[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-46":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":642},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,46,50,2362,[13,38,53,68,82,94,108,120,132,143,157,169,184,196,208,220,232,247,255,270,284,299,311,323,335,344,358,366,378,390,402,417,429,437,452,461,473,485,497,508,521,532,541,553,563,575,589,603,615,627],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1145677,2,"多选题","下列安全事故类型中，属于建筑业五大事故类型的有（ ）。（2013 年真题）",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","高处坠落",true,{"key":24,"text":25,"correct":22},"B","物体打击",{"key":27,"text":28,"correct":22},"C","触电",{"key":30,"text":31,"correct":32},"D","中毒",false,{"key":34,"text":35,"correct":32},"E","爆炸","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1145678,"现场临时用水包括（ ）。2017真题",[42,44,46,48,50],{"key":20,"text":43,"correct":32},"生产用水",{"key":24,"text":45,"correct":22},"生活用水",{"key":27,"text":47,"correct":22},"施工用水",{"key":30,"text":49,"correct":22},"机械用水",{"key":34,"text":51,"correct":22},"消防用水","BCDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1145679,"现场计算临时总用水量应包括（ ）。2017真题",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"施工用水量",{"key":24,"text":60,"correct":22},"消防用水量",{"key":27,"text":62,"correct":22},"施工机械用水量",{"key":30,"text":64,"correct":32},"商品混凝土拌合用水量",{"key":34,"text":66,"correct":22},"临水管道水量损失量","ABCE",{"id":69,"libraryId":5,"type":70,"typeLabel":71,"stem":72,"options":73,"answer":20,"analysis":37},1145680,1,"单选题","某工程现场临时用水总量为Q=14.8L\u002Fs，管网中水流速度v=1.8m\u002Fs，该工程现场施工用水的供水管径宜选用()mm水管。",[74,76,78,80],{"key":20,"text":75,"correct":22},"100",{"key":24,"text":77,"correct":32},"150",{"key":27,"text":79,"correct":32},"200",{"key":30,"text":81,"correct":32},"250",{"id":83,"libraryId":5,"type":70,"typeLabel":71,"stem":84,"options":85,"answer":27,"analysis":37},1145681,"（2019真题）某临时用水支管耗水量A=1.92L\u002Fs，管网水流速度V=2m\u002Fs，则计算水管直径d为（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":32},"25mm",{"key":24,"text":89,"correct":32},"30mm",{"key":27,"text":91,"correct":22},"35mm",{"key":30,"text":93,"correct":32},"50mm",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":67,"analysis":37},1145682,"（2020年真题）关于高温天气施工的说法，正确的有()。",[98,100,102,104,106],{"key":20,"text":99,"correct":22},"现场拌制砂浆随拌随用",{"key":24,"text":101,"correct":22},"打密封胶时环境温度不宜超过35°C",{"key":27,"text":103,"correct":22},"大体积防水混凝土浇筑入模温度不应高于30°C",{"key":30,"text":105,"correct":32},"不应进行钢结构安装",{"key":34,"text":107,"correct":22},"混凝土的坍落度不宜小于70mm",{"id":109,"libraryId":5,"type":70,"typeLabel":71,"stem":110,"options":111,"answer":20,"analysis":37},1145683,"关于施工现场临时用电管理的说法，正确的是（）。2018真题",[112,114,116,118],{"key":20,"text":113,"correct":22},"现场电工必须经相关部门考核合格后，持证上岗",{"key":24,"text":115,"correct":32},"用电设备拆除时，可由安全员完成",{"key":27,"text":117,"correct":32},"用电设备总容量在50kW及以上，应制定用电防火措施",{"key":30,"text":119,"correct":32},"装饰装修阶段用电参照用电组织设计执行",{"id":121,"libraryId":5,"type":70,"typeLabel":71,"stem":122,"options":123,"answer":27,"analysis":37},1145684,"施工现场临时配电系统中，保护零线(P E)的配线颜色应为()。2014年",[124,126,128,130],{"key":20,"text":125,"correct":32},"黄色",{"key":24,"text":127,"correct":32},"绿色",{"key":27,"text":129,"correct":22},"绿／黄双色",{"key":30,"text":131,"correct":32},"淡蓝色",{"id":133,"libraryId":5,"type":70,"typeLabel":71,"stem":134,"options":135,"answer":27,"analysis":37},1145685,"（2019真题）施工现场五芯电缆中用作N线的标识色是（ ）。",[136,137,139,141],{"key":20,"text":127,"correct":32},{"key":24,"text":138,"correct":32},"红色",{"key":27,"text":140,"correct":22},"蓝色",{"key":30,"text":142,"correct":32},"黄绿色",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":36,"analysis":37},1145686,"关于施工现场配电系统设置的说法，正确的有（）。",[147,149,151,153,155],{"key":20,"text":148,"correct":22},"配电系统应采用配电柜或总配电箱、分配电箱、开关箱三级配电方式",{"key":24,"text":150,"correct":22},"分配电箱与开关箱的距离不得超过30m",{"key":27,"text":152,"correct":22},"开关箱与其控制的固定式用电设备的水平距离不宜超过3m",{"key":30,"text":154,"correct":32},"同一个开关箱最多只可以直接控制2台用电设备",{"key":34,"text":156,"correct":32},"固定式配电箱的中心点与地面的垂直距离应为0.8～1.6m",{"id":158,"libraryId":5,"type":70,"typeLabel":71,"stem":159,"options":160,"answer":27,"analysis":37},1145687,"（2020年真题）施工现场临时用电配电箱金属箱门与金属箱件的连接材料正确的是()。",[161,163,165,167],{"key":20,"text":162,"correct":32},"单股铜线",{"key":24,"text":164,"correct":32},"绝缘多股铜线",{"key":27,"text":166,"correct":22},"编织软铜线",{"key":30,"text":168,"correct":32},"铜绞线",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},1145688,"下列参数中，属于流水施工参数的有（ ）。（2014 年真题）",[173,175,177,179,181],{"key":20,"text":174,"correct":32},"技术参数",{"key":24,"text":176,"correct":22},"空间参数",{"key":27,"text":178,"correct":22},"工艺参数",{"key":30,"text":180,"correct":32},"设计参数",{"key":34,"text":182,"correct":22},"时间参数","BCE",{"id":185,"libraryId":5,"type":70,"typeLabel":71,"stem":186,"options":187,"answer":30,"analysis":37},1145689,"下列流水施工参数中，不属于时间参数的是（ ）。（2013 年真题）",[188,190,192,194],{"key":20,"text":189,"correct":32},"流水节拍",{"key":24,"text":191,"correct":32},"流水步距",{"key":27,"text":193,"correct":32},"工期",{"key":30,"text":195,"correct":22},"流水强度",{"id":197,"libraryId":5,"type":70,"typeLabel":71,"stem":198,"options":199,"answer":30,"analysis":37},1145690,"关于等节奏流水施工的说法，错误的是（ ）。（2015 年真题）",[200,202,204,206],{"key":20,"text":201,"correct":32},"各施工过程在各个施工段流水节拍相等",{"key":24,"text":203,"correct":32},"相邻施工过程的流水步距相等",{"key":27,"text":205,"correct":32},"专业工作队数等于施工过程数",{"key":30,"text":207,"correct":22},"各专业工作队在各施工段上不能连续作业",{"id":209,"libraryId":5,"type":70,"typeLabel":71,"stem":210,"options":211,"answer":27,"analysis":37},1145691,"下列流水施工的基本组织形式中，其专业工作队数大于施工过程数的是（ ）。（2014 年真题）",[212,214,216,218],{"key":20,"text":213,"correct":32},"等节奏流水施工",{"key":24,"text":215,"correct":32},"异步距异节奏流水施工",{"key":27,"text":217,"correct":22},"等步距异节奏流水施工",{"key":30,"text":219,"correct":32},"无节奏流水施工",{"id":221,"libraryId":5,"type":70,"typeLabel":71,"stem":222,"options":223,"answer":27,"analysis":37},1145692,"项目质量管理程序的第一步是()。2014年",[224,226,228,230],{"key":20,"text":225,"correct":32},"收集分析质量信息并制定预防措施",{"key":24,"text":227,"correct":32},"编制项目质量计划",{"key":27,"text":229,"correct":22},"明确项目质量目标",{"key":30,"text":231,"correct":32},"实施项目质量计划",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":246,"analysis":37},1145693,"施工总承包单位可以依法将承包范围内的（ ）工程分包给具有相应专业资质的企业。（2014 年 ）",[236,238,240,242,244],{"key":20,"text":237,"correct":32},"地下室混凝土结构",{"key":24,"text":239,"correct":32},"填充墙砌筑作业",{"key":27,"text":241,"correct":32},"混凝土框架结构",{"key":30,"text":243,"correct":22},"机电设备安装",{"key":34,"text":245,"correct":22},"玻璃幕墙","DE",{"id":248,"libraryId":5,"type":70,"typeLabel":71,"stem":249,"options":250,"answer":27,"analysis":37},1145694,"项目质量管理程序的第一步是（ ）。（2014 年真题）",[251,252,253,254],{"key":20,"text":225,"correct":32},{"key":24,"text":227,"correct":32},{"key":27,"text":229,"correct":22},{"key":30,"text":231,"correct":32},{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":269,"analysis":37},1145695,"下列工程质量验收中，属于主体结构子分部工程的有（ ）。（2012 年真题）",[259,261,263,265,267],{"key":20,"text":260,"correct":32},"现浇结构",{"key":24,"text":262,"correct":22},"砌体结构",{"key":27,"text":264,"correct":22},"钢结构",{"key":30,"text":266,"correct":22},"木结构",{"key":34,"text":268,"correct":32},"装配式结构","BCD",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":36,"analysis":37},1145696,"根据《建筑工程施工质量验收统一标准（GB50300-2013），属于主体结构分部的有（ ）。（2016年真题）",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"混凝土结构",{"key":24,"text":277,"correct":22},"型钢混凝土结构",{"key":27,"text":279,"correct":22},"铝合金结构",{"key":30,"text":281,"correct":32},"劲钢（管）混凝土结构",{"key":34,"text":283,"correct":32},"网架和索膜结构",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":298,"analysis":37},1145697,"下列混凝土灌注桩桩质量检查项目中，在混凝土浇筑前进行检查的有（ ）。（2014 年真题）",[288,290,292,294,296],{"key":20,"text":289,"correct":22},"孔深",{"key":24,"text":291,"correct":22},"孔径",{"key":27,"text":293,"correct":32},"桩身完整性",{"key":30,"text":295,"correct":32},"承载力",{"key":34,"text":297,"correct":22},"沉渣厚度","ABE",{"id":300,"libraryId":5,"type":70,"typeLabel":71,"stem":301,"options":302,"answer":24,"analysis":37},1145698,"混凝土材料进场复试中，当有氯离子含量要求时，首先需要检验氯化物含量的是（ ）。2017真题",[303,305,307,309],{"key":20,"text":304,"correct":32},"粉煤灰",{"key":24,"text":306,"correct":22},"外加剂",{"key":27,"text":308,"correct":32},"碎石",{"key":30,"text":310,"correct":32},"河砂",{"id":312,"libraryId":5,"type":70,"typeLabel":71,"stem":313,"options":314,"answer":27,"analysis":37},1145699,"关于施工现场材料检验的说法，正确的是（ ）。2017真题",[315,317,319,321],{"key":20,"text":316,"correct":32},"建筑材料复试送检的检测试样可以在施工现场外抽取",{"key":24,"text":318,"correct":32},"工程取样送检见证人由监理单位书面确认",{"key":27,"text":320,"correct":22},"施工单位的验证不能代替建设单位所采购物资的质量责任",{"key":30,"text":322,"correct":32},"建设单位的验证可以代替施工单位所采购物资的质量责任",{"id":324,"libraryId":5,"type":70,"typeLabel":71,"stem":325,"options":326,"answer":30,"analysis":37},1145700,"下列质量问题常见成因中，属于管理事故成因的是（）。2012年",[327,329,331,333],{"key":20,"text":328,"correct":32},"预埋件偏位",{"key":24,"text":330,"correct":32},"不均匀沉降",{"key":27,"text":332,"correct":32},"防水材料质量不合格",{"key":30,"text":334,"correct":22},"分部分项工程施工顺序不当",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":269,"analysis":37},1145701,"下列工程质量验收中，属于主体结构子分部工程的有（）。2018真题 2012年",[339,340,341,342,343],{"key":20,"text":260,"correct":32},{"key":24,"text":262,"correct":22},{"key":27,"text":264,"correct":22},{"key":30,"text":266,"correct":22},{"key":34,"text":268,"correct":32},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":298,"analysis":37},1145702,"根据《建筑施工安全检查标准》JGJ59-2011，《模板支架检查评分表》保证项目有（ ）。（2015 年真题）",[348,350,352,354,356],{"key":20,"text":349,"correct":22},"施工方案",{"key":24,"text":351,"correct":22},"支架构造",{"key":27,"text":353,"correct":32},"底座与拖撑",{"key":30,"text":355,"correct":32},"构配件材质",{"key":34,"text":357,"correct":22},"支架稳定",{"id":359,"libraryId":5,"type":70,"typeLabel":71,"stem":360,"options":361,"answer":30,"analysis":37},1145703,"下列质量问题常见成因中，属于管理事故成因的是（ ）。（2012 年真题）",[362,363,364,365],{"key":20,"text":328,"correct":32},{"key":24,"text":330,"correct":32},{"key":27,"text":332,"correct":32},{"key":30,"text":334,"correct":22},{"id":367,"libraryId":5,"type":70,"typeLabel":71,"stem":368,"options":369,"answer":30,"analysis":37},1145704,"自坍塌事故发生之日起（ ）天内，事故造成的伤亡人数发生变化的，应当及时补报。（2015 年真题）",[370,372,374,376],{"key":20,"text":371,"correct":32},"7",{"key":24,"text":373,"correct":32},"14",{"key":27,"text":375,"correct":32},"15",{"key":30,"text":377,"correct":22},"30",{"id":379,"libraryId":5,"type":70,"typeLabel":71,"stem":380,"options":381,"answer":30,"analysis":37},1145705,"下列砌体结构墙体裂缝现象中，主要原因不是地基不均匀下沉引起的是（ ）。（2016 年真题）",[382,384,386,388],{"key":20,"text":383,"correct":32},"纵墙两端出现斜裂缝",{"key":24,"text":385,"correct":32},"裂缝通过窗口两个对角",{"key":27,"text":387,"correct":32},"窗间墙出现水平裂缝",{"key":30,"text":389,"correct":22},"窗间墙出现竖向裂缝",{"id":391,"libraryId":5,"type":70,"typeLabel":71,"stem":392,"options":393,"answer":24,"analysis":37},1145706,"施工现场的定期安全检查应由（）组织。2012年",[394,396,398,400],{"key":20,"text":395,"correct":32},"企业技术或安全负责人",{"key":24,"text":397,"correct":22},"项目经理",{"key":27,"text":399,"correct":32},"项目专职安全员",{"key":30,"text":401,"correct":32},"项目技术负责人",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":416,"analysis":37},1145707,"（2020年真题）事故应急救援预案提出的技术措施和组织措施应()。",[406,408,410,412,414],{"key":20,"text":407,"correct":22},"详尽",{"key":24,"text":409,"correct":32},"真实",{"key":27,"text":411,"correct":32},"及时",{"key":30,"text":413,"correct":22},"明确",{"key":34,"text":415,"correct":22},"有效","ADE",{"id":418,"libraryId":5,"type":70,"typeLabel":71,"stem":419,"options":420,"answer":20,"analysis":37},1145709,"气焊电石起火时，可以采用的灭火材料或器材是（ ）。（2015 年真题）",[421,423,425,427],{"key":20,"text":422,"correct":22},"干砂",{"key":24,"text":424,"correct":32},"水",{"key":27,"text":426,"correct":32},"四氯化碳灭火器",{"key":30,"text":428,"correct":32},"泡沫灭火器",{"id":430,"libraryId":5,"type":70,"typeLabel":71,"stem":431,"options":432,"answer":24,"analysis":37},1145710,"施工现场的定期安全检查应由（ ）组织。（2012 年真题）",[433,434,435,436],{"key":20,"text":395,"correct":32},{"key":24,"text":397,"correct":22},{"key":27,"text":399,"correct":32},{"key":30,"text":401,"correct":32},{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":451,"analysis":37},1145711,"关于后张预应力混凝土模板拆除的说法，正确的有（ ）。（2013 年真题）",[441,443,445,447,449],{"key":20,"text":442,"correct":22},"梁侧模应在预应力张拉前拆除",{"key":24,"text":444,"correct":32},"梁侧模应在预应力张拉后拆除",{"key":27,"text":446,"correct":22},"混凝土强度达到侧模拆除条件即可拆除测模",{"key":30,"text":448,"correct":32},"梁底模应在预应力张拉前拆除",{"key":34,"text":450,"correct":22},"梁底模应在预应力张拉后拆除","ACE",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":36,"analysis":37},1145712,"下列安全事故类型中，属于建筑业最常发生的五种事故的有()。2013年",[456,457,458,459,460],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":22},{"key":30,"text":31,"correct":32},{"key":34,"text":35,"correct":32},{"id":462,"libraryId":5,"type":70,"typeLabel":71,"stem":463,"options":464,"answer":24,"analysis":37},1145713,"关于招标投标的说法，正确的是（ ）。（2016 年真题）",[465,467,469,471],{"key":20,"text":466,"correct":32},"招标分为公开招标，邀请招标和议标",{"key":24,"text":468,"correct":22},"投标人少于三家应重新投标",{"key":27,"text":470,"correct":32},"多个法人不可以联合投标",{"key":30,"text":472,"correct":32},"招标人答疑仅需书面回复提出疑问的投标人",{"id":474,"libraryId":5,"type":70,"typeLabel":71,"stem":475,"options":476,"answer":24,"analysis":37},1145714,"根据《建筑安装工程费用项目组成》（建标[2013]44号）规定，以下费用属于规费的是（）。2018真题",[477,479,481,483],{"key":20,"text":478,"correct":32},"印花税",{"key":24,"text":480,"correct":22},"工程排污费",{"key":27,"text":482,"correct":32},"工会经费",{"key":30,"text":484,"correct":32},"检验试验费",{"id":486,"libraryId":5,"type":70,"typeLabel":71,"stem":487,"options":488,"answer":20,"analysis":37},1145715,"关于正铲挖掘机挖土特点的说法，正确的是（ ）。（2012 年真题）",[489,491,493,495],{"key":20,"text":490,"correct":22},"前进向上，强制切土",{"key":24,"text":492,"correct":32},"后退向下，强制切土",{"key":27,"text":494,"correct":32},"直上直下，自重切土",{"key":30,"text":496,"correct":32},"前进向上，自重切土",{"id":498,"libraryId":5,"type":70,"typeLabel":71,"stem":499,"options":500,"answer":20,"analysis":37},1145716,"根据《建筑安装工程费用项目组成》（建标[2003]206 号），不属于措施费的是（ ）。（2012 年真题）",[501,502,504,506],{"key":20,"text":480,"correct":22},{"key":24,"text":503,"correct":32},"文明施工费",{"key":27,"text":505,"correct":32},"环境保护费",{"key":30,"text":507,"correct":32},"安全施工费",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":36,"analysis":37},1145717,"关于施工现场配电系统装置的说法，正确的有（ ）。（2013 年真题）",[512,514,516,517,519],{"key":20,"text":513,"correct":22},"配电系统应采用配电柜或配电箱、分配电箱、开关箱三级配电方式",{"key":24,"text":515,"correct":22},"分配电箱与开关电箱的距离不得超过30m",{"key":27,"text":152,"correct":22},{"key":30,"text":518,"correct":32},"同一个开关箱最多只可以直接控制2 台用电设备",{"key":34,"text":520,"correct":32},"固定式配电箱的中心点与地面的垂直距离应为0.8-1.6m",{"id":522,"libraryId":5,"type":70,"typeLabel":71,"stem":523,"options":524,"answer":20,"analysis":37},1145718,"参评“建筑业新技术应用示范工程”的工程，应至少应用《建筑业十项新技术（2010）》推荐的建筑 新技术中的（ ）项。（2014 年真题）",[525,527,528,530],{"key":20,"text":526,"correct":22},"6",{"key":24,"text":371,"correct":32},{"key":27,"text":529,"correct":32},"8",{"key":30,"text":531,"correct":32},"9",{"id":533,"libraryId":5,"type":70,"typeLabel":71,"stem":534,"options":535,"answer":27,"analysis":37},1145719,"施工现场临时配电系统中，保护零线（P E）的配线颜色应为（ ）。（2014 年真题）",[536,537,538,540],{"key":20,"text":125,"correct":32},{"key":24,"text":127,"correct":32},{"key":27,"text":539,"correct":22},"绿\u002F黄双色",{"key":30,"text":131,"correct":32},{"id":542,"libraryId":5,"type":70,"typeLabel":71,"stem":543,"options":544,"answer":30,"analysis":37},1145720,"关于施工现场文明施工的说法，错误的是（ ）。（2016 年真题）",[545,547,549,551],{"key":20,"text":546,"correct":32},"现场宿舍必须设置开启式窗户",{"key":24,"text":548,"correct":32},"现场食堂必须办理卫生许可证",{"key":27,"text":550,"correct":32},"施工现场必须实行封闭管理",{"key":30,"text":552,"correct":22},"施工现场办公区与生活区必须分开设置",{"id":554,"libraryId":5,"type":70,"typeLabel":71,"stem":555,"options":556,"answer":27,"analysis":37},1145721,"主持编制“项目管理实施规划”的是（ ）。（2016 年真题）",[557,559,561,562],{"key":20,"text":558,"correct":32},"企业管理层",{"key":24,"text":560,"correct":32},"企业委托的管理单位",{"key":27,"text":397,"correct":22},{"key":30,"text":401,"correct":32},{"id":564,"libraryId":5,"type":70,"typeLabel":71,"stem":565,"options":566,"answer":27,"analysis":37},1145722,"下列施工场所中，照明电压不得超过12V 的是（ ）。（2016 年真题）",[567,569,571,573],{"key":20,"text":568,"correct":32},"地下车库",{"key":24,"text":570,"correct":32},"潮湿场所",{"key":27,"text":572,"correct":22},"金属容器内",{"key":30,"text":574,"correct":32},"人防工程",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":269,"analysis":37},1145723,"塔式起重机按固定方式进行分类可分为（ ）。（2016 年真题）",[579,581,583,585,587],{"key":20,"text":580,"correct":32},"伸缩式",{"key":24,"text":582,"correct":22},"轨道式",{"key":27,"text":584,"correct":22},"附墙式",{"key":30,"text":586,"correct":22},"内爬式",{"key":34,"text":588,"correct":32},"自升式",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":36,"analysis":37},1145724,"关于施工现场消防管理的说法，正确的有（ ）。（2015 年真题）",[593,595,597,599,601],{"key":20,"text":594,"correct":22},"动火证当日有效",{"key":24,"text":596,"correct":22},"施工现场严禁吸烟",{"key":27,"text":598,"correct":22},"应配备义务消防人员",{"key":30,"text":600,"correct":32},"易燃材料仓库应设在上风方向",{"key":34,"text":602,"correct":32},"油漆料库内应设置调料间",{"id":604,"libraryId":5,"type":70,"typeLabel":71,"stem":605,"options":606,"answer":27,"analysis":37},1145725,"建设工程项目费用偏差是指（）之差。( 2004)",[607,609,611,613],{"key":20,"text":608,"correct":32},"已完工程实际费用与计划工程预算费用",{"key":24,"text":610,"correct":32},"已完工程计划费用与计划工程预算费用",{"key":27,"text":612,"correct":22},"已完工作预算费用与已完工作实际费用",{"key":30,"text":614,"correct":32},"已完工程计划费用与计划工程实际费用",{"id":616,"libraryId":5,"type":70,"typeLabel":71,"stem":617,"options":618,"answer":27,"analysis":37},1145726,"成本偏差的控制的各工作步骤中，其核心是（）。( 2012年真题)",[619,621,623,625],{"key":20,"text":620,"correct":32},"比较",{"key":24,"text":622,"correct":32},"预测",{"key":27,"text":624,"correct":22},"纠偏",{"key":30,"text":626,"correct":32},"分析",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":641,"analysis":37},1145727,"建设工程项目施工成本控制的主要依据有（）。( 2012年真题)",[631,633,635,637,639],{"key":20,"text":632,"correct":22},"工程承包合同",{"key":24,"text":634,"correct":22},"进度报告",{"key":27,"text":636,"correct":22},"施工成本计划",{"key":30,"text":638,"correct":22},"工程变更",{"key":34,"text":640,"correct":32},"施工成本预测资料","ABCD",[643,646,649,652,655,658],{"id":70,"name":644,"category":7,"favorite":645},"领导干部任职前廉政法规知识测试题",92,{"id":647,"name":648,"category":7,"favorite":70},595,"建筑结构与设备",{"id":650,"name":651,"category":7,"favorite":70},715,"招标采购专业知识与法律法规",{"id":653,"name":654,"category":7,"favorite":70},848,"市政方向-通用基础",{"id":656,"name":657,"category":7,"favorite":8},534,"BIM工程师",{"id":659,"name":657,"category":7,"favorite":8},535]