[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":672},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,8,50,2362,[13,34,46,58,70,88,103,117,132,144,159,171,183,195,207,218,233,245,260,272,284,296,308,320,335,350,361,376,388,403,415,429,443,455,467,478,490,504,516,528,542,556,570,579,590,604,617,632,644,657],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1143616,1,"单选题","一般情况下， 框架剪力墙结构整个建筑的全部剪力墙至少承受（ ） 的水平荷载",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","60%",false,{"key":24,"text":25,"correct":22},"B","70%",{"key":27,"text":28,"correct":29},"C","80%",true,{"key":31,"text":32,"correct":22},"D","90%","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1143622,"建筑工程施工现场检测试验技术管理的正确程序为（）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"制订检测试验计划-制取试样-登记台账-送检-检测试验-检测试验报告管理",{"key":24,"text":41,"correct":22},"制取试样-制订检测试验计划-登记台账-送检-检测试验-检测试验报告管理",{"key":27,"text":43,"correct":22},"制订检测试验计划-制取试样-送检-检测试验-登记台账-检测试验报告管理",{"key":31,"text":45,"correct":22},"制取试样-制订检测试验计划-送检-检测试验-登记台账-检测试验报告管理",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1143624,"绿色建筑的设计评价应在（） 进行。",[50,52,54,56],{"key":20,"text":51,"correct":22},"建筑工程施工图设计文件编制完成后",{"key":24,"text":53,"correct":29},"建筑工程施工图设计文件审查通过后",{"key":27,"text":55,"correct":22},"建筑通过竣工验收后",{"key":31,"text":57,"correct":22},"建筑通过竣工验收并投入使用一年后",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1143625,"二级动火应由（） 组织拟定防火安全技术措施。",[62,64,66,68],{"key":20,"text":63,"correct":22},"项目安全管理部门",{"key":24,"text":65,"correct":29},"项目责任工程师",{"key":27,"text":67,"correct":22},"施工单位技术负责人",{"key":31,"text":69,"correct":22},"项目负责人",{"id":71,"libraryId":5,"type":72,"typeLabel":73,"stem":74,"options":75,"answer":87,"analysis":33},1143628,2,"多选题","关于存放易燃材料仓库的防火要求的说法， 正确的有（）。",[76,78,80,82,84],{"key":20,"text":77,"correct":22},"易燃材料仓库应设在上风地带",{"key":24,"text":79,"correct":29},"有明火的生活用房与易燃材料之间至少保持30m的防火间距，有飞火的烟囱应布置在仓库的下风地带",{"key":27,"text":81,"correct":22},"易燃易爆危险品库房单个房间的建筑面积不应超过30㎡",{"key":31,"text":83,"correct":29},"易燃材料露天仓库四周应有宽度不小于6m的平坦空地作为消防通道",{"key":85,"text":86,"correct":22},"E","贮量大的易燃材料参考，应设置两个以上大门，门的净宽度不应小于1m","BD",{"id":89,"libraryId":5,"type":72,"typeLabel":73,"stem":90,"options":91,"answer":102,"analysis":33},1143630,"关于混凝土工程冬期施工的说法， 正确的有（）。",[92,94,96,98,100],{"key":20,"text":93,"correct":22},"可加热矿物掺合料以满足热工计算要求",{"key":24,"text":95,"correct":29},"预拌混凝土或远距离输送的混凝土，拌合物的出机温度不宜低于15℃",{"key":27,"text":97,"correct":29},"混凝土入模温度不应低于5℃",{"key":31,"text":99,"correct":22},"在混凝土养护和越冬期间，可以采用浇水养护",{"key":85,"text":101,"correct":29},"应增设2组与结构同条件养护试件","BCE",{"id":104,"libraryId":5,"type":72,"typeLabel":73,"stem":105,"options":106,"answer":102,"analysis":33},1143632,"关于现场宿舍管理的说法， 正确的有（）。",[107,109,111,113,115],{"key":20,"text":108,"correct":22},"现场宿舍应设置封闭式窗户",{"key":24,"text":110,"correct":29},"宿舍内的床铺不得超过2层",{"key":27,"text":112,"correct":29},"不得在建筑工程内设置宿舍",{"key":31,"text":114,"correct":22},"施工区、办公区、生活区均需单独设置",{"key":85,"text":116,"correct":29},"每间居住人员不得超过16人",{"id":118,"libraryId":5,"type":72,"typeLabel":73,"stem":119,"options":120,"answer":131,"analysis":33},1143634,"建筑信息模型（BIM） 的应用应包括（） 等的施工全过程。",[121,123,125,127,129],{"key":20,"text":122,"correct":22},"规划",{"key":24,"text":124,"correct":29},"深化设计",{"key":27,"text":126,"correct":29},"施工实施",{"key":31,"text":128,"correct":29},"竣工验收",{"key":85,"text":130,"correct":22},"运行","BCD",{"id":133,"libraryId":5,"type":15,"typeLabel":16,"stem":134,"options":135,"answer":27,"analysis":33},1143637,"建筑业新技术应用示范工程是指推广应用（） 项及以上《建筑物 10 项新技术》 中推荐的建筑新技术的工程。",[136,138,140,142],{"key":20,"text":137,"correct":22},"4",{"key":24,"text":139,"correct":22},"5",{"key":27,"text":141,"correct":29},"6",{"key":31,"text":143,"correct":22},"8",{"id":145,"libraryId":5,"type":72,"typeLabel":73,"stem":146,"options":147,"answer":158,"analysis":33},1143639,"绿色建筑设计评价的指标包括（）。",[148,150,152,154,156],{"key":20,"text":149,"correct":29},"节地与室外环境",{"key":24,"text":151,"correct":29},"节水与水资源利用",{"key":27,"text":153,"correct":29},"室内环境质量",{"key":31,"text":155,"correct":22},"施工管理",{"key":85,"text":157,"correct":29},"节能与能源利用","ABCE",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":24,"analysis":33},1143641,"施工现场临时配电系统中， 零线（N） 的配线颜色宜用（）。",[163,165,167,169],{"key":20,"text":164,"correct":22},"黄色",{"key":24,"text":166,"correct":29},"蓝色",{"key":27,"text":168,"correct":22},"绿色",{"key":31,"text":170,"correct":22},"黄绿双色",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":27,"analysis":33},1143643,"施工现场应建立健全检测试验管理制度， 应由（） 负责组织检查检测试验管理制度执行情况。",[175,177,179,181],{"key":20,"text":176,"correct":22},"建设单位项目负责人",{"key":24,"text":178,"correct":22},"总监理工程",{"key":27,"text":180,"correct":29},"施工单位项目技术负责人",{"key":31,"text":182,"correct":22},"监理工程师",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":31,"analysis":33},1143645,"市区主要路段的围挡高度不得低于（） m。",[187,189,191,193],{"key":20,"text":188,"correct":22},"1.5",{"key":24,"text":190,"correct":22},"1.8",{"key":27,"text":192,"correct":22},"2.0",{"key":31,"text":194,"correct":29},"2.5",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":31,"analysis":33},1143647,"下列关于临时用电管理的说法， 正确的是（）。",[199,201,203,205],{"key":20,"text":200,"correct":22},"施工现场临时用电设备在5台及以上或设备总容量在50kW以上的，应制定安全用电和电气防火措施",{"key":24,"text":202,"correct":22},"临时用电组织设计应由项目负责人指定专人编制",{"key":27,"text":204,"correct":22},"室内220V灯具距地面不得低于3m",{"key":31,"text":206,"correct":29},"黄\u002F绿双色线必须用作PE线",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":27,"analysis":33},1143649,"在城市市区范围内从事建筑工程施工， 项目必须向政府环境保护行政主管部门申报登记的时间是在工程开工前（） d。",[211,212,214,216],{"key":20,"text":139,"correct":22},{"key":24,"text":213,"correct":22},"7",{"key":27,"text":215,"correct":29},"15",{"key":31,"text":217,"correct":22},"30",{"id":219,"libraryId":5,"type":72,"typeLabel":73,"stem":220,"options":221,"answer":232,"analysis":33},1143651,"在下列情况的动火中， 属于一级动火的有（）。",[222,224,226,228,230],{"key":20,"text":223,"correct":29},"禁火区域内",{"key":24,"text":225,"correct":29},"储存过可燃液体的容器",{"key":27,"text":227,"correct":22},"登高焊、割等用火作业",{"key":31,"text":229,"correct":29},"比较密封的室内",{"key":85,"text":231,"correct":22},"在具有一定危险因素的非禁火区域内进行临时焊、割等用火作业","ABD",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":27,"analysis":33},1143653,"下列施工场所中， 照明电压不得超过 12V 的是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"地下车库",{"key":24,"text":240,"correct":22},"潮湿场所",{"key":27,"text":242,"correct":29},"金属容器内",{"key":31,"text":244,"correct":22},"人防工程",{"id":246,"libraryId":5,"type":72,"typeLabel":73,"stem":247,"options":248,"answer":259,"analysis":33},1143655,"“四节一环保” 的“四节” 具体指（）。",[249,251,253,255,257],{"key":20,"text":250,"correct":29},"节能",{"key":24,"text":252,"correct":29},"节水",{"key":27,"text":254,"correct":22},"节电",{"key":31,"text":256,"correct":29},"节材",{"key":85,"text":258,"correct":29},"节地","ABDE",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},1143657,"某居住建筑进行绿色建筑运行评价时， 控制性均满足要求， 没有加分项， 评分项得分情况如下表所示。 则该居住建筑绿色建筑等级为（）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"一星级",{"key":24,"text":267,"correct":29},"二星级",{"key":27,"text":269,"correct":22},"三星级",{"key":31,"text":271,"correct":22},"四星级",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":24,"analysis":33},1143659,"关于现场食堂卫生与防疫管理的说法， 正确的有（）。",[276,278,280,282],{"key":20,"text":277,"correct":22},"现场食堂的制作间灶台及其周边应铺贴不低于1.2m的瓷砖",{"key":24,"text":279,"correct":29},"现场食堂储藏室的粮食存放台距离墙和地面应大于0.2m",{"key":27,"text":281,"correct":22},"粮食可以存放在制作间",{"key":31,"text":283,"correct":22},"燃气罐可以存放在粮食储藏间",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},1143661,"施工现场发生法定传染病、 食物中毒或急性工业中毒时， 必须在（） h 内向所在地建设行政主管部门和有关部门报告。",[288,290,292,294],{"key":20,"text":289,"correct":22},"1",{"key":24,"text":291,"correct":29},"2",{"key":27,"text":293,"correct":22},"12",{"key":31,"text":295,"correct":22},"24",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":27,"analysis":33},1143663,"下列关于绿色施工技术要求说法中， 正确的是（）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"现场照明设计以满足最低照度为原则，照度不应超过最低照度",{"key":24,"text":303,"correct":22},"临时设计的占地面积应按用地指标所需的最高面积设计",{"key":27,"text":305,"correct":29},"现场临时设施占地面积有效利用率大于90%",{"key":31,"text":307,"correct":22},"施工现场内形成线型通路，减少道路占用土地",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},1143666,"下列关于节水与水资源利用的技术要求的说法， 正确的是（）。",[312,314,316,318],{"key":20,"text":313,"correct":22},"对生活用水与工程用水确定用水定额指标，并进行统一计量管理",{"key":24,"text":315,"correct":22},"现场机具、设备、车辆冲洗、绿化浇灌等用水，宜采用自来水",{"key":27,"text":317,"correct":22},"力争施工中非传统水源和循环水的再利用量大于50%",{"key":31,"text":319,"correct":29},"当基坑抽水量大于50万m3时，应进行地下水回灌",{"id":321,"libraryId":5,"type":72,"typeLabel":73,"stem":322,"options":323,"answer":334,"analysis":33},1143668,"关于氧气瓶、 乙炔瓶的说法中， 正确的有（）。",[324,326,328,330,332],{"key":20,"text":325,"correct":22},"氧气瓶、乙炔瓶的存放间距不小于5m",{"key":24,"text":327,"correct":22},"氧气瓶、乙炔瓶的工作间距不小于10m",{"key":27,"text":329,"correct":29},"氧气瓶、乙炔瓶与明火作业间距不小于10m",{"key":31,"text":331,"correct":22},"建筑工程内存放氧气瓶、乙炔瓶必须要保证安全、可靠",{"key":85,"text":333,"correct":29},"氧气瓶、乙炔瓶与易燃易爆物品的距离不得少于30m","CE",{"id":336,"libraryId":5,"type":72,"typeLabel":73,"stem":337,"options":338,"answer":349,"analysis":33},1143670,"可导致接触性皮炎的作业活动有（）。",[339,341,343,345,347],{"key":20,"text":340,"correct":29},"油漆作业",{"key":24,"text":342,"correct":22},"电焊作业",{"key":27,"text":344,"correct":29},"混凝土搅拌机械作业",{"key":31,"text":346,"correct":22},"防水作业",{"key":85,"text":348,"correct":29},"防腐作业","ACE",{"id":351,"libraryId":5,"type":72,"typeLabel":73,"stem":352,"options":353,"answer":360,"analysis":33},1143672,"可导致苯中毒的作业活动有（）。",[354,355,356,358,359],{"key":20,"text":340,"correct":29},{"key":24,"text":342,"correct":22},{"key":27,"text":357,"correct":22},"风镐作业",{"key":31,"text":346,"correct":22},{"key":85,"text":348,"correct":29},"AE",{"id":362,"libraryId":5,"type":72,"typeLabel":73,"stem":363,"options":364,"answer":375,"analysis":33},1143674,"气焊作业可导致的职业病有（）。",[365,367,369,371,373],{"key":20,"text":366,"correct":29},"电焊尘肺",{"key":24,"text":368,"correct":29},"一氧化碳中毒",{"key":27,"text":370,"correct":29},"氮氧化合物中毒",{"key":31,"text":372,"correct":22},"电光性眼炎",{"key":85,"text":374,"correct":22},"电光性皮炎","ABC",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},1143677,"钢筋采用机械连接时， 需要进行现场检测试验的主要参数是（）。",[380,382,384,386],{"key":20,"text":381,"correct":29},"抗拉强度",{"key":24,"text":383,"correct":22},"弯曲性能",{"key":27,"text":385,"correct":22},"抗剪力",{"key":31,"text":387,"correct":22},"屈服强度",{"id":389,"libraryId":5,"type":72,"typeLabel":73,"stem":390,"options":391,"answer":402,"analysis":33},1143679,"下列关于灭火器设置的说法， 正确的有（）。",[392,394,396,398,400],{"key":20,"text":393,"correct":29},"灭火器应设置在明显的位置且铭牌必须朝外",{"key":24,"text":395,"correct":22},"手提式灭火器底部离地面高度应小于1.5m",{"key":27,"text":397,"correct":22},"手提式禁止直接放置在地面上",{"key":31,"text":399,"correct":29},"手提式灭火器可直接放在消防箱的底面上，但消防箱离地面的高度不宜小于0.15m",{"key":85,"text":401,"correct":22},"从灭火器采购日期算起，达到灭火器报废年限的，必须强制报废","AD",{"id":404,"libraryId":5,"type":72,"typeLabel":73,"stem":405,"options":406,"answer":87,"analysis":33},1143681,"下列关于消防器材的配备的说法， 正确的有（）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"临时搭设的建筑物区域内每50㎡配备1只10L灭火器",{"key":24,"text":410,"correct":29},"消火栓距离拟建工程不小于5m且不宜大于25m",{"key":27,"text":412,"correct":22},"施工现场应由足够的消防水源，进水口一般不应少于1处",{"key":31,"text":414,"correct":29},"消火栓之间的距离不应大于120m",{"id":416,"libraryId":5,"type":72,"typeLabel":73,"stem":417,"options":418,"answer":232,"analysis":33},1143683,"关于施工总平面图设计要点的说法中， 正确的有（）。",[419,421,423,425,427],{"key":20,"text":420,"correct":29},"现场宜考虑设置两个以上大门",{"key":24,"text":422,"correct":29},"存放危险品类的仓库距离在建工程的距离应不小于15m",{"key":27,"text":424,"correct":22},"主干道宽度不小于6m，载重车转弯半径不宜小于12m",{"key":31,"text":426,"correct":29},"临时总变电站应设在高压线进入工地最近处",{"key":85,"text":428,"correct":22},"供电线路应与其他管道设在道路同一侧",{"id":430,"libraryId":5,"type":72,"typeLabel":73,"stem":431,"options":432,"answer":442,"analysis":33},1143685,"在施工现场的下列场所中， 可以使用 36v 电压照明的有（）。",[433,434,436,438,440],{"key":20,"text":244,"correct":29},{"key":24,"text":435,"correct":22},"锅炉内",{"key":27,"text":437,"correct":22},"特别潮湿环境",{"key":31,"text":439,"correct":29},"照明灯具离地高度2.0m的房间",{"key":85,"text":441,"correct":29},"有导电灰尘环境","ADE",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},1143687,"关于外墙外保温 EPS 板冬期施工的说法， 正确的是（）。",[447,449,451,453],{"key":20,"text":448,"correct":22},"冬期施工最低温度不应低于5℃",{"key":24,"text":450,"correct":29},"外墙外保温施工期间及完工24h内，基层及环境空气温度不应低于5℃",{"key":27,"text":452,"correct":22},"EPS板胶粘剂和聚合物抹面胶浆每隔15分钟搅拌一次，30min内使用完毕",{"key":31,"text":454,"correct":22},"EPS板粘贴应保证有效粘贴面积大于80%",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":31,"analysis":33},1143689,"关于砌筑工程冬期施工的说法中， 正确的是（）。",[459,461,463,465],{"key":20,"text":460,"correct":22},"现场拌制砂浆所用砂中不得含有直径大于20mm的冻结块或冰块",{"key":24,"text":462,"correct":22},"砌筑施工时，砂浆温度不应低于0℃",{"key":27,"text":464,"correct":22},"砌体采用氯盐砂浆施工时，每日砌筑高度不宜超过1.5m",{"key":31,"text":466,"correct":29},"应增加一组与砌体同条件养护的试块",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":24,"analysis":33},1143691,"配合比设计为 C50P8 的混凝土， 冬期施工时临界强度不宜小于（） MPa。",[471,472,474,476],{"key":20,"text":215,"correct":22},{"key":24,"text":473,"correct":29},"25",{"key":27,"text":475,"correct":22},"40",{"key":31,"text":477,"correct":22},"50",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},1143693,"建筑工程施工现场检测试验的组织和实施应由（） 负责。",[482,484,486,488],{"key":20,"text":483,"correct":22},"建设单位",{"key":24,"text":485,"correct":29},"施工单位",{"key":27,"text":487,"correct":22},"监理单位",{"key":31,"text":489,"correct":22},"质量监督机构",{"id":491,"libraryId":5,"type":72,"typeLabel":73,"stem":492,"options":493,"answer":232,"analysis":33},1143695,"关于高温天气混凝土施工的说法， 错误的有（）。",[494,496,498,500,502],{"key":20,"text":495,"correct":29},"宜在午间进行浇筑",{"key":24,"text":497,"correct":29},"混凝土拌合物出机不宜大于35℃",{"key":27,"text":499,"correct":22},"应及时进行保湿养护",{"key":31,"text":501,"correct":29},"可采取通风、遮阳、喷雾等措施",{"key":85,"text":503,"correct":22},"宜用白色涂装混凝土运输车",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":31,"analysis":33},1143697,"下列关于三级配电系统的设置说法， 正确的是（）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"可以用同一开关箱直接控制两个以上插座",{"key":24,"text":511,"correct":22},"固定式配电箱、开关箱的中心点与地面的垂直距离应为0.8~1.6",{"key":27,"text":513,"correct":22},"移动式配电箱、开关箱的中心点与地面的垂直距离宜为1.4~1.6",{"key":31,"text":515,"correct":29},"总配电箱应设置在靠近进场电源的区域",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":31,"analysis":33},1143699,"关于异节奏流水施工特点的说法， 正确的是（）。",[520,522,524,526],{"key":20,"text":521,"correct":22},"流水步距等于流水节拍",{"key":24,"text":523,"correct":22},"专业工作队数目大于施工过程数目",{"key":27,"text":525,"correct":22},"所有施工过程在各施工段上的流水节拍均相等",{"key":31,"text":527,"correct":29},"同一施工过程在不同施工段上的流水节拍均相等",{"id":529,"libraryId":5,"type":72,"typeLabel":73,"stem":530,"options":531,"answer":259,"analysis":33},1143701,"进度计划调整的方法包括（）。",[532,534,536,538,540],{"key":20,"text":533,"correct":29},"关键工作的调整",{"key":24,"text":535,"correct":29},"改变某些工作间的逻辑关系",{"key":27,"text":537,"correct":22},"工期的调整",{"key":31,"text":539,"correct":29},"剩余工作重新编制进度计划",{"key":85,"text":541,"correct":29},"资源调整",{"id":543,"libraryId":5,"type":72,"typeLabel":73,"stem":544,"options":545,"answer":402,"analysis":33},1143703,"下列流水施工参数中， 属于工艺参数的有（）。",[546,548,550,552,554],{"key":20,"text":547,"correct":29},"施工过程",{"key":24,"text":549,"correct":22},"流水步距",{"key":27,"text":551,"correct":22},"施工段",{"key":31,"text":553,"correct":29},"流水强度",{"key":85,"text":555,"correct":22},"流水节拍",{"id":557,"libraryId":5,"type":72,"typeLabel":73,"stem":558,"options":559,"answer":375,"analysis":33},1143705,"流水施工组织形式包括（）。",[560,562,564,566,568],{"key":20,"text":561,"correct":29},"无节奏流水施工",{"key":24,"text":563,"correct":29},"等节奏流水施工",{"key":27,"text":565,"correct":29},"异节奏流水施工",{"key":31,"text":567,"correct":22},"依次施工",{"key":85,"text":569,"correct":22},"平行施工",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":31,"analysis":33},1143707,"工期十分紧迫， 在工作面、 资源允许情况下， 宜采用的施工组织形式是（）。",[574,575,577,578],{"key":20,"text":563,"correct":22},{"key":24,"text":576,"correct":22},"成倍节拍流水施工",{"key":27,"text":567,"correct":22},{"key":31,"text":569,"correct":29},{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":31,"analysis":33},1143709,"单位工程进度计划应在（） 领导下编制。",[583,584,586,588],{"key":20,"text":182,"correct":22},{"key":24,"text":585,"correct":22},"总监理工程师",{"key":27,"text":587,"correct":22},"项目经理",{"key":31,"text":589,"correct":29},"项目技术负责人",{"id":591,"libraryId":5,"type":72,"typeLabel":73,"stem":592,"options":593,"answer":349,"analysis":33},1143711,"土方回填施工结束后， 应检查（） 等是否满足设计或规范要求。",[594,596,598,600,602],{"key":20,"text":595,"correct":29},"标高",{"key":24,"text":597,"correct":22},"排水措施",{"key":27,"text":599,"correct":29},"边坡坡度",{"key":31,"text":601,"correct":22},"回填土的含水量控制",{"key":85,"text":603,"correct":29},"压实程度",{"id":605,"libraryId":5,"type":72,"typeLabel":73,"stem":606,"options":607,"answer":158,"analysis":33},1143713,"土方开挖过程中， 应检查（）， 并随时观测周围环境的变化。",[608,610,612,613,615],{"key":20,"text":609,"correct":29},"平面位置",{"key":24,"text":611,"correct":29},"水平标高",{"key":27,"text":599,"correct":29},{"key":31,"text":614,"correct":22},"土质",{"key":85,"text":616,"correct":29},"排水和降低地下水位系统",{"id":618,"libraryId":5,"type":72,"typeLabel":73,"stem":619,"options":620,"answer":631,"analysis":33},1143716,"某工地发生质量事故， 导致 2 人死亡， 10 人重伤， 直接经济损失为 500 万元。 关于该质量事故的说法中， 正确的是有（）。",[621,623,625,627,629],{"key":20,"text":622,"correct":22},"事故发生后，现场有关人员应立即向施工单位项目负责人报告",{"key":24,"text":624,"correct":22},"施工单位负责人接到报告后，应于2h内向事故发生地县级以上人民政府住房和城乡建设主管部门及有关部门报告",{"key":27,"text":626,"correct":29},"该质量事故应逐级上报至国务院住房和城乡建设主管部门",{"key":31,"text":628,"correct":29},"住房和城乡建设主管部门逐级上报事故情况时，每级上报时间不得超过2h",{"key":85,"text":630,"correct":22},"事故发生之日起7日内伤亡人数发生变化的，应当及时补报","CD",{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":31,"analysis":33},1143718,"填充墙与主体结构交接处裂缝的防治措施包括（）。",[636,638,640,642],{"key":20,"text":637,"correct":22},"柱边应设置间距不大于500mm的2φ6钢筋，且应在砌体内锚固长度不小于500mm的拉结筋",{"key":24,"text":639,"correct":22},"填充墙梁下口最后3皮砖应在下部墙砌完7d后砌筑，并由一边向另一边斜砌",{"key":27,"text":641,"correct":22},"外窗下为空心砖墙时，将窗台改为不低于C20的细石混凝土，其长度大于窗边100mm",{"key":31,"text":643,"correct":29},"柱与填充墙接触处设置钢丝网片",{"id":645,"libraryId":5,"type":72,"typeLabel":73,"stem":646,"options":647,"answer":656,"analysis":33},1143720,"成型钢筋的复试内容包括（）。",[648,649,651,652,654],{"key":20,"text":387,"correct":29},{"key":24,"text":650,"correct":29},"单位长度的重量偏差",{"key":27,"text":381,"correct":29},{"key":31,"text":653,"correct":29},"伸长率",{"key":85,"text":655,"correct":22},"冷弯","ABCD",{"id":658,"libraryId":5,"type":72,"typeLabel":73,"stem":659,"options":660,"answer":671,"analysis":33},1143722,"关于防水工程施工完成后的检查与验收的说法， 正确的有（）。",[661,663,665,667,669],{"key":20,"text":662,"correct":22},"屋面防水层完工后，应在雨后或持续淋水24h后进行检查",{"key":24,"text":664,"correct":29},"有可能做蓄水试验的屋面，蓄水时间不应少于24h",{"key":27,"text":666,"correct":29},"厨房、厕浴间防水工程应进行两次蓄水试验，蓄水试验时间不应少于24h",{"key":31,"text":668,"correct":22},"厕浴间墙面持续淋水试验应达到30min以上不渗漏",{"key":85,"text":670,"correct":22},"厨房、厕浴间蓄水试验的蓄水深度在最深处不得小于10mm","BC",[673,676,679,682,685,688],{"id":15,"name":674,"category":7,"favorite":675},"领导干部任职前廉政法规知识测试题",92,{"id":677,"name":678,"category":7,"favorite":15},595,"建筑结构与设备",{"id":680,"name":681,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":683,"name":684,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":686,"name":687,"category":7,"favorite":8},534,"BIM工程师",{"id":689,"name":687,"category":7,"favorite":8},535]