[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":684},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,4,50,2362,[13,34,52,67,82,94,109,121,136,148,163,178,190,203,214,229,243,258,269,278,293,307,322,333,348,362,374,389,401,413,425,437,449,464,476,488,503,517,529,541,555,570,582,594,606,620,632,644,658,670],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1143170,1,"单选题","关于建筑物沉降观测的周期和时间的说法， 正确的是（）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","应在基础底板混凝土浇筑完毕后开始观测",false,{"key":24,"text":25,"correct":22},"B","民用高层建筑每加高1层观测1次",{"key":27,"text":28,"correct":22},"C","施工中若暂时停工，仅需在重新开工时观测1次",{"key":30,"text":31,"correct":32},"D","竣工后运营阶段，在第一年应观测3~4次",true,"",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1143172,2,"多选题","关于经纬仪的功能说法正确的是（）。",[40,42,44,46,48],{"key":20,"text":41,"correct":32},"主要功能是测量两个方向的水平夹角",{"key":24,"text":43,"correct":32},"可以测量竖直角",{"key":27,"text":45,"correct":32},"可以测量两点间的水平距离",{"key":30,"text":47,"correct":32},"可以测量两点间的高差",{"key":49,"text":50,"correct":22},"E","可以测量点的坐标","ABCD",{"id":53,"libraryId":5,"type":36,"typeLabel":37,"stem":54,"options":55,"answer":66,"analysis":33},1143175,"关于建筑在施工期间的变形测量要求的说法中， 正确的有（）。",[56,58,60,62,64],{"key":20,"text":57,"correct":22},"基坑工程均应进行基坑回弹观测",{"key":24,"text":59,"correct":32},"基坑支护结构位移观测应从基坑围护结构施工开始",{"key":27,"text":61,"correct":22},"基坑回弹观测应不少于2次，分别在基坑开挖之前与基坑挖好之后",{"key":30,"text":63,"correct":32},"沉降观测应在基础完工后和地下室砌完后开始",{"key":49,"text":65,"correct":22},"基坑变形观测的观测点应布置在基坑周边的中部、阴角处，间距不应大于20m，且每侧边不宜少于3个","BD",{"id":68,"libraryId":5,"type":36,"typeLabel":37,"stem":69,"options":70,"answer":81,"analysis":33},1143177,"下列属于一类土的有（）。",[71,73,75,77,79],{"key":20,"text":72,"correct":32},"砂土",{"key":24,"text":74,"correct":22},"黄土",{"key":27,"text":76,"correct":32},"淤泥",{"key":30,"text":78,"correct":22},"种植土",{"key":49,"text":80,"correct":22},"填土","AC",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1143179,"通常用来控制土的夯实标准的岩土物理力学性能指标是（）。",[86,88,90,92],{"key":20,"text":87,"correct":32},"土的干密度",{"key":24,"text":89,"correct":22},"土的天然密度",{"key":27,"text":91,"correct":22},"土的可松性",{"key":30,"text":93,"correct":22},"土的密实度",{"id":95,"libraryId":5,"type":36,"typeLabel":37,"stem":96,"options":97,"answer":108,"analysis":33},1143181,"当开挖宽度大、 当部分地段下部放坡不够时的浅基坑支护方法是（）。",[98,100,102,104,106],{"key":20,"text":99,"correct":22},"挡土灌注桩支护",{"key":24,"text":101,"correct":22},"型钢桩横挡板支撑",{"key":27,"text":103,"correct":32},"临时挡土墙支撑",{"key":30,"text":105,"correct":22},"叠袋式挡墙支护",{"key":49,"text":107,"correct":32},"短桩横隔板支撑","CE",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":20,"analysis":33},1143183,"关于喷射井点的特点说法中， 错误的是（）。",[113,115,117,119],{"key":20,"text":114,"correct":32},"设备较复杂",{"key":24,"text":116,"correct":22},"排水深度大",{"key":27,"text":118,"correct":22},"施工快，费用低",{"key":30,"text":120,"correct":22},"比多级轻型井点降水设备少，土方开挖量少",{"id":122,"libraryId":5,"type":36,"typeLabel":37,"stem":123,"options":124,"answer":135,"analysis":33},1143185,"关于土钉墙的构造要求说法， 正确的有（）。",[125,127,129,131,133],{"key":20,"text":126,"correct":32},"土钉墙坡比不宜大于1:0.2",{"key":24,"text":128,"correct":32},"土钉水平和竖向间距宜为1~2m",{"key":27,"text":130,"correct":32},"注浆用水泥浆强度等级不宜低于20MPa",{"key":30,"text":132,"correct":22},"土钉与加强钢筋宜采用绑扎连接",{"key":49,"text":134,"correct":22},"土钉墙宜采用机械成孔","ABC",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":24,"analysis":33},1143187,"关于土方开挖的顺序、 方法的说法， 正确的是（）。",[140,142,144,146],{"key":20,"text":141,"correct":22},"开槽支撑，先挖后撑，分层开挖，严禁超挖",{"key":24,"text":143,"correct":32},"开槽支撑，先撑后挖，分层开挖，严禁超挖",{"key":27,"text":145,"correct":22},"先挖后撑，开槽支撑，分层开挖，严禁超挖",{"key":30,"text":147,"correct":22},"先撑后挖，开槽支撑，分层开挖，严禁超挖",{"id":149,"libraryId":5,"type":36,"typeLabel":37,"stem":150,"options":151,"answer":162,"analysis":33},1143189,"基坑验槽时， 可以不进行轻型动力触探的情况有（）。",[152,154,156,158,160],{"key":20,"text":153,"correct":32},"承压水头可能高于基坑底面标高",{"key":24,"text":155,"correct":32},"基坑持力层为砾石层或卵石层且厚度大于1m",{"key":27,"text":157,"correct":22},"浅部有软弱下卧层",{"key":30,"text":159,"correct":22},"有浅埋的坑穴、古墓、古井等，直接观察难以发现时",{"key":49,"text":161,"correct":32},"基础持力层为均匀、密实砂层且厚度大于1.5m","ABE",{"id":164,"libraryId":5,"type":36,"typeLabel":37,"stem":165,"options":166,"answer":177,"analysis":33},1143192,"截水帷幕目前常用的形式有（）。",[167,169,171,173,175],{"key":20,"text":168,"correct":32},"高压喷射注浆",{"key":24,"text":170,"correct":32},"地下连续墙",{"key":27,"text":172,"correct":32},"小齿口钢板桩",{"key":30,"text":174,"correct":22},"井点降水法",{"key":49,"text":176,"correct":32},"深层水泥土搅拌桩","ABCE",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1143194,"宽度为 1.5m 的基坑（槽）， 进行轻型动力触探时， 检验深度宜为（） m。",[182,184,186,188],{"key":20,"text":183,"correct":22},"1.2",{"key":24,"text":185,"correct":32},"1.5",{"key":27,"text":187,"correct":22},"1.8",{"key":30,"text":189,"correct":22},"2.1",{"id":191,"libraryId":5,"type":36,"typeLabel":37,"stem":192,"options":193,"answer":135,"analysis":33},1143196,"填方土料应符合设计要求， 一般不能作为回填土的有（）。",[194,196,198,199,201],{"key":20,"text":195,"correct":32},"淤泥质土",{"key":24,"text":197,"correct":32},"有机质含量大于5%的土",{"key":27,"text":76,"correct":32},{"key":30,"text":200,"correct":22},"黏性土",{"key":49,"text":202,"correct":22},"砂砾坚土",{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":24,"analysis":33},1143198,"用来分析边坡稳定性的岩土物理力学性能指标是（）。",[207,209,211,213],{"key":20,"text":208,"correct":22},"粘聚力",{"key":24,"text":210,"correct":32},"内摩擦角",{"key":27,"text":212,"correct":22},"土抗剪强度",{"key":30,"text":93,"correct":22},{"id":215,"libraryId":5,"type":36,"typeLabel":37,"stem":216,"options":217,"answer":228,"analysis":33},1143200,"关于地下连续墙墙底注浆的说法， 正确的是（）。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"墙体混凝土强度达到设计要求75%后方可进行墙底注浆",{"key":24,"text":221,"correct":32},"单元槽内注浆管不应少于2根",{"key":27,"text":223,"correct":32},"注浆管下端应伸到槽底200~500mm",{"key":30,"text":225,"correct":32},"注浆压力应控制在2MPa以内",{"key":49,"text":227,"correct":22},"注浆总量达到设计要求80%以上时，可终止注浆","BCD",{"id":230,"libraryId":5,"type":36,"typeLabel":37,"stem":231,"options":232,"answer":162,"analysis":33},1143202,"关于地下连续墙支护的施工要求说法， 正确的有（）。",[233,235,237,239,241],{"key":20,"text":234,"correct":32},"适用于周边环境条件很复杂的深基坑",{"key":24,"text":236,"correct":32},"单元槽段长度宜为4~6m",{"key":27,"text":238,"correct":22},"钢筋笼吊放就位后应及时浇筑混凝土，间隔时间不宜大于2h",{"key":30,"text":240,"correct":22},"灌注混凝土时混凝土强度应按设计要求强度等级进行配制",{"key":49,"text":242,"correct":32},"墙顶宜高出设计标高300~500mm",{"id":244,"libraryId":5,"type":36,"typeLabel":37,"stem":245,"options":246,"answer":257,"analysis":33},1143204,"关于土钉墙施工要求的说法， 正确的有（）。",[247,249,251,253,255],{"key":20,"text":248,"correct":32},"土方分层开挖后，应在24h内完成土钉安放和喷射混凝土面层",{"key":24,"text":250,"correct":22},"上一层土钉完成注浆24h后方可开挖下层土方",{"key":27,"text":252,"correct":22},"灌浆型钢筋土钉应采用两次注浆工艺施工，第一次注浆初凝前进行第二次注浆",{"key":30,"text":254,"correct":22},"喷射混凝土面层时，同一分段内应自上而下进行",{"key":49,"text":256,"correct":32},"土钉筋体保护层厚度不应小于25mm","AE",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":27,"analysis":33},1143207,"周边环境条件很复杂的深基坑宜采用的支护形式是（）。",[262,264,266,267],{"key":20,"text":263,"correct":22},"排桩支护",{"key":24,"text":265,"correct":22},"水泥土桩墙",{"key":27,"text":170,"correct":32},{"key":30,"text":268,"correct":22},"逆作拱墙",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},1143209,"对基坑侧壁安全等级为一级的深基坑工程， 宜采取的支护形式为（）。",[273,274,275,277],{"key":20,"text":265,"correct":22},{"key":24,"text":263,"correct":32},{"key":27,"text":276,"correct":22},"土钉墙",{"key":30,"text":268,"correct":22},{"id":279,"libraryId":5,"type":36,"typeLabel":37,"stem":280,"options":281,"answer":292,"analysis":33},1143211,"关于灌注桩排桩支护施工要求的说法， 正确的有（）。",[282,284,286,288,290],{"key":20,"text":283,"correct":32},"适用于基坑侧壁安全等级为一级、二级、三级的基坑",{"key":24,"text":285,"correct":22},"灌注桩排桩应采用依次成桩的施工顺序",{"key":27,"text":287,"correct":32},"灌注桩顶应充分泛浆，高度不应小于500mm",{"key":30,"text":289,"correct":22},"水下灌注混凝土时混凝土强度应按设计桩身强度等级进行配制",{"key":49,"text":291,"correct":32},"截水帷幕与灌注桩排桩间的净距宜小于200mm","ACE",{"id":294,"libraryId":5,"type":36,"typeLabel":37,"stem":295,"options":296,"answer":306,"analysis":33},1143213,"下列深基坑的支护形式具有截水作用的有（）。",[297,299,301,302,304],{"key":20,"text":298,"correct":22},"灌注桩排桩支护",{"key":24,"text":300,"correct":32},"地下连续墙支护",{"key":27,"text":276,"correct":22},{"key":30,"text":303,"correct":32},"咬合桩围护墙",{"key":49,"text":305,"correct":32},"板桩围护墙","BDE",{"id":308,"libraryId":5,"type":36,"typeLabel":37,"stem":309,"options":310,"answer":321,"analysis":33},1143215,"关于地下连续墙钢筋混凝土导墙的说法， 正确的有（）。",[311,313,315,317,319],{"key":20,"text":312,"correct":32},"混凝土强度等级不应低于C20",{"key":24,"text":314,"correct":22},"厚度不应小于500mm",{"key":27,"text":316,"correct":32},"导墙应高出地下水位0.5m以上，底部应进入原状土200mm以上",{"key":30,"text":318,"correct":32},"导墙高度不应小于1.2m",{"key":49,"text":320,"correct":22},"导墙内净距离宜与地下连续墙设计厚度相同","ACD",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":30,"analysis":33},1143218,"深基坑土方开挖时， 为了防止或减小降水对邻近建筑物、 管线的影响， 常采用（） 方法。",[326,327,329,331],{"key":20,"text":170,"correct":22},{"key":24,"text":328,"correct":22},"管井井点",{"key":27,"text":330,"correct":22},"截水",{"key":30,"text":332,"correct":32},"井点回灌技术",{"id":334,"libraryId":5,"type":36,"typeLabel":37,"stem":335,"options":336,"answer":347,"analysis":33},1143220,"关于土方开挖的说法， 正确的有（）。",[337,339,341,343,345],{"key":20,"text":338,"correct":32},"人工挖土不能立即进行下道工序时，保留土层厚度为15~30cm",{"key":24,"text":340,"correct":32},"采用机械开挖时，保留土层厚度为20~30cm",{"key":27,"text":342,"correct":22},"在地下水位以下挖土，应将水位降低至开挖面",{"key":30,"text":344,"correct":22},"降水工程应持续到基础完成或地下室完工",{"key":49,"text":346,"correct":22},"相邻基坑开挖时，应遵循先浅后深或同时进行的施工程序","AB",{"id":349,"libraryId":5,"type":36,"typeLabel":37,"stem":350,"options":351,"answer":135,"analysis":33},1143222,"关于深基坑土方开挖的说法， 正确的有（）。",[352,354,356,358,360],{"key":20,"text":353,"correct":32},"放坡挖土属于无支护结构",{"key":24,"text":355,"correct":32},"分层厚度宜控制在3m以内",{"key":27,"text":357,"correct":32},"多级放坡开挖时，破间平台宽度不小于3m",{"key":30,"text":359,"correct":22},"采用土钉墙支护的基坑开挖应分层分段进行，每层分段长度不宜大于20m",{"key":49,"text":361,"correct":22},"采用逆作法的基坑开挖面积较大时，宜采用中心岛式开挖",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":27,"analysis":33},1143224,"在基坑验槽时， 基底以下不可见部位的土层， 可以采用的验槽方法是（）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"观察法",{"key":24,"text":369,"correct":22},"轻型动力触探法",{"key":27,"text":371,"correct":32},"钎探法",{"key":30,"text":373,"correct":22},"超声波检测",{"id":375,"libraryId":5,"type":36,"typeLabel":37,"stem":376,"options":377,"answer":388,"analysis":33},1143226,"基坑（槽） 挖至基底设计标高并清理后， 参加验槽的单位有（）。",[378,380,382,384,386],{"key":20,"text":379,"correct":32},"建设单位",{"key":24,"text":381,"correct":22},"质量监督机构",{"key":27,"text":383,"correct":32},"勘察单位",{"key":30,"text":385,"correct":32},"施工单位",{"key":49,"text":387,"correct":32},"监理单位","ACDE",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1143229,"填方的密实度要求和质量通常以压实系数表示， 压实系数为（） 比值。",[393,395,397,399],{"key":20,"text":394,"correct":32},"实际干土密度与最大干土密度",{"key":24,"text":396,"correct":22},"最大干土密度与实际干土密度",{"key":27,"text":398,"correct":22},"实际干土密度与最小干土密度",{"key":30,"text":400,"correct":22},"最小干土密度与实际干土密度",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":30,"analysis":33},1143235,"关于沉管灌注桩复打法的说法， 正确的是（）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"复打法适用于含水量较小的土层",{"key":24,"text":408,"correct":22},"第一次灌注混凝土应达到设计标高",{"key":27,"text":410,"correct":22},"应在第一次浇筑的混凝土终凝之前完成复打",{"key":30,"text":412,"correct":32},"初打与复打的中心线应重合",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":30,"analysis":33},1143237,"饱和黏性土地基， 灌注桩进行承载力检测前的休止时间是（） d。",[417,419,421,423],{"key":20,"text":418,"correct":22},"7",{"key":24,"text":420,"correct":22},"10",{"key":27,"text":422,"correct":22},"15",{"key":30,"text":424,"correct":32},"25",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1143239,"关于杯型基础混凝土浇筑的说法， 正确的是（）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"将杯口底混凝土振实后紧接着浇筑振捣杯口模四周混凝土",{"key":24,"text":432,"correct":32},"杯口混凝土应在两侧对称浇筑",{"key":27,"text":434,"correct":22},"在混凝土终凝后，将芯模拔出，并将杯壁凿毛",{"key":30,"text":436,"correct":22},"高杯口基础应采用先安装杯口模的方法，即将杯口模板与杯口底模板一次性安装",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":30,"analysis":33},1143241,"关于钢筋混凝土预制桩锤击沉桩的沉桩顺序正确的是（）。",[441,443,445,447],{"key":20,"text":442,"correct":22},"先浅后深",{"key":24,"text":444,"correct":22},"先小后大",{"key":27,"text":446,"correct":22},"先短后长",{"key":30,"text":448,"correct":32},"先密后疏",{"id":450,"libraryId":5,"type":36,"typeLabel":37,"stem":451,"options":452,"answer":463,"analysis":33},1143243,"关于砌体基础施工的说法， 正确的有（）。",[453,455,457,459,461],{"key":20,"text":454,"correct":32},"宜采用“三一”砌筑法，即一铲灰、一块砖、一揉压",{"key":24,"text":456,"correct":22},"可使用水泥混合砂浆砌筑",{"key":27,"text":458,"correct":22},"基础标高不同时，应从高处砌起，并应由高处向低处搭砌",{"key":30,"text":460,"correct":32},"宜采用一顺一丁或梅花丁的砌筑形式",{"key":49,"text":462,"correct":32},"多孔砖砌体采用铺浆法砌筑时，铺桨长度不得超过500mm","ADE",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},1143245,"关于条形基础浇筑的说法， 错误的是（）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"一般应分层分段浇筑混凝土，一般不留施工缝",{"key":24,"text":471,"correct":32},"分层浇筑的混凝土厚度为200~300mm",{"key":27,"text":473,"correct":22},"每段间浇筑长度控制在2~3m",{"key":30,"text":475,"correct":22},"逐段逐层呈阶梯型向前推进",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":27,"analysis":33},1143247,"关于换填地基的说法， 正确的是（）。",[480,482,484,486],{"key":20,"text":481,"correct":22},"可以在柱基、墙角及承重窗间墙下接缝",{"key":24,"text":483,"correct":22},"上下两层的缝距不得小于1000mm",{"key":27,"text":485,"correct":32},"灰土应拌合均匀并应当天铺填夯压",{"key":30,"text":487,"correct":22},"粉煤灰垫层每层验收后应晾晒后再铺填上层或封层",{"id":489,"libraryId":5,"type":36,"typeLabel":37,"stem":490,"options":491,"answer":502,"analysis":33},1143249,"下列关于锤击沉桩法施工要求的说法中， 正确的有（）。",[492,494,496,498,500],{"key":20,"text":493,"correct":22},"接桩时桩头宜高出地面1m~1.5m",{"key":24,"text":495,"correct":32},"接桩方法分为焊接、螺纹接头和机械啮合接头",{"key":27,"text":497,"correct":32},"密集桩宜从中间向四周或两边对称施打",{"key":30,"text":499,"correct":22},"一侧毗邻建筑物时，应向毗邻建筑物处施打",{"key":49,"text":501,"correct":22},"贯入度达到设计要求而标高未达到时，应继续锤击2阵，每阵10击","BC",{"id":504,"libraryId":5,"type":36,"typeLabel":37,"stem":505,"options":506,"answer":321,"analysis":33},1143251,"关于泥浆护壁钻孔灌注桩的说法， 正确的有（）。",[507,509,511,513,515],{"key":20,"text":508,"correct":32},"钻孔内泥浆液面高出地下水位0.5m",{"key":24,"text":510,"correct":22},"端承型桩清孔后孔底沉渣厚度不大于100mm",{"key":27,"text":512,"correct":32},"水下混凝土强度应比设计强度等级提高等级配置",{"key":30,"text":514,"correct":32},"水下混凝土超灌高度应高于设计桩顶标高1m以上",{"key":49,"text":516,"correct":22},"注浆终止条件应以控制注浆压力为主",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":20,"analysis":33},1143253,"关于静压桩的终止沉桩标准的说法中， 正确的是（）。",[521,523,525,527],{"key":20,"text":522,"correct":32},"静压桩应以标高为主，压力为辅",{"key":24,"text":524,"correct":22},"摩擦桩应按终压力控制",{"key":27,"text":526,"correct":22},"端承摩擦桩，应以终压力控制为主，桩顶标高控制为辅",{"key":30,"text":528,"correct":22},"端承桩应以桩顶标高控制为主，终压力控制为辅",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":24,"analysis":33},1143255,"采用锤击沉桩法打预制桩时， 当桩端达到坚硬粘性土时， 桩的入土深度的控制方法是（）。",[533,535,537,539],{"key":20,"text":534,"correct":22},"只控制贯入度",{"key":24,"text":536,"correct":32},"以控制贯入度为主，以标高为辅",{"key":27,"text":538,"correct":22},"只控制标高",{"key":30,"text":540,"correct":22},"以控制标高为主，以贯入度为辅",{"id":542,"libraryId":5,"type":36,"typeLabel":37,"stem":543,"options":544,"answer":292,"analysis":33},1143257,"关于人工挖孔灌注桩桩的说法中， 正确的有（）。",[545,547,549,551,553],{"key":20,"text":546,"correct":32},"人工挖孔灌注桩护壁方法应用较广的是现浇混凝土分段护壁",{"key":24,"text":548,"correct":22},"桩净间距小于5m时，应采用间隔开挖和间隔浇筑",{"key":27,"text":550,"correct":32},"相邻排桩最小施工间距不应小于5m",{"key":30,"text":552,"correct":22},"孔内挖土次序宜先周边再中间",{"key":49,"text":554,"correct":32},"扩底部分应先挖桩身圆柱体，再按扩底尺寸重上而下进行",{"id":556,"libraryId":5,"type":36,"typeLabel":37,"stem":557,"options":558,"answer":569,"analysis":33},1143259,"灌注桩桩基检测方法的低应变法的目的是（）。",[559,561,563,565,567],{"key":20,"text":560,"correct":22},"检测桩身混凝土强度",{"key":24,"text":562,"correct":22},"检测灌注桩桩长",{"key":27,"text":564,"correct":22},"检测桩底沉渣厚度",{"key":30,"text":566,"correct":32},"判定完整性类别",{"key":49,"text":568,"correct":32},"检测桩身缺陷及其位置","DE",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":27,"analysis":33},1143262,"下列关于桩基检测的说法， 正确的是（）。",[574,576,578,580],{"key":20,"text":575,"correct":22},"采用应变法和声波透射法检测时，受检桩混凝土强度等级不应低于设计强度75%，且不应低于15MPa",{"key":24,"text":577,"correct":22},"采用钻芯法检测时，受检桩混凝土龄期应达到28d，或标准条件养护试块强度达到设计要求",{"key":27,"text":579,"correct":32},"宜先进行桩身完整性检测，后进行承载力检测",{"key":30,"text":581,"correct":22},"选用钻芯法时，钻孔位置宜在桩周边对称布置",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":27,"analysis":33},1143264,"桩身完整性检测时， 桩身有明显缺陷， 对桩身结构承载力有影响的， 属于（） 类桩。",[586,588,590,592],{"key":20,"text":587,"correct":22},"Ⅰ",{"key":24,"text":589,"correct":22},"Ⅱ",{"key":27,"text":591,"correct":32},"Ⅲ",{"key":30,"text":593,"correct":22},"Ⅳ",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":20,"analysis":33},1143266,"关于台阶式混凝土基础浇筑的说法， 正确的是（）。",[598,600,602,604],{"key":20,"text":599,"correct":32},"可按台阶分层一次浇筑完毕，不允许留施工缝",{"key":24,"text":601,"correct":22},"每层混凝土要一次浇筑，顺序是先中间后边角",{"key":27,"text":603,"correct":22},"第一级混凝土捣固后应立即浇筑第二级混凝土",{"key":30,"text":605,"correct":22},"应将第一级混凝土齐模板顶边拍实抹平后浇筑第二级混凝土",{"id":607,"libraryId":5,"type":36,"typeLabel":37,"stem":608,"options":609,"answer":388,"analysis":33},1143268,"下列桩基检测方法中， 可以用以判断桩身完整性类别的试验有（）。",[610,612,614,616,618],{"key":20,"text":611,"correct":32},"低应变法",{"key":24,"text":613,"correct":22},"静载试验",{"key":27,"text":615,"correct":32},"高应变法",{"key":30,"text":617,"correct":32},"钻芯法",{"key":49,"text":619,"correct":32},"声波透射法",{"id":621,"libraryId":5,"type":15,"typeLabel":16,"stem":622,"options":623,"answer":20,"analysis":33},1143270,"下列关于大体积混凝土施工的说法， 正确的是（）。",[624,626,628,630],{"key":20,"text":625,"correct":32},"混凝土浇筑宜从低处开始，沿长边方向自一端向另一端进行",{"key":24,"text":627,"correct":22},"大体积混凝土与普通混凝土一样，只需要进行常规养护",{"key":27,"text":629,"correct":22},"大体积混凝土保湿养护时间不得少于7d",{"key":30,"text":631,"correct":22},"大体积混凝土入模温度不宜大于35℃",{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":30,"analysis":33},1143272,"关于大体积混凝土温控指标的说法， 正确的是（）。",[636,638,640,642],{"key":20,"text":637,"correct":22},"混凝土浇筑体最大升温值不宜大于25℃",{"key":24,"text":639,"correct":22},"在养护阶段混凝土浇筑体表面温度与环境温度最大差值不应大于25℃",{"key":27,"text":641,"correct":22},"混凝土浇筑体的降温速率不宜大于2.5℃\u002Fd",{"key":30,"text":643,"correct":32},"混凝土浇筑体内部相邻两测温点的温度差值不应大于25℃",{"id":645,"libraryId":5,"type":36,"typeLabel":37,"stem":646,"options":647,"answer":177,"analysis":33},1143274,"大体积混凝土的防裂技术措施包括（）。",[648,650,652,654,656],{"key":20,"text":649,"correct":32},"优先选用矿渣水泥拌制混凝土",{"key":24,"text":651,"correct":32},"降低拌合水温度，骨料可用水冲洗降温、避免暴晒",{"key":27,"text":653,"correct":32},"可掺入缓凝、减水、微膨胀的外加剂",{"key":30,"text":655,"correct":22},"合理使用材料，提高水泥用量",{"key":49,"text":657,"correct":32},"采用二次振捣工艺",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":20,"analysis":33},1143278,"高强度螺栓的连接形式中，（） 是目前广泛采用的基本连接形式。",[662,664,666,668],{"key":20,"text":663,"correct":32},"摩擦连接",{"key":24,"text":665,"correct":22},"承压连接",{"key":27,"text":667,"correct":22},"焊接",{"key":30,"text":669,"correct":22},"张拉连接",{"id":671,"libraryId":5,"type":36,"typeLabel":37,"stem":672,"options":673,"answer":569,"analysis":33},1143280,"关于钢结构防火涂料涂装的说法， 正确的有（）。",[674,676,678,680,682],{"key":20,"text":675,"correct":22},"通常情况下，应先进行防火涂料的涂装，再进行防腐涂料的涂装",{"key":24,"text":677,"correct":22},"通常采用刷涂或滚涂法施工",{"key":27,"text":679,"correct":22},"在每层涂层基本干燥或固化前喷涂下一层，通常每天喷涂一层",{"key":30,"text":681,"correct":32},"操作者必须有特殊工种作业操作证",{"key":49,"text":683,"correct":32},"防火涂料与防腐涂料应具有相容性",[685,688,691,694,697,700],{"id":15,"name":686,"category":7,"favorite":687},"领导干部任职前廉政法规知识测试题",92,{"id":689,"name":690,"category":7,"favorite":15},595,"建筑结构与设备",{"id":692,"name":693,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":695,"name":696,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":698,"name":699,"category":7,"favorite":8},534,"BIM工程师",{"id":701,"name":699,"category":7,"favorite":8},535]