[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-47":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":640},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,47,50,2362,[13,38,53,67,79,91,103,118,130,142,154,166,180,192,207,215,230,244,259,271,282,294,306,318,333,342,357,369,383,395,407,419,431,445,457,469,481,493,505,517,529,538,550,562,573,587,599,608,622,632],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1145728,2,"多选题","某工作横道图费用偏差分析如下图，正确的有()。( 2015年真题)",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","费用超支",true,{"key":24,"text":25,"correct":22},"B","进度较快",{"key":27,"text":28,"correct":29},"C","效率较高",false,{"key":31,"text":32,"correct":29},"D","可采用抽出部分人员，放慢进度的措施",{"key":34,"text":35,"correct":22},"E","投入超前","ABE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1145729,"按最早开始时间编制的施工计划及各工作每月成本强度（单位：万元\u002F月）如下图，D工作可以按最早开始时间或最迟开始时间进行安排。则4月份的施工成本计划值可以是()万元。( 2015年真题)",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"60",{"key":24,"text":45,"correct":22},"50",{"key":27,"text":47,"correct":22},"25",{"key":31,"text":49,"correct":29},"15",{"key":34,"text":51,"correct":29},"10","BC",{"id":54,"libraryId":5,"type":55,"typeLabel":56,"stem":57,"options":58,"answer":20,"analysis":37},1145730,1,"单选题","应用曲线法进行施工成本偏差分析时，已完工作实际成本曲线与已完工作预算成本曲线的竖向距离，表示（）。( 2012年真题)",[59,61,63,65],{"key":20,"text":60,"correct":22},"成本偏差",{"key":24,"text":62,"correct":29},"进度偏差",{"key":27,"text":64,"correct":29},"进度局部偏差",{"key":31,"text":66,"correct":29},"成本局部偏差",{"id":68,"libraryId":5,"type":55,"typeLabel":56,"stem":69,"options":70,"answer":27,"analysis":37},1145731,"某施工项目部根据以往项目的材料实际耗用情况，结合具体施工项目要求，制定领用材料标准控制发料。这种材料用量控制方法是()。( 2015年真题)",[71,73,75,77],{"key":20,"text":72,"correct":29},"定额控制",{"key":24,"text":74,"correct":29},"计量控制",{"key":27,"text":76,"correct":22},"指标控制",{"key":31,"text":78,"correct":29},"包干控制",{"id":80,"libraryId":5,"type":55,"typeLabel":56,"stem":81,"options":82,"answer":24,"analysis":37},1145732,"某工程每月所需混凝土量相同，混凝土用量为3200m3，计划4个月完成，混凝土综合价格为1000元\u002Fm3；实际混凝土用量为5000m3，用时5个月，从第1个月至第5个月各月混凝土价格指数(%)为100,115，110，105，115。则根据赢得值法，前3个月的费用偏差为()万元。( 2015年真题)",[83,85,87,89],{"key":20,"text":84,"correct":29},"-30",{"key":24,"text":86,"correct":22},"-25",{"key":27,"text":88,"correct":29},"-22",{"key":31,"text":90,"correct":29},"-20",{"id":92,"libraryId":5,"type":55,"typeLabel":56,"stem":93,"options":94,"answer":24,"analysis":37},1145733,"施工成本的过程控制中，人工费的控制实行()方法。( 2014年真题)",[95,97,99,101],{"key":20,"text":96,"correct":29},"量化管理",{"key":24,"text":98,"correct":22},"量价分离",{"key":27,"text":100,"correct":29},"弹性管理",{"key":31,"text":102,"correct":29},"指标包干",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":117,"analysis":37},1145734,"采用过程控制的方法控制施工成本时，控制的要点有()。( 2014年真题)",[107,109,111,113,115],{"key":20,"text":108,"correct":22},"材料费同样采用量价分离原则进行控制",{"key":24,"text":110,"correct":29},"材料价格由项目经理负责控制",{"key":27,"text":112,"correct":22},"对分包费用的控制，重点是做好分包工程询价、验收和结算等工作",{"key":31,"text":114,"correct":22},"实行弹性需求的劳务管理制度",{"key":34,"text":116,"correct":22},"做好施工机械配件和工程材料采购计划","ACDE",{"id":119,"libraryId":5,"type":55,"typeLabel":56,"stem":120,"options":121,"answer":20,"analysis":37},1145735,"对总额1000万元的工程项目进行期中检查，截止检查时已完成工作预算费用410万元，计划工作预算费用为400万元，已完工作实际费用为430万元，则其费用绩效指数为（ ）。( 2013年真题)",[122,124,126,128],{"key":20,"text":123,"correct":22},"0.953",{"key":24,"text":125,"correct":29},"0.430",{"key":27,"text":127,"correct":29},"0.930",{"key":31,"text":129,"correct":29},"1.075",{"id":131,"libraryId":5,"type":55,"typeLabel":56,"stem":132,"options":133,"answer":24,"analysis":37},1145736,"关于施工成本控制的说法，正确的是()。( 2014年真题)",[134,136,138,140],{"key":20,"text":135,"correct":29},"施工成本管理体系由社会有关组织进行评审和认证",{"key":24,"text":137,"correct":22},"要做好施工成本的过程控制，必须制定规范化的过程控制程序",{"key":27,"text":139,"correct":29},"管理行为控制程序是进行成本过程控制的重点",{"key":31,"text":141,"correct":29},"管理行为控制程序和指标控制程序是相互独立的",{"id":143,"libraryId":5,"type":55,"typeLabel":56,"stem":144,"options":145,"answer":31,"analysis":37},1145737,"下列施工成本材料费的控制中，可以影响材料价格的因素是（ ）。( 2013年真题)",[146,148,150,152],{"key":20,"text":147,"correct":29},"材料领用的指标",{"key":24,"text":149,"correct":29},"材料的投料计量",{"key":27,"text":151,"correct":29},"材料消耗量的大小",{"key":31,"text":153,"correct":22},"材料的采购运输",{"id":155,"libraryId":5,"type":55,"typeLabel":56,"stem":156,"options":157,"answer":31,"analysis":37},1145738,"某分部工程计划工程量5000m3，计划成本380元\u002Fm3，实际完成工程量为4500m3，实际成本400元\u002Fm3。用赢得值法分析该分部工程的施工成本偏差为（ ）元。 ( 2011)",[158,160,162,164],{"key":20,"text":159,"correct":29},"-100000",{"key":24,"text":161,"correct":29},"-190000",{"key":27,"text":163,"correct":29},"-200000",{"key":31,"text":165,"correct":22},"-90000",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":36,"analysis":37},1145739,"横道图法是分析建设工程项目施工成本偏差的常用方法，其特点包括（）",[170,172,174,176,178],{"key":20,"text":171,"correct":22},"具有形象、直观、一目了然等优点",{"key":24,"text":173,"correct":22},"能够准确表达施工成本的绝对偏差",{"key":27,"text":175,"correct":29},"能够准确表达施工成本的相对偏差",{"key":31,"text":177,"correct":29},"能够直观地显示施工成本的局部偏差和累计偏差",{"key":34,"text":179,"correct":22},"能够直观地显示偏差的严重性",{"id":181,"libraryId":5,"type":55,"typeLabel":56,"stem":182,"options":183,"answer":24,"analysis":37},1145740,"关于施工成本及其管理的说法，正确的是（ ）。( 2013年真题)",[184,186,188,190],{"key":20,"text":185,"correct":29},"施工成本是指施工过程中消耗的构成工程实体的各项费用支出",{"key":24,"text":187,"correct":22},"施工成本管理就是在保证工期和满足质量要求的情况下，采取相应措施把成本控制在计划范围内，并最大限度的节约成本",{"key":27,"text":189,"correct":29},"施工成本预测是指以货币形式编制施工项目在计划期内的生产费用、成本水平、成本降低率及降低成本措施的书面方案",{"key":31,"text":191,"correct":29},"施工成本考核是在施工成本核算的基础上，对成本形成过程和影响成本升降的因素进行分析，以寻求进一步降低成本的途径",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":206,"analysis":37},1145741,"适合挖掘地下水中土方的机械有（ ）。2017真题",[196,198,200,202,204],{"key":20,"text":197,"correct":29},"正铲挖掘机",{"key":24,"text":199,"correct":22},"反铲挖掘机",{"key":27,"text":201,"correct":22},"抓铲挖掘机",{"key":31,"text":203,"correct":29},"铲运机",{"key":34,"text":205,"correct":22},"拉铲挖掘机","BCE",{"id":208,"libraryId":5,"type":55,"typeLabel":56,"stem":209,"options":210,"answer":31,"analysis":37},1145742,"下列土方机械设备中，最适宜用于水下挖土作业的是()。2013年",[211,212,213,214],{"key":20,"text":203,"correct":29},{"key":24,"text":197,"correct":29},{"key":27,"text":199,"correct":29},{"key":31,"text":201,"correct":22},{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},1145743,"（2020年真题）建筑施工中，垂直运输设备有()。",[219,221,223,225,227],{"key":20,"text":220,"correct":22},"塔式起重机",{"key":24,"text":222,"correct":22},"施工电梯",{"key":27,"text":224,"correct":29},"吊篮",{"key":31,"text":226,"correct":22},"物料提升架",{"key":34,"text":228,"correct":22},"混凝土泵","ABDE",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":36,"analysis":37},1145744,"根据《建筑工程施工质量验收统一标准》（GB50300-2013），施工单位技术、质量部门负责人必须参加验收的分部工程有（ ） 2015真题",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"地基与基础",{"key":24,"text":237,"correct":22},"主体结构",{"key":27,"text":239,"correct":29},"建筑装饰装修",{"key":31,"text":241,"correct":29},"屋面",{"key":34,"text":243,"correct":22},"建筑节能",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":258,"analysis":37},1145745,"根据《建筑工程施工质量验收统一标准》(GB50300-2013)，属于主体结构分部的有()。 2016真题",[248,250,252,254,256],{"key":20,"text":249,"correct":22},"混凝土结构",{"key":24,"text":251,"correct":22},"型钢混凝土结构",{"key":27,"text":253,"correct":22},"铝合金结构",{"key":31,"text":255,"correct":29},"劲钢（管）混凝土结构",{"key":34,"text":257,"correct":29},"网架和索膜结构","ABC",{"id":260,"libraryId":5,"type":55,"typeLabel":56,"stem":261,"options":262,"answer":20,"analysis":37},1145746,"（2020年真题）单位工程验收时的项目组织负责人是()。",[263,265,267,269],{"key":20,"text":264,"correct":22},"建设单位项目负责人",{"key":24,"text":266,"correct":29},"施工单位项目负责人",{"key":27,"text":268,"correct":29},"监理单位项目负责人",{"key":31,"text":270,"correct":29},"设计单位项目负责人",{"id":272,"libraryId":5,"type":55,"typeLabel":56,"stem":273,"options":274,"answer":24,"analysis":37},1145747,"工程竣工验收合格之日起最多（ ）日内，建设单位应向当地建设行政主管部门备案。（2013年）",[275,277,278,280],{"key":20,"text":276,"correct":29},"7",{"key":24,"text":49,"correct":22},{"key":27,"text":279,"correct":29},"30",{"key":31,"text":281,"correct":29},"90",{"id":283,"libraryId":5,"type":55,"typeLabel":56,"stem":284,"options":285,"answer":31,"analysis":37},1145748,"正常使用条件下，节能保温工程的最低保修期限为（ ）年。（2013 年真题）",[286,288,290,292],{"key":20,"text":287,"correct":29},"2",{"key":24,"text":289,"correct":29},"3",{"key":27,"text":291,"correct":29},"4",{"key":31,"text":293,"correct":22},"5",{"id":295,"libraryId":5,"type":55,"typeLabel":56,"stem":296,"options":297,"answer":24,"analysis":37},1145749,"建设工程的保修期自（ ）之日起计算。（2016 年真题）",[298,300,302,304],{"key":20,"text":299,"correct":29},"施工完成",{"key":24,"text":301,"correct":22},"竣工验收合格",{"key":27,"text":303,"correct":29},"竣工验收备案",{"key":31,"text":305,"correct":29},"工程移交",{"id":307,"libraryId":5,"type":55,"typeLabel":56,"stem":308,"options":309,"answer":20,"analysis":37},1145750,"按新建民用建筑节能管理的要求，可不进行节能查验的材料或设备是（ ）。（2016 年真题）",[310,312,314,316],{"key":20,"text":311,"correct":22},"结构材料",{"key":24,"text":313,"correct":29},"保温材料",{"key":27,"text":315,"correct":29},"制冷系统",{"key":31,"text":317,"correct":29},"照明设备",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":332,"analysis":37},1145751,"建筑工程室内装饰装修需要增加的楼面荷载超过设计标准或者规范规定限值时，应当由（ ）提出设 计方案。（2014 年真题）",[322,324,326,328,330],{"key":20,"text":323,"correct":22},"原设计单位",{"key":24,"text":325,"correct":29},"城市规划行政主管部门",{"key":27,"text":327,"correct":29},"建设行政主管部门",{"key":31,"text":329,"correct":29},"房屋的物业管理单位",{"key":34,"text":331,"correct":22},"具有相应资质等级的设计单位","AE",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":332,"analysis":37},1145752,"建筑工程室内装饰装修需要增加的楼面荷载超过设计标准或者规范规定限值时，应当由()提出设计方案。2014年",[337,338,339,340,341],{"key":20,"text":323,"correct":22},{"key":24,"text":325,"correct":29},{"key":27,"text":327,"correct":29},{"key":31,"text":329,"correct":29},{"key":34,"text":331,"correct":22},{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":356,"analysis":37},1145753,"关于施工单位项目负责人安全生产责任的说法，正确的有（ ）。（2012 年真题）",[346,348,350,352,354],{"key":20,"text":347,"correct":29},"制定施工单位安全生产责任制度",{"key":24,"text":349,"correct":22},"对建设工程项目的安全施工负责",{"key":27,"text":351,"correct":22},"落实安全生产规章制度",{"key":31,"text":353,"correct":22},"确保安全生产费用的有效使用",{"key":34,"text":355,"correct":22},"及时如实报告生产安全事故","BCDE",{"id":358,"libraryId":5,"type":55,"typeLabel":56,"stem":359,"options":360,"answer":27,"analysis":37},1145754,"根据《危险性较大的分部分项工程安全管理办法》，由专业承包单位编制，经审核合格且不需要专家认证的专项施工方案，经（ ）签字后报监理单位，由项目总监理工程师审核签字后实施。（2012 年真题）",[361,363,365,367],{"key":20,"text":362,"correct":29},"建设单位项目负责人和专业承包单位项目负责人",{"key":24,"text":364,"correct":29},"总承包单位项目负责人和项目技术负责人",{"key":27,"text":366,"correct":22},"总承包单位技术负责人和专业承包单位技术负责人",{"key":31,"text":368,"correct":29},"总承包单位项目技术负责人和专业承包单位项目负责人",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":117,"analysis":37},1145755,"下列分部分项工程中，其专项施工方案必须进行专家论证的有（ ）。（2014 年真题）",[373,375,377,379,381],{"key":20,"text":374,"correct":22},"架体高度23m 的悬挑脚手架",{"key":24,"text":376,"correct":29},"开挖深度10m 的人工挖孔桩",{"key":27,"text":378,"correct":22},"爬升高度80m 的爬模",{"key":31,"text":380,"correct":22},"埋深10m 的地下暗挖",{"key":34,"text":382,"correct":22},"开挖深度5m 的无支护土方开挖工程",{"id":384,"libraryId":5,"type":55,"typeLabel":56,"stem":385,"options":386,"answer":27,"analysis":37},1145756,"不适合用来检测钢筋直螺纹接头加工精度的是（ ）。2017真题",[387,389,391,393],{"key":20,"text":388,"correct":29},"通规",{"key":24,"text":390,"correct":29},"止规",{"key":27,"text":392,"correct":22},"直尺",{"key":31,"text":394,"correct":29},"量规",{"id":396,"libraryId":5,"type":55,"typeLabel":56,"stem":397,"options":398,"answer":20,"analysis":37},1145757,"关于室内装饰装修材料使用的说法，符合《建筑内部装修设计防火规范》规定的是（ ）。2017真题",[399,401,403,405],{"key":20,"text":400,"correct":22},"顶棚采用多孔塑料板时，其厚度不应大于15mm",{"key":24,"text":402,"correct":29},"图书室顶棚可采用B1级装饰装修材料",{"key":27,"text":404,"correct":29},"大型电子计算机机房地面可以采用B2级装修材料",{"key":31,"text":406,"correct":29},"配电室内部装修均应采用B1级及以上装修材料",{"id":408,"libraryId":5,"type":55,"typeLabel":56,"stem":409,"options":410,"answer":20,"analysis":37},1145758,"建筑高度110m的外墙保温材料的燃烧性能等级应为（ ）。2017真题",[411,413,415,417],{"key":20,"text":412,"correct":22},"A级",{"key":24,"text":414,"correct":29},"A或B1级",{"key":27,"text":416,"correct":29},"B1级",{"key":31,"text":418,"correct":29},"B2级",{"id":420,"libraryId":5,"type":55,"typeLabel":56,"stem":421,"options":422,"answer":31,"analysis":37},1145759,"根据《民用建筑工程室内环境污染控制规范》（GB 50325），室内环境污染控制要求属于Ⅰ类的是（ ）。 （2012 年真题）",[423,425,427,429],{"key":20,"text":424,"correct":29},"办公楼",{"key":24,"text":426,"correct":29},"图书馆",{"key":27,"text":428,"correct":29},"体育馆",{"key":31,"text":430,"correct":22},"学校教室",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":36,"analysis":37},1145760,"根据《建筑地基基础工程施工质量验收规范》（GB 50202），属于一级基坑的有（ ）。（2012 年真题）",[435,437,439,441,443],{"key":20,"text":436,"correct":22},"重要工程的基坑",{"key":24,"text":438,"correct":22},"支护结构做主体结构一部分的基坑",{"key":27,"text":440,"correct":29},"开挖深度8 米的基坑",{"key":31,"text":442,"correct":29},"与邻近建筑物质距离在开挖深度以外的基坑",{"key":34,"text":444,"correct":22},"基坑范围内有历史文物需严加保护的基坑",{"id":446,"libraryId":5,"type":55,"typeLabel":56,"stem":447,"options":448,"answer":24,"analysis":37},1145761,"燃烧性能等级为B1 级的装修材料其燃烧性为（ ）。（2015 年真题）",[449,451,453,455],{"key":20,"text":450,"correct":29},"不燃",{"key":24,"text":452,"correct":22},"难燃",{"key":27,"text":454,"correct":29},"可燃",{"key":31,"text":456,"correct":29},"易燃",{"id":458,"libraryId":5,"type":55,"typeLabel":56,"stem":459,"options":460,"answer":24,"analysis":37},1145762,"厕浴间楼板周边上翻混凝土的强度等级最低应为（ ）。（2014 年真题）",[461,463,465,467],{"key":20,"text":462,"correct":29},"C15",{"key":24,"text":464,"correct":22},"C20",{"key":27,"text":466,"correct":29},"C25",{"key":31,"text":468,"correct":29},"C30",{"id":470,"libraryId":5,"type":55,"typeLabel":56,"stem":471,"options":472,"answer":20,"analysis":37},1145763,"关于合同评审的说法，错误的是（ ）。（2013 年真题）",[473,475,477,479],{"key":20,"text":474,"correct":22},"合同评审应在合同签订后进行",{"key":24,"text":476,"correct":29},"合同评审包括合同风险评估",{"key":27,"text":478,"correct":29},"应评审招标文件的完备性",{"key":31,"text":480,"correct":29},"合同发生重大变故后评审",{"id":482,"libraryId":5,"type":55,"typeLabel":56,"stem":483,"options":484,"answer":31,"analysis":37},1145764,"某工地食堂发生食物中毒事故，其处理步骤包括：①报告中毒事故；②事故调查；③事故处理；④处理事故责任者；⑤提交调查报告。下列处理顺序正确的是（ ）。（2014 年真题）",[485,487,489,491],{"key":20,"text":486,"correct":29},"①④②③⑤",{"key":24,"text":488,"correct":29},"②⑤④③①",{"key":27,"text":490,"correct":29},"②④③①⑤",{"key":31,"text":492,"correct":22},"①③②④⑤",{"id":494,"libraryId":5,"type":55,"typeLabel":56,"stem":495,"options":496,"answer":24,"analysis":37},1145765,"成型钢筋在进场时无需复验的项目是（ ）。（2016 年真题）",[497,499,501,503],{"key":20,"text":498,"correct":29},"抗拉强度",{"key":24,"text":500,"correct":22},"弯曲性能",{"key":27,"text":502,"correct":29},"伸长率",{"key":31,"text":504,"correct":29},"重量偏差",{"id":506,"libraryId":5,"type":55,"typeLabel":56,"stem":507,"options":508,"answer":20,"analysis":37},1145766,"氡是一种无色、无味、无法察觉的惰性气体，主要从（ ）等材料中所出。（2016 年真题）",[509,511,513,515],{"key":20,"text":510,"correct":22},"大理石",{"key":24,"text":512,"correct":29},"油漆涂料",{"key":27,"text":514,"correct":29},"符合地板",{"key":31,"text":516,"correct":29},"化纤地毯",{"id":518,"libraryId":5,"type":55,"typeLabel":56,"stem":519,"options":520,"answer":24,"analysis":37},1145767,"施工组织总设计应由总承包单位（ ）审批。（2013 年真题）",[521,523,525,527],{"key":20,"text":522,"correct":29},"负责人",{"key":24,"text":524,"correct":22},"技术负责人",{"key":27,"text":526,"correct":29},"项目负责人",{"key":31,"text":528,"correct":29},"项目技术负责人",{"id":530,"libraryId":5,"type":55,"typeLabel":56,"stem":531,"options":532,"answer":20,"analysis":37},1145768,"（2019真题）疏散楼梯前室顶棚的装修材料燃烧性能等级应是（ ）。",[533,534,535,536],{"key":20,"text":412,"correct":22},{"key":24,"text":416,"correct":29},{"key":27,"text":418,"correct":29},{"key":31,"text":537,"correct":29},"B3级",{"id":539,"libraryId":5,"type":55,"typeLabel":56,"stem":540,"options":541,"answer":27,"analysis":37},1145769,"（2019真题）民用建筑工程室内用饰面人造木板必须测定（ ）。 A、苯的含量",[542,544,546,548],{"key":20,"text":543,"correct":29},"挥发性有机化合物（VO",{"key":24,"text":545,"correct":29},"含量",{"key":27,"text":547,"correct":22},"游离甲醛含量或游离甲醛释放量",{"key":31,"text":549,"correct":29},"甲苯＋二甲苯含量",{"id":551,"libraryId":5,"type":55,"typeLabel":56,"stem":552,"options":553,"answer":24,"analysis":37},1145770,"利用绿化代替场地硬化，属于绿色工程施工中的（ ）。2017真题",[554,556,558,560],{"key":20,"text":555,"correct":29},"节材与材料资源利用",{"key":24,"text":557,"correct":22},"节地与施工用地保护",{"key":27,"text":559,"correct":29},"节能与能源利用",{"key":31,"text":561,"correct":29},"节水与水资源利用",{"id":563,"libraryId":5,"type":55,"typeLabel":56,"stem":564,"options":565,"answer":27,"analysis":37},1145771,"（2020年真题）根据《建筑设计防火规范》，墙面装饰材料燃烧性能等级属于A级的场所是()。",[566,568,569,571],{"key":20,"text":567,"correct":29},"宾馆",{"key":24,"text":424,"correct":29},{"key":27,"text":570,"correct":22},"医院病房",{"key":31,"text":572,"correct":29},"住宅楼",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":586,"analysis":37},1145772,"（2020年真题）根据控制室内环境的不同要求，属于I类民用建筑工程的有()。",[577,579,581,583,584],{"key":20,"text":578,"correct":29},"餐厅",{"key":24,"text":580,"correct":22},"老年建筑",{"key":27,"text":582,"correct":29},"理发店",{"key":31,"text":430,"correct":22},{"key":34,"text":585,"correct":29},"旅馆","BD",{"id":588,"libraryId":5,"type":55,"typeLabel":56,"stem":589,"options":590,"answer":24,"analysis":37},1145773,"楼梯踏步最小宽度不应小于0.28m的是()的楼梯。2013年",[591,593,595,597],{"key":20,"text":592,"correct":29},"幼儿园",{"key":24,"text":594,"correct":22},"医院",{"key":27,"text":596,"correct":29},"住宅套内",{"key":31,"text":598,"correct":29},"专用疏散",{"id":600,"libraryId":5,"type":55,"typeLabel":56,"stem":601,"options":602,"answer":27,"analysis":37},1145774,"环境类别和作用等级为I- B，设计使用年限50年的普通住宅工程，其结构混凝土的强度等级不应低于()。2013年",[603,604,605,606],{"key":20,"text":464,"correct":29},{"key":24,"text":466,"correct":29},{"key":27,"text":468,"correct":22},{"key":31,"text":607,"correct":29},"C35",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":117,"analysis":37},1145775,"关于地面工程基层铺设的做法，正确的有（ ） 2011年",[612,614,616,618,620],{"key":20,"text":613,"correct":22},"灰土垫层采用熟化石灰与黏土(或粉质黏土、粉土)的拌和料铺设",{"key":24,"text":615,"correct":29},"三合土垫层采用石灰、碎石土与碎砖的拌和料铺设",{"key":27,"text":617,"correct":22},"四合土垫层采用水泥、石灰、砂土与碎砖的拌和料铺设",{"key":31,"text":619,"correct":22},"炉渣垫层采用炉渣或水泥、石灰与炉渣的拌和料铺设",{"key":34,"text":621,"correct":22},"水泥混凝土垫层铺设，当气温长期处于0℃以下，设计无要求时，垫层应设置伸缩缝",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":36,"analysis":37},1145776,"根据《建筑地基基础工程施工质量验收规范》（GB 50202），属于一级基坑的有（）。",[626,627,628,630,631],{"key":20,"text":436,"correct":22},{"key":24,"text":438,"correct":22},{"key":27,"text":629,"correct":29},"开挖深度8米的基坑",{"key":31,"text":442,"correct":29},{"key":34,"text":444,"correct":22},{"id":633,"libraryId":5,"type":55,"typeLabel":56,"stem":634,"options":635,"answer":27,"analysis":37},1145777,"根据《建筑基坑支护技术规程》的规定，钢筋混凝土支撑构件的混凝土强度等级不应低于()。2012年",[636,637,638,639],{"key":20,"text":462,"correct":29},{"key":24,"text":464,"correct":29},{"key":27,"text":466,"correct":22},{"key":31,"text":468,"correct":29},[641,644,647,650,653,656],{"id":55,"name":642,"category":7,"favorite":643},"领导干部任职前廉政法规知识测试题",92,{"id":645,"name":646,"category":7,"favorite":55},595,"建筑结构与设备",{"id":648,"name":649,"category":7,"favorite":55},715,"招标采购专业知识与法律法规",{"id":651,"name":652,"category":7,"favorite":55},848,"市政方向-通用基础",{"id":654,"name":655,"category":7,"favorite":8},534,"BIM工程师",{"id":657,"name":655,"category":7,"favorite":8},535]