[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":693},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,5,50,2362,[13,38,52,64,79,94,109,124,136,151,166,180,195,209,221,233,245,260,272,284,296,308,320,332,344,356,371,385,397,409,421,435,450,465,479,494,508,520,535,547,559,571,585,597,612,624,638,650,664,678],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1143283,2,"多选题","关于钢结构高强度螺栓安装的说法， 正确的有（）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","高强度螺栓和焊接并用的连接节点，当设计无规定时，宜先螺栓紧固后焊接",true,{"key":24,"text":25,"correct":26},"B","若螺栓不能自由穿入螺栓孔，应采用气割扩孔",false,{"key":28,"text":29,"correct":26},"C","高强度螺栓终拧后外露丝扣不少于2扣",{"key":31,"text":32,"correct":26},"D","螺栓孔的扩孔数量应经建设单位同意",{"key":34,"text":35,"correct":22},"E","同一接头中高强度螺栓的初拧、复拧、终拧应在24小时内完成","AE","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":31,"analysis":37},1143285,1,"单选题","关于后浇带施工的说法， 正确的是（）。",[44,46,48,50],{"key":20,"text":45,"correct":26},"若设计无要求，至少保留14d后再继续浇筑混凝土",{"key":24,"text":47,"correct":26},"填充后浇带后采用高膨胀混凝土",{"key":28,"text":49,"correct":26},"应采用与原结构相同强度等级的混凝土浇筑",{"key":31,"text":51,"correct":22},"后浇带混凝土至少保持14d的湿润养护",{"id":53,"libraryId":5,"type":40,"typeLabel":41,"stem":54,"options":55,"answer":24,"analysis":37},1143286,"关于后张法预应力（无粘结） 施工的说法， 正确的是（）。",[56,58,60,62],{"key":20,"text":57,"correct":26},"预应力混凝土楼盖中的张拉顺序是先张拉主梁、后张拉楼板、次梁",{"key":24,"text":59,"correct":22},"预应力筋的张拉宜按均匀、对称的原则张拉",{"key":28,"text":61,"correct":26},"无粘结预应力筋长度超过20m时，宜采用两端张拉",{"key":31,"text":63,"correct":26},"无粘结预应力筋长度超过40m时，宜采用分段张拉",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":78,"analysis":37},1143288,"关于混凝土施工缝继续浇筑混凝土的说法， 正确的有（）。",[68,70,72,74,76],{"key":20,"text":69,"correct":26},"已浇筑的混凝土，其抗压强度不小于1.0N\u002Fmm2",{"key":24,"text":71,"correct":22},"清除已硬化的混凝土表面水泥薄膜和松动的石子以及软弱混凝土层",{"key":28,"text":73,"correct":22},"充分湿润和冲洗干净已硬化的混凝土表面，且不得积水",{"key":31,"text":75,"correct":22},"浇筑混凝土前，宜先在施工缝处刷一层水泥浆（可掺适量界面剂）或铺一层与混凝土内成分相同的水泥砂浆",{"key":34,"text":77,"correct":22},"混凝土应细致捣实，使新旧混凝土紧密结合","BCDE",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":93,"analysis":37},1143291,"关于填充墙砌体工程的说法， 正确的有（）。",[83,85,87,89,91],{"key":20,"text":84,"correct":26},"轻骨料混凝土小型空心砌块、蒸压加气混凝土砌块的产品砌块龄期不应小于14d",{"key":24,"text":86,"correct":26},"小砌块墙体应孔对孔、肋对肋错缝搭砌，单排孔小砌块的搭接长度应为块体长度的1\u002F3",{"key":28,"text":88,"correct":22},"砌块堆置高度不宜超过2m",{"key":31,"text":90,"correct":22},"轻骨料混凝土小砌块，砌筑前应提前1~2天浇水湿润",{"key":34,"text":92,"correct":26},"在厨房间、卫生间、浴室等处采用轻骨料混凝土小型空心砌块、蒸压加气混凝土砌块砌筑墙体时，可直接从地面砌起","CD",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":108,"analysis":37},1143293,"关于型钢混凝土组合结构特点的说法， 正确的有（）。",[98,100,102,104,106],{"key":20,"text":99,"correct":22},"抗震性能好",{"key":24,"text":101,"correct":26},"型钢混凝土组合结构的混凝土强度等级不宜小于C40",{"key":28,"text":103,"correct":22},"承载能力高",{"key":31,"text":105,"correct":22},"加快施工速度，可缩短工期",{"key":34,"text":107,"correct":26},"构件截面大","ACD",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":123,"analysis":37},1143295,"关于砖砌体工程说法， 正确的有（）。",[113,115,117,119,121],{"key":20,"text":114,"correct":22},"多孔砖的孔洞应垂直于受压面砌筑",{"key":24,"text":116,"correct":22},"半盲孔多孔砖的封底面应朝上砌筑",{"key":28,"text":118,"correct":26},"空心砖墙砌筑时，孔洞应呈垂直方向",{"key":31,"text":120,"correct":22},"空心砖墙门窗洞口两侧一砖范围内应采用烧结普通砖砌筑",{"key":34,"text":122,"correct":26},"空心砖墙应直接从楼地面砌起","ABD",{"id":125,"libraryId":5,"type":40,"typeLabel":41,"stem":126,"options":127,"answer":28,"analysis":37},1143297,"关于砖墙工作段分段位置的说法， 正确的是（）。",[128,130,132,134],{"key":20,"text":129,"correct":26},"不宜设在变形缝、构造柱处",{"key":24,"text":131,"correct":26},"相邻工作段的砌筑高度不得超过3m",{"key":28,"text":133,"correct":22},"宜设在门窗洞口处",{"key":31,"text":135,"correct":26},"相邻工作段的砌筑高度不得超过两个楼层高度",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":150,"analysis":37},1143299,"模板工程设计的主要原则有（）。",[140,142,144,146,148],{"key":20,"text":141,"correct":26},"适用性",{"key":24,"text":143,"correct":22},"安全性",{"key":28,"text":145,"correct":26},"耐久性",{"key":31,"text":147,"correct":22},"经济性",{"key":34,"text":149,"correct":22},"实用性","BDE",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":165,"analysis":37},1143301,"砌体工程中不得设置脚手眼的墙体或部位有（）。",[155,157,159,161,163],{"key":20,"text":156,"correct":22},"120mm厚墙、清水墙和独立柱",{"key":24,"text":158,"correct":26},"砖砌体门窗洞口两侧300mm范围内",{"key":28,"text":160,"correct":26},"宽度为1.2m的窗间墙",{"key":31,"text":162,"correct":22},"过梁上与过梁成60°角的三角形范围内及过梁净跨度1\u002F2的高度范围内",{"key":34,"text":164,"correct":22},"梁或梁垫下及其左右500mm范围内","ADE",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":123,"analysis":37},1143303,"下列关于泵送混凝土配合比设计正确的有（）。",[170,172,174,176,178],{"key":20,"text":171,"correct":22},"坍落度不宜小于100mm",{"key":24,"text":173,"correct":22},"水胶比不宜大于0.6",{"key":28,"text":175,"correct":26},"胶凝材料总量不宜小于280kg\u002Fm3",{"key":31,"text":177,"correct":22},"粗骨料针片状颗粒不宜大于10%",{"key":34,"text":179,"correct":26},"掺用引气剂时，混凝土的含气量不宜大于5%",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":194,"analysis":37},1143306,"下列关于普通螺栓连接的说法正确的是（）。",[184,186,188,190,192],{"key":20,"text":185,"correct":26},"螺栓头侧放置的垫圈不应多于1个，螺母侧垫圈不应多于2个",{"key":24,"text":187,"correct":26},"可以采用大螺母代替垫圈",{"key":28,"text":189,"correct":22},"螺栓拧紧后，外露丝扣不少于2扣",{"key":31,"text":191,"correct":22},"对于动荷载或重要部位的螺栓连接应按设计要求放置弹簧垫圈，且必须设在螺母一侧",{"key":34,"text":193,"correct":22},"普通螺栓应从从中间开始，对称向两边进行紧固","CDE",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":150,"analysis":37},1143308,"下列关于砌筑砂浆说法正确的有（）。",[199,201,203,205,207],{"key":20,"text":200,"correct":26},"M15以上强度等级的砌筑砂浆宜选用32.5级普通水泥",{"key":24,"text":202,"correct":22},"砌筑砂浆宜选用中砂",{"key":28,"text":204,"correct":26},"磨细生石灰粉的熟化时间不少于3d",{"key":31,"text":206,"correct":22},"水泥混合砂浆自投料完算起搅拌时间不少于2min",{"key":34,"text":208,"correct":22},"当施工期间温度超过30℃时，混合砂浆应在2h内用完",{"id":210,"libraryId":5,"type":40,"typeLabel":41,"stem":211,"options":212,"answer":24,"analysis":37},1143311,"在常温条件下， 一般墙体大模板拆除时， 混凝土强度至少要达到（） N\u002Fmm2。",[213,215,217,219],{"key":20,"text":214,"correct":26},"0.5",{"key":24,"text":216,"correct":22},"1.0",{"key":28,"text":218,"correct":26},"1.2",{"key":31,"text":220,"correct":26},"1.5",{"id":222,"libraryId":5,"type":40,"typeLabel":41,"stem":223,"options":224,"answer":28,"analysis":37},1143313,"正常施工条件下， 砖砌体每日砌筑高度宜控制在（） 内。",[225,227,229,231],{"key":20,"text":226,"correct":26},"1m",{"key":24,"text":228,"correct":26},"1.2m",{"key":28,"text":230,"correct":22},"1.5m",{"key":31,"text":232,"correct":26},"1.6m",{"id":234,"libraryId":5,"type":40,"typeLabel":41,"stem":235,"options":236,"answer":24,"analysis":37},1143314,"关于施工缝的留置位置说法， 正确的是（）。",[237,239,241,243],{"key":20,"text":238,"correct":26},"施工缝宜留置在受弯矩最小处",{"key":24,"text":240,"correct":22},"柱施工缝留置在基础、楼板、梁的顶面",{"key":28,"text":242,"correct":26},"主次梁的楼板，施工缝留置在主梁跨中1\u002F3范围内",{"key":31,"text":244,"correct":26},"单向板的施工缝留置在平行于板的长边任何位置",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":259,"analysis":37},1143316,"关于主体结构混凝土的浇筑说法正确的是（）。",[249,251,253,255,257],{"key":20,"text":250,"correct":26},"梁、板混凝土宜分开浇筑",{"key":24,"text":252,"correct":26},"高度大于0.8m的梁可单独浇筑混凝土",{"key":28,"text":254,"correct":22},"有主次梁的楼板宜顺着次梁方向浇筑",{"key":31,"text":256,"correct":26},"单向板宜沿着板的短边方向浇筑",{"key":34,"text":258,"correct":22},"混凝土应连续浇筑，避免留置施工缝","CE",{"id":261,"libraryId":5,"type":40,"typeLabel":41,"stem":262,"options":263,"answer":24,"analysis":37},1143318,"关于钢筋绑扎连接的说法， 正确的是（）。",[264,266,268,270],{"key":20,"text":265,"correct":26},"受拉钢筋直径大于25m时，可采用绑扎搭接接头",{"key":24,"text":267,"correct":22},"受压钢筋直接大于28m时，不宜采用绑扎搭接接头",{"key":28,"text":269,"correct":26},"轴心受拉杆件的纵向受力钢筋，可采用绑扎搭接接头",{"key":31,"text":271,"correct":26},"直接承受动力荷载结构中的纵向受力钢筋，可采用绑扎搭接接头",{"id":273,"libraryId":5,"type":40,"typeLabel":41,"stem":274,"options":275,"answer":20,"analysis":37},1143320,"关于混凝土养护的说法， 正确的是（）。",[276,278,280,282],{"key":20,"text":277,"correct":22},"通常为混凝土浇筑完毕后8~12h内，开始进行自然养护",{"key":24,"text":279,"correct":26},"在已浇筑的混凝土强度未达到1.0N\u002Fmm2之前，不得在其上踩踏或安装模板",{"key":28,"text":281,"correct":26},"硅酸盐水泥、普通硅酸盐水泥拌制的混凝土，养护时间不得少于14d",{"key":31,"text":283,"correct":26},"火山灰质水泥、粉煤灰水泥拌制的混凝土，养护时间不得少于7d",{"id":285,"libraryId":5,"type":40,"typeLabel":41,"stem":286,"options":287,"answer":24,"analysis":37},1143322,"关于后张法预应力（有粘结） 施工的说法， 正确的是（）。",[288,290,292,294],{"key":20,"text":289,"correct":26},"对于平卧重叠构件，张拉顺序宜先下后上逐层进行，每层对称张拉的原则",{"key":24,"text":291,"correct":22},"预应力筋的张拉以控制张拉值为主，以预应力筋张拉伸长值作校核",{"key":28,"text":293,"correct":26},"宜用42.5级硅酸盐水泥或普通硅酸盐水泥调制的水泥浆，水灰比不应大于0.45，强度不应小于30N\u002Fmm2",{"key":31,"text":295,"correct":26},"预应力筋张拉时，混凝土强度不低于设计的混凝土立方体抗压强度标准值的70%",{"id":297,"libraryId":5,"type":40,"typeLabel":41,"stem":298,"options":299,"answer":20,"analysis":37},1143325,"后张法有粘结预应力施工中， 与预应力筋孔道同时留设的孔道不包括（）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"观测孔",{"key":24,"text":303,"correct":26},"排气孔",{"key":28,"text":305,"correct":26},"灌浆孔",{"key":31,"text":307,"correct":26},"泌水孔",{"id":309,"libraryId":5,"type":40,"typeLabel":41,"stem":310,"options":311,"answer":28,"analysis":37},1143327,"砂浆的保水性用（） 表示。",[312,314,316,318],{"key":20,"text":313,"correct":26},"稠度",{"key":24,"text":315,"correct":26},"坍落度",{"key":28,"text":317,"correct":22},"分层度",{"key":31,"text":319,"correct":26},"沉入度",{"id":321,"libraryId":5,"type":40,"typeLabel":41,"stem":322,"options":323,"answer":31,"analysis":37},1143329,"关于梁、 板钢筋的绑扎说法， 正确的是（）。",[324,326,328,330],{"key":20,"text":325,"correct":26},"梁的高度较小时，梁的钢筋宜在梁底模上绑扎，其两侧模板或一侧模板后装",{"key":24,"text":327,"correct":26},"梁的高度较大时，梁的钢筋宜架空在梁模板上绑扎，然后再落位",{"key":28,"text":329,"correct":26},"框架节点处钢筋穿插十分稠密时，应保证梁顶面主筋间的净距要有50mm",{"key":31,"text":331,"correct":22},"板的钢筋应在模板安装后绑扎",{"id":333,"libraryId":5,"type":40,"typeLabel":41,"stem":334,"options":335,"answer":24,"analysis":37},1143331,"连续梁上部的纵向钢筋接头位置宜设置在（）。",[336,338,340,342],{"key":20,"text":337,"correct":26},"支座处",{"key":24,"text":339,"correct":22},"跨中1\u002F3跨度范围内",{"key":28,"text":341,"correct":26},"梁端1\u002F3跨度范围内",{"key":31,"text":343,"correct":26},"任意位置",{"id":345,"libraryId":5,"type":40,"typeLabel":41,"stem":346,"options":347,"answer":28,"analysis":37},1143333,"直接承受动力荷载结构中的纵向受力钢筋， 其接头优先采用（）。",[348,350,352,354],{"key":20,"text":349,"correct":26},"闪光对焊",{"key":24,"text":351,"correct":26},"绑扎连接",{"key":28,"text":353,"correct":22},"螺纹套管连接",{"key":31,"text":355,"correct":26},"电弧焊",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":370,"analysis":37},1143335,"关于钢筋代换的说法， 正确的有（）。",[360,362,364,366,368],{"key":20,"text":361,"correct":22},"当构件配筋受强度控制时，按钢筋代换前后强度相等的原则代换",{"key":24,"text":363,"correct":26},"当构件按最小配筋率配筋时，按钢筋代换前后强度相等的原则代换",{"key":28,"text":365,"correct":22},"同钢号之间的代换，按钢筋代换前后面积相等的原则代换",{"key":31,"text":367,"correct":26},"钢筋代换应征得建设单位和监理单位的同意",{"key":34,"text":369,"correct":22},"当构件受裂缝宽度控制时，代换前后应进行裂缝宽度和扰度验算","ACE",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":194,"analysis":37},1143337,"下列关于模板工程安装要点说法错误的有（）。",[375,377,379,381,383],{"key":20,"text":376,"correct":26},"在浇筑混凝土前，木模板应浇水湿润，但模板内不应有积水",{"key":24,"text":378,"correct":26},"模板与混凝土接触面清理干净并涂刷隔离剂，不得采用影响结构性能的隔离剂",{"key":28,"text":380,"correct":22},"所有模板搭设完毕后均要保证模板表面平整、无凹凸不平",{"key":31,"text":382,"correct":22},"模板的安装应与钢筋安装配合进行，梁柱节点的模板宜在钢筋安装前安装",{"key":34,"text":384,"correct":22},"后浇带的模板及支架应与两侧混凝土结构的模板一同安装",{"id":386,"libraryId":5,"type":40,"typeLabel":41,"stem":387,"options":388,"answer":28,"analysis":37},1143339,"关于钢筋下料长度计算的表述， 正确的是（）。",[389,391,393,395],{"key":20,"text":390,"correct":26},"直钢筋下料长度=构件长度-保护层厚度-弯钩增加长度",{"key":24,"text":392,"correct":26},"弯起钢筋下料长度=直段长度+斜段长度+弯钩增加长度+弯曲调整值",{"key":28,"text":394,"correct":22},"箍筋下料长度=箍筋周长+箍筋调整值",{"key":31,"text":396,"correct":26},"如有搭接，需要减去搭接长度",{"id":398,"libraryId":5,"type":40,"typeLabel":41,"stem":399,"options":400,"answer":28,"analysis":37},1143341,"钢筋的申请、 备料、 加工的依据是（）。",[401,403,405,407],{"key":20,"text":402,"correct":26},"钢筋施工图",{"key":24,"text":404,"correct":26},"构件配筋图",{"key":28,"text":406,"correct":22},"钢筋配料单",{"key":31,"text":408,"correct":26},"钢筋下料单",{"id":410,"libraryId":5,"type":40,"typeLabel":41,"stem":411,"options":412,"answer":28,"analysis":37},1143343,"跨度为 8m 的简支梁， 混凝土设计强度等级为 C20。 底模及支架拆除时， 其同条件养护的立方体试件的抗压强度标准值应至少达到（） N\u002Fmm2。",[413,415,417,419],{"key":20,"text":414,"correct":26},"5",{"key":24,"text":416,"correct":26},"10",{"key":28,"text":418,"correct":22},"15",{"key":31,"text":420,"correct":26},"20",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":370,"analysis":37},1143345,"关于组合钢模板体系的说法， 正确的有（）。",[425,427,429,431,433],{"key":20,"text":426,"correct":22},"轻便灵活、拼装方便",{"key":24,"text":428,"correct":26},"是现浇墙、壁结构常用的工具式模板",{"key":28,"text":430,"correct":22},"拼缝多且严密性差",{"key":31,"text":432,"correct":26},"重量大，移动、安装需要起重机吊运",{"key":34,"text":434,"correct":22},"通用性强、周转率高",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":449,"analysis":37},1143347,"加气混凝土砌块无切实有效措施， 不得用于的部位有（）。",[439,441,443,445,447],{"key":20,"text":440,"correct":26},"建筑物室内地面标高以上部位",{"key":24,"text":442,"correct":22},"长期浸水或经常受干湿交替部位",{"key":28,"text":444,"correct":22},"长期处于有振动源环境的墙体",{"key":31,"text":446,"correct":22},"砌块表面经常处于80oC以上的高温环境",{"key":34,"text":448,"correct":26},"阳光直射的外墙","BCD",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":464,"analysis":37},1143350,"建筑钢结构常用的全自动焊接方法包括（）。",[454,456,458,460,462],{"key":20,"text":455,"correct":26},"自保护焊",{"key":24,"text":457,"correct":22},"熔化嘴电渣焊",{"key":28,"text":459,"correct":22},"非熔化嘴电渣焊",{"key":31,"text":461,"correct":26},"重力焊",{"key":34,"text":463,"correct":22},"埋弧焊","BCE",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":194,"analysis":37},1143352,"下列关于装配式混凝土结构预制构件吊运与存放的说法， 正确的是（）。",[469,471,473,475,477],{"key":20,"text":470,"correct":26},"吊运时水平夹角宜为30°",{"key":24,"text":472,"correct":26},"采用靠放架立式运输时，构件与地面倾角应大于45°，构件应对称靠放，每层不大于2层",{"key":28,"text":474,"correct":22},"采用插放架直立运输时，应采取防止构件倾斜措施，构件之间应设置隔离垫块",{"key":31,"text":476,"correct":22},"水平运输时，预制梁、柱构件叠放不宜超过3层，板类构件叠放不宜超过6层",{"key":34,"text":478,"correct":22},"预制楼板、叠合板、阳台板和空调板存放时，叠放层数不宜超过6层",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":493,"analysis":37},1143354,"关于预制构件的吊装的说法， 正确的有（）。",[483,485,487,489,491],{"key":20,"text":484,"correct":22},"吊索与构件的水平夹角不宜小于60°，不应小于45°",{"key":24,"text":486,"correct":26},"预制柱宜按照中柱、边柱、角柱顺序进行安装",{"key":28,"text":488,"correct":22},"边柱和角柱应以外轮廓线控制为准",{"key":31,"text":490,"correct":26},"外剪力墙板应以外轮廓线控制为准",{"key":34,"text":492,"correct":26},"预制梁的安装应遵循先高后低的原则","AC",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":36,"analysis":37},1143356,"关于预制构件连接的说法， 正确的是（）。",[498,500,502,504,506],{"key":20,"text":499,"correct":22},"灌浆施工时，环境温度不应低于5℃",{"key":24,"text":501,"correct":26},"连接部位温度低于5℃时，应采取加热保温措施",{"key":28,"text":503,"correct":26},"灌浆作业应采用压浆法从上口灌注",{"key":31,"text":505,"correct":26},"浆料从排浆孔排浆时，应及时封堵注浆孔",{"key":34,"text":507,"correct":22},"灌浆料应在制备后30min内用完",{"id":509,"libraryId":5,"type":40,"typeLabel":41,"stem":510,"options":511,"answer":20,"analysis":37},1143358,"烧结普通砖砌体通常采用（） 砌筑方法。",[512,514,516,518],{"key":20,"text":513,"correct":22},"“三一”砌筑法",{"key":24,"text":515,"correct":26},"挤浆法",{"key":28,"text":517,"correct":26},"刮浆法",{"key":31,"text":519,"correct":26},"满口灰法",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":534,"analysis":37},1143360,"下列关于砖砌体工程留置直槎的说法， 正确的是（）。",[524,526,528,530,532],{"key":20,"text":525,"correct":26},"抗震设防烈度8度地区的临时间断处可留置直槎",{"key":24,"text":527,"correct":22},"120mm墙应放置2￠6拉结钢筋",{"key":28,"text":529,"correct":26},"直槎应做成凹槎",{"key":31,"text":531,"correct":26},"抗震设防烈度6度地区，拉结钢筋每边埋入墙内长度不应小于500mm",{"key":34,"text":533,"correct":22},"拉结钢筋末端应由90°弯钩","BE",{"id":536,"libraryId":5,"type":40,"typeLabel":41,"stem":537,"options":538,"answer":24,"analysis":37},1143362,"下列关于马牙槎说法正确的是（）。",[539,541,543,545],{"key":20,"text":540,"correct":26},"非抗震设防地区临时间断处应砌成马牙槎",{"key":24,"text":542,"correct":22},"马牙槎处应先绑扎钢筋、后砌砖墙、最后浇筑混凝土",{"key":28,"text":544,"correct":26},"拉结筋每边伸入墙内不应少于500mm",{"key":31,"text":546,"correct":26},"马牙槎从每层柱脚开始，先进后退",{"id":548,"libraryId":5,"type":40,"typeLabel":41,"stem":549,"options":550,"answer":24,"analysis":37},1143365,"下列关于砂浆的流动性说法正确的是（）。",[551,553,555,557],{"key":20,"text":552,"correct":26},"砂浆的流动性用稠度与坍落度表示",{"key":24,"text":554,"correct":22},"稠度越大流动性越好",{"key":28,"text":556,"correct":26},"在干热条件下砌筑时，应选用较小稠度值的砂浆",{"key":31,"text":558,"correct":26},"对于密实吸水材料较小的块料砌筑时，应选用较大稠度值的砂浆",{"id":560,"libraryId":5,"type":40,"typeLabel":41,"stem":561,"options":562,"answer":20,"analysis":37},1143367,"关于柱钢筋绑扎的说法， 正确的是（）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"框架梁、牛腿及柱帽等钢筋，应放在柱子纵向钢筋内侧",{"key":24,"text":566,"correct":26},"柱中的竖向钢筋搭接时，角部钢筋应与模板成60°",{"key":28,"text":568,"correct":26},"柱钢筋的绑扎应在模板安装后进行",{"key":31,"text":570,"correct":26},"每层柱的第一个钢筋接头位置距楼地面高度宜为500mm",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":194,"analysis":37},1143368,"关于主体结构混凝土浇筑的说法， 正确的有（）。",[575,577,579,581,583],{"key":20,"text":576,"correct":26},"混凝土自高处倾落的自由高度，不宜超过3m",{"key":24,"text":578,"correct":26},"浇筑高度超过1m时，应采用串筒、溜管、溜槽等装置",{"key":28,"text":580,"correct":22},"浇筑与柱和墙连成整体的梁、板时，应在柱、墙浇筑完毕后停歇1~1.5h，再继续浇筑",{"key":31,"text":582,"correct":22},"混凝土泵车应尽量靠近浇筑地点，浇筑时应由远至近",{"key":34,"text":584,"correct":22},"浇筑竖向结构混凝土前，应先在底部填以不大于30mm厚与混凝土砂浆成分相同的水泥砂浆",{"id":586,"libraryId":5,"type":40,"typeLabel":41,"stem":587,"options":588,"answer":28,"analysis":37},1143370,"下列关于混凝土振捣的说法， 正确的是（）。",[589,591,593,595],{"key":20,"text":590,"correct":26},"插入式证到期振捣普通混凝土时，应慢插快拔",{"key":24,"text":592,"correct":26},"振捣器移动间距不宜大于振捣器作用半径的2倍",{"key":28,"text":594,"correct":22},"振捣器与模板的距离不应大于其作用半径的0.5倍",{"key":31,"text":596,"correct":26},"振捣器插入下层混凝土内的深度不小于100mm",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":611,"analysis":37},1143373,"下列关于钢筋的加工说法， 正确的有（）。",[601,603,605,607,609],{"key":20,"text":602,"correct":26},"当采用冷拉调直时，HPB300光圆钢筋的冷拉率不宜大于1%",{"key":24,"text":604,"correct":22},"钢筋可采用酸洗除锈",{"key":28,"text":606,"correct":26},"钢筋的切断口可以有马蹄形或弯起现象",{"key":31,"text":608,"correct":22},"钢筋加工应在常温状态下进行，加工过程中不应加热钢筋",{"key":34,"text":610,"correct":26},"对于弯折过度的钢筋，应进行回弯","BD",{"id":613,"libraryId":5,"type":40,"typeLabel":41,"stem":614,"options":615,"answer":28,"analysis":37},1143375,"下列关于钢筋的性质说法中， 正确的是（）。",[616,618,620,622],{"key":20,"text":617,"correct":26},"钢筋的伸长率一般随着钢筋强度等级的提高而提高",{"key":24,"text":619,"correct":26},"钢筋的冷弯是考核钢筋强度的指标",{"key":28,"text":621,"correct":22},"钢筋的冷弯性能一般随着强度的提高而降低",{"key":31,"text":623,"correct":26},"可焊性随着碳当量百分比的增高而提高",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":464,"analysis":37},1143377,"关于地下防水混凝土施工技术要求的说法， 正确的有（）。",[628,630,632,634,636],{"key":20,"text":629,"correct":26},"防水混凝土应采用机械搅拌，搅拌时间不少于3min",{"key":24,"text":631,"correct":22},"防水混凝土浇筑时分层厚度不得大于500mm",{"key":28,"text":633,"correct":22},"应采用高频机械分层振捣密实，振捣时间宜为10~30s",{"key":31,"text":635,"correct":26},"宜选用粗砂，含泥量不应大于3%",{"key":34,"text":637,"correct":22},"碎石和卵石含泥量不得大于1%",{"id":639,"libraryId":5,"type":40,"typeLabel":41,"stem":640,"options":641,"answer":24,"analysis":37},1143380,"关于室内防水卷材施工的说法中， 正确的是（）。",[642,644,646,648],{"key":20,"text":643,"correct":26},"以粘贴法施工的防水卷材，其与基层应采用空铺法铺贴",{"key":24,"text":645,"correct":22},"卷材施工时宜先铺立面，后铺平面",{"key":28,"text":647,"correct":26},"采用冷粘法施工不应低于0℃",{"key":31,"text":649,"correct":26},"采用热熔法施工不应低于-5℃",{"id":651,"libraryId":5,"type":15,"typeLabel":16,"stem":652,"options":653,"answer":534,"analysis":37},1143382,"下列关于地下防水卷材“外防外贴法” 施工技术要求的说法， 错误的有（）。",[654,656,658,660,662],{"key":20,"text":655,"correct":26},"先铺平面，后铺立面",{"key":24,"text":657,"correct":22},"临时性保护墙应采用混合砂浆砌筑",{"key":28,"text":659,"correct":26},"当使用两层卷材时，卷材应错槎接缝",{"key":31,"text":661,"correct":26},"阴阳角应做成圆弧或45°坡角",{"key":34,"text":663,"correct":22},"底板卷材防水层上细石混凝土保护层厚度不应小于70mm",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":150,"analysis":37},1143385,"关于防水混凝土配合比的说法， 正确的有（）。",[668,670,672,674,676],{"key":20,"text":669,"correct":26},"防水混凝土胶凝材料总量不宜小于300kg\u002Fm3，水泥用量不宜小于260kg\u002Fm3",{"key":24,"text":671,"correct":22},"水胶比不得大于0.50",{"key":28,"text":673,"correct":26},"入泵坍落度宜为100~140mm",{"key":31,"text":675,"correct":22},"掺引气剂时，混凝土含气量应控制在3%~5%",{"key":34,"text":677,"correct":22},"预拌混凝土初凝时间以为6~8h",{"id":679,"libraryId":5,"type":15,"typeLabel":16,"stem":680,"options":681,"answer":692,"analysis":37},1143388,"关于防水砂浆施工的说法， 正确的有（）。",[682,684,686,688,690],{"key":20,"text":683,"correct":22},"水泥砂浆防水层不应用于受持续振动或温度高于80℃的地下工程防水",{"key":24,"text":685,"correct":26},"基础表面的孔洞、缝隙，应采用与水泥砂浆堵塞并抹平",{"key":28,"text":687,"correct":26},"砂宜采用中砂，含泥量不大于3%",{"key":31,"text":689,"correct":22},"冬季施工气温不应低于5℃，夏季不宜在30℃以上或烈日照射下施工",{"key":34,"text":691,"correct":26},"防水砂浆养护温度不宜低于5℃，养护时间不得少于7d","AD",[694,697,700,703,706,709],{"id":40,"name":695,"category":7,"favorite":696},"领导干部任职前廉政法规知识测试题",92,{"id":698,"name":699,"category":7,"favorite":40},595,"建筑结构与设备",{"id":701,"name":702,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":704,"name":705,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":707,"name":708,"category":7,"favorite":8},534,"BIM工程师",{"id":710,"name":708,"category":7,"favorite":8},535]