用安全立网封闭",{"key":27,"text":249,"correct":29},"电梯井口应设置高度不小于1.5m的防护门，底端距地面高度不应大于50mm，并设置挡脚板",{"key":31,"text":251,"correct":22},"在电梯安装前，电梯井内应每隔3层设一道安全平网",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":24,"analysis":33},1143763,"下列关于防护栏杆的说法， 错误的是（）。",[256,258,260,262],{"key":20,"text":257,"correct":22},"应设上、下两道横杆，上杆距地面高度应为1.2m",{"key":24,"text":259,"correct":29},"当防护栏杆高度大于1.5m时，应增设横杆，横杆间距不应大于600mm",{"key":27,"text":261,"correct":22},"防护栏杆立杆的间距不应大于2m",{"key":31,"text":263,"correct":22},"挡脚板高度不应小于180mm",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":27,"analysis":33},1143765,"关于落地式操作平台的说法， 正确的是（）。",[268,270,272,274],{"key":20,"text":269,"correct":22},"操作平台的高度不应大于15m，高宽比不应大于2:1",{"key":24,"text":271,"correct":22},"操作平台从底层第一步水平杆起逐层设置连墙件，连墙件间隔不应大于3m",{"key":27,"text":273,"correct":29},"落地式操作平台拆除应由上而下逐层进行，严禁上下同时作业",{"key":31,"text":275,"correct":22},"将连墙件拆除后再拆除操作平台",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":31,"analysis":33},1143767,"施工现场应至少每旬开展一次安全检查工作， 施工现场的定期安全检查由（） 组织。",[280,282,284,286],{"key":20,"text":281,"correct":22},"专职安全员",{"key":24,"text":283,"correct":22},"项目安全总监",{"key":27,"text":285,"correct":22},"项目技术负责人",{"key":31,"text":287,"correct":29},"项目经理",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":24,"analysis":33},1143769,"当高层建筑的玻璃幕墙安装与主体结构施工交叉作业时， 在主体结构的施工层下应设置防护网； 在距离地面约（ ） 高度处， 应设置挑出宽度不小于（ ） 的水平防护网",[292,294,296,298],{"key":20,"text":293,"correct":22},"3m，5m",{"key":24,"text":295,"correct":29},"3m，6m",{"key":27,"text":297,"correct":22},"4m，5m",{"key":31,"text":299,"correct":22},"4m，6m",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":31,"analysis":33},1143771,"建筑施工企业在安全管理中必须坚持的安全管理方针为（）。",[304,306,308,310],{"key":20,"text":305,"correct":22},"安全第一，预防为主",{"key":24,"text":307,"correct":22},"安全第一，预防为主，防消结合",{"key":27,"text":309,"correct":22},"安全第一，预防为主，防治结合",{"key":31,"text":311,"correct":29},"安全第一，预防为主，综合治理",{"id":313,"libraryId":5,"type":36,"typeLabel":37,"stem":314,"options":315,"answer":326,"analysis":33},1143773,"《安全管理检查评分表》 检查评定的保证项目包括（）。",[316,318,320,322,324],{"key":20,"text":317,"correct":29},"安全生产责任制",{"key":24,"text":319,"correct":29},"安全技术交底",{"key":27,"text":321,"correct":22},"生产安全事故处理",{"key":31,"text":323,"correct":29},"安全教育",{"key":49,"text":325,"correct":29},"应急救援","ABDE",{"id":328,"libraryId":5,"type":36,"typeLabel":37,"stem":329,"options":330,"answer":341,"analysis":33},1143775,"施工现场安全检查后应对隐患整改情况进行跟踪复查， 查被检单位是否按（） 原则落实整改。",[331,333,335,337,339],{"key":20,"text":332,"correct":29},"定人",{"key":24,"text":334,"correct":29},"定期限",{"key":27,"text":336,"correct":29},"定措施",{"key":31,"text":338,"correct":22},"定经费",{"key":49,"text":340,"correct":22},"定组织","ABC",{"id":343,"libraryId":5,"type":36,"typeLabel":37,"stem":344,"options":345,"answer":356,"analysis":33},1143777,"建筑工程安全检查在正确使用安全检查表的基础上， 可以采用（） 等方法进行。",[346,348,350,352,354],{"key":20,"text":347,"correct":29},"看",{"key":24,"text":349,"correct":29},"量",{"key":27,"text":351,"correct":22},"敲",{"key":31,"text":353,"correct":22},"摸",{"key":49,"text":355,"correct":29},"问","ABE",{"id":358,"libraryId":5,"type":36,"typeLabel":37,"stem":359,"options":360,"answer":66,"analysis":33},1143779,"建筑业最常发生的事故包括（）。",[361,362,364,365,367],{"key":20,"text":76,"correct":29},{"key":24,"text":363,"correct":22},"起重伤害",{"key":27,"text":80,"correct":29},{"key":31,"text":366,"correct":29},"物体打击",{"key":49,"text":74,"correct":29},{"id":369,"libraryId":5,"type":36,"typeLabel":37,"stem":370,"options":371,"answer":382,"analysis":33},1143782,"下列关于操作平台的说法， 正确的有（）。",[372,374,376,378,380],{"key":20,"text":373,"correct":29},"操作平台应通过设计计算，并应编制专项方案",{"key":24,"text":375,"correct":22},"操作平台使用中应每季度进行一次定期检查",{"key":27,"text":377,"correct":22},"移动式操作平台与落地式操作平台的高宽比均不应大于3:1",{"key":31,"text":379,"correct":22},"移动式操作平台带人移动时，应缓慢移动",{"key":49,"text":381,"correct":29},"落地式操作平台停用超过1个月，恢复使用前应进行检查","AE",{"id":384,"libraryId":5,"type":36,"typeLabel":37,"stem":385,"options":386,"answer":397,"analysis":33},1143784,"下列关于基坑（槽） 土方开挖与回填安全技术措施的说法中， 正确的有（）。",[387,389,391,393,395],{"key":20,"text":388,"correct":29},"基坑槽开挖时，两人操作间距应大于2.5m",{"key":24,"text":390,"correct":22},"挖土机间距应大于8m",{"key":27,"text":392,"correct":29},"当土质良好时，在坑边堆放弃土、材料要距坑边1m以外，堆放高度不能超过1.5m",{"key":31,"text":394,"correct":22},"在拆除护壁支撑时，应从上而下拆除",{"key":49,"text":396,"correct":29},"更换护壁支撑时，应先安装新的再拆除旧的","ACE",{"id":399,"libraryId":5,"type":36,"typeLabel":37,"stem":400,"options":401,"answer":412,"analysis":33},1143786,"下列关于脚手架的搭设， 说法正确的有（）。",[402,404,406,408,410],{"key":20,"text":403,"correct":29},"立杆底部应设置垫板，垫板应采用长度不少于2跨、厚度不小于50mm、宽度不小于200mm的木垫板",{"key":24,"text":405,"correct":22},"纵向水平杆应设置在立杆外侧，长度不应小于3跨",{"key":27,"text":407,"correct":29},"水平杆对接接头中心至最近主节点的距离不应大于纵距的1\u002F3",{"key":31,"text":409,"correct":29},"立杆的接长可以采用搭接",{"key":49,"text":411,"correct":22},"高度24m以下的脚手架可以采用只有钢筋的柔性连墙件","ACD",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":27,"analysis":33},1143788,"属于全面性、 考核性的检查形式是（）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"日常巡查",{"key":24,"text":420,"correct":22},"专项检查",{"key":27,"text":422,"correct":29},"定期安全检查",{"key":31,"text":424,"correct":22},"专业性安全检查",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":31,"analysis":33},1143794,"下列关于临边作业安全防范措施的说法， 正确的是（）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"外设楼梯口、楼梯平台，只需安装防护栏杆",{"key":24,"text":432,"correct":22},"有外脚手架的建筑物的外围边沿外，应采用密目式安全网封闭，且应设置脚手架内侧立杆上",{"key":27,"text":434,"correct":22},"施工升降机在建筑物间设置的停层平台两侧边，可仅设置防护栏杆和密目式安全立网",{"key":31,"text":436,"correct":29},"施工升降机在建筑物间设置的停层平台口应设置高度不低于1.8m的楼层防护门，并应设置防外开装置",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":31,"analysis":33},1143796,"关于单位工程质量验收组织的说法， 正确的是（）。",[441,443,445,447],{"key":20,"text":442,"correct":22},"单位工程中分包工程验收时，总包单位无需派人参加",{"key":24,"text":444,"correct":22},"应由专业监理工程师组织单位工程竣工预验收",{"key":27,"text":446,"correct":22},"预验收通过后，施工单位应向监理单位提交工程竣工报告，申请竣工验收",{"key":31,"text":448,"correct":29},"单位工程中有分包工程时，分包单位负责人也应参加单位工程竣工验收",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":20,"analysis":33},1143798,"基础工验收前（） 个工作日通知质量监督站。",[453,454,456,458],{"key":20,"text":225,"correct":29},{"key":24,"text":455,"correct":22},"5",{"key":27,"text":457,"correct":22},"7",{"key":31,"text":459,"correct":22},"15",{"id":461,"libraryId":5,"type":36,"typeLabel":37,"stem":462,"options":463,"answer":191,"analysis":33},1143801,"施工单位工程资料归档保存期限应满足（） 的需要。",[464,466,468,470,472],{"key":20,"text":465,"correct":22},"修缮",{"key":24,"text":467,"correct":22},"维护",{"key":27,"text":469,"correct":29},"质量追溯",{"key":31,"text":471,"correct":22},"加固",{"key":49,"text":473,"correct":29},"质量保修",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},1143803,"下列人员中， 可不参与主体结构工程验收的是（）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"施工单位技术负责人",{"key":24,"text":481,"correct":29},"勘察单位项目负责人",{"key":27,"text":483,"correct":22},"施工单位项目负责人",{"key":31,"text":485,"correct":22},"总监理工程师",{"id":487,"libraryId":5,"type":36,"typeLabel":37,"stem":488,"options":489,"answer":500,"analysis":33},1143805,"当建筑工程质量不符合要求时， 下列有关验收的说法， 正确的有（）。",[490,492,494,496,498],{"key":20,"text":491,"correct":29},"经返工重做或更换器具、设备的检验批，应重新进行验收",{"key":24,"text":493,"correct":29},"经有资质的检测机构检测鉴定能够达到设计要求的检验批，应给予验收",{"key":27,"text":495,"correct":29},"经有资质的检测机构鉴定到不到设计要求、但经原设计单位核算认可能够满足结构安全和使用功能的检验批，可予以验收",{"key":31,"text":497,"correct":22},"经返修或加固处理的分项、分部工程，改变了外形尺寸，严禁验收",{"key":49,"text":499,"correct":29},"经过返修或加固处理仍不能满足安全使用要求的分部工程、单位（子单位）工程，严禁验收","ABCE",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},1143807,"工程资料的归档保存期限应符合国家现行有关标准的规定， 当无规定时， 不宜少于（）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"2年",{"key":24,"text":508,"correct":29},"5年",{"key":27,"text":510,"correct":22},"20年",{"key":31,"text":512,"correct":22},"设计文件规定的使用寿命",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},1143809,"地基基础工程验收通过后， 参建责任方签署地基与基础验收质量记录， 应在签字盖章后（） 个工作日内由项目监理人员报送质监站存档。",[517,518,519,520],{"key":20,"text":225,"correct":29},{"key":24,"text":455,"correct":22},{"key":27,"text":457,"correct":22},{"key":31,"text":459,"correct":22},{"id":522,"libraryId":5,"type":36,"typeLabel":37,"stem":523,"options":524,"answer":66,"analysis":33},1143811,"关于建筑工程档案整理的说法， 错误的有（）。",[525,527,529,531,533],{"key":20,"text":526,"correct":29},"工程资料应为原件，当为复印件时，应加盖公司公章并注明原件存放处",{"key":24,"text":528,"correct":22},"专业承包工程形成的施工资料应由专业承包单位负责，并应单独组卷，直接向施工总承包单位移交",{"key":27,"text":530,"correct":29},"不同型号的电梯应统一组卷",{"key":31,"text":532,"correct":29},"室外工程应和主体工程资料统一组卷",{"key":49,"text":534,"correct":29},"应按单项工程进行组卷",{"id":536,"libraryId":5,"type":36,"typeLabel":37,"stem":537,"options":538,"answer":341,"analysis":33},1143813,"建筑工程分部工程质量验收合格的规定有（）。",[539,541,543,545,547],{"key":20,"text":540,"correct":29},"分部工程所含分项工程的质量均应验收合格",{"key":24,"text":542,"correct":29},"质量控制资料应完整",{"key":27,"text":544,"correct":29},"观感质量验收应符合要求",{"key":31,"text":546,"correct":22},"主要使用功能项目的抽样检验结果应符合相关专业质量验收规范的规定",{"key":49,"text":548,"correct":22},"有关安全、节能、环境保护和主要使用功能的检验资料应完整",{"id":550,"libraryId":5,"type":36,"typeLabel":37,"stem":551,"options":552,"answer":51,"analysis":33},1143816,"门窗工程有关安全和功能检测项目包括（）。",[553,555,557,559,561],{"key":20,"text":554,"correct":29},"气密性能",{"key":24,"text":556,"correct":29},"抗风压性能",{"key":27,"text":558,"correct":22},"结构胶的相容性试验",{"key":31,"text":560,"correct":29},"水密性能",{"key":49,"text":562,"correct":22},"层间变形性能",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":27,"analysis":33},1143818,"根据《建设工程施工合同（示范文本）》 规定， 下列组成合同的各项文件的优先解释顺序正确的是（）。",[567,569,571,573],{"key":20,"text":568,"correct":22},"专用合同条款-通用合同条款-图纸-技术标准和要求-已标价工程量清单或预算书",{"key":24,"text":570,"correct":22},"通用合同条款-专用合同条款-技术标准和要求-图纸-已标价工程量清单或预算书",{"key":27,"text":572,"correct":29},"专用合同条款-通用合同条款-技术标准和要求-图纸-已标价工程量清单或预算书",{"key":31,"text":574,"correct":22},"通用合同条款-专用合同条款-图纸-技术标准和要求-已标价工程量清单或预算书",{"id":576,"libraryId":5,"type":36,"typeLabel":37,"stem":577,"options":578,"answer":326,"analysis":33},1143820,"下列属于规费的是（）。",[579,581,583,585,587],{"key":20,"text":580,"correct":29},"危险作业意外伤害保险",{"key":24,"text":582,"correct":29},"工程定额测定费",{"key":27,"text":584,"correct":22},"财产保险费",{"key":31,"text":586,"correct":29},"住房公积金",{"key":49,"text":588,"correct":29},"社会保障费",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":27,"analysis":33},1143822,"当业主指定分包商时，（） 应对分包商的资质及能力进行预审。",[593,595,597,599],{"key":20,"text":594,"correct":22},"监理人",{"key":24,"text":596,"correct":22},"业主",{"key":27,"text":598,"correct":29},"承包人",{"key":31,"text":600,"correct":22},"建设行政主管部门",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":31,"analysis":33},1143824,"下列合同类型中， 适用于灾后重建或对施工内容、 经济指标不确定的工程项目的是（ ）。",[605,607,609,611],{"key":20,"text":606,"correct":22},"固定总价合同",{"key":24,"text":608,"correct":22},"固定单价合同",{"key":27,"text":610,"correct":22},"变动单价合同",{"key":31,"text":612,"correct":29},"成本加酬金合同",{"id":614,"libraryId":5,"type":36,"typeLabel":37,"stem":615,"options":616,"answer":500,"analysis":33},1143826,"安全文明施工费包括（）。",[617,619,621,623,625],{"key":20,"text":618,"correct":29},"环境保护费",{"key":24,"text":620,"correct":29},"文明施工费",{"key":27,"text":622,"correct":29},"临时设施费",{"key":31,"text":624,"correct":22},"夜间施工费",{"key":49,"text":626,"correct":29},"安全施工费",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":27,"analysis":33},1143828,"成套设备的保修应由（） 负责。",[631,633,634,636],{"key":20,"text":632,"correct":22},"发包人",{"key":24,"text":598,"correct":22},{"key":27,"text":635,"correct":29},"供应方",{"key":31,"text":637,"correct":22},"设备制造企业",{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":31,"analysis":33},1143830,"根据《建设工程工程量清单计价规范》 (GB50500-2013)， 投标时不能作为竞争性费用的是（）。",[642,644,646,648],{"key":20,"text":643,"correct":22},"夜间施工增加费",{"key":24,"text":645,"correct":22},"冬雨季施工增加费",{"key":27,"text":647,"correct":22},"已完工程保护费",{"key":31,"text":649,"correct":29},"安全文明施工费",{"id":651,"libraryId":5,"type":15,"typeLabel":16,"stem":652,"options":653,"answer":31,"analysis":33},1143832,"根据《建设工程工程量清单计价规范》 (GB50500-2013)， 在施工中因发包人原因导致工期延误的， 计划进度日期后续工程的价格调整原则是（）。",[654,656,658,660],{"key":20,"text":655,"correct":22},"应采用造价信息差额调整法",{"key":24,"text":657,"correct":22},"采用计划进度日期与实际进度日期两者的较低者",{"key":27,"text":659,"correct":22},"如果没有超过15%，则不做调整",{"key":31,"text":661,"correct":29},"采用计划进度日期与实际进度日期两者的较高者",{"id":663,"libraryId":5,"type":15,"typeLabel":16,"stem":664,"options":665,"answer":20,"analysis":33},1143834,"根据《建设工程工程量清单计价规范》， 某工程实行单价合同， 在执行过程中， 某分项工程原清单工程量为 1000m3， 综合单价为 25 元\u002Fm3， 后因业主原因实际工程量变更为 1500m3， 合同中约定：若实际工程量超过计划工程量 15%以上， 超过部分综合单价调整为原来的 0.9。 不考虑其他因素，则该分项工程的结算款应为（） 元。",[666,668,670,672],{"key":20,"text":667,"correct":29},"36625",{"key":24,"text":669,"correct":22},"35000",{"key":27,"text":671,"correct":22},"33750",{"key":31,"text":673,"correct":22},"32875",[675,678,681,684,687,690],{"id":15,"name":676,"category":7,"favorite":677},"领导干部任职前廉政法规知识测试题",92,{"id":679,"name":680,"category":7,"favorite":15},595,"建筑结构与设备",{"id":682,"name":683,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":685,"name":686,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":688,"name":689,"category":7,"favorite":8},534,"BIM工程师",{"id":691,"name":689,"category":7,"favorite":8},535]