[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-37":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":638},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,37,50,2362,[13,38,52,67,79,91,106,117,129,143,155,167,182,196,210,222,234,246,260,275,287,301,313,325,336,350,362,371,379,390,398,410,425,437,445,460,473,487,497,507,519,528,540,552,567,581,591,603,611,623],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1145221,2,"多选题","采用价值工程原理控制成本时，能提高价值的途径有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","功能不变，成本降低",true,{"key":24,"text":25,"correct":26},"B","主要功能降低，成本大幅度降低",false,{"key":28,"text":29,"correct":22},"C","功能提高，成本不变",{"key":31,"text":32,"correct":22},"D","成本稍有提高，功能大幅度提高",{"key":34,"text":35,"correct":22},"E","功能提高，成本降低","ACDE","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":20,"analysis":37},1145222,1,"单选题","在选择价值分析对象时，不能作为重点分析对象的是（ ）。",[44,46,48,50],{"key":20,"text":45,"correct":22},"成本低的工程和构配件",{"key":24,"text":47,"correct":26},"使用费用较高的工程和构配件",{"key":28,"text":49,"correct":26},"体积与重量大的工程和构件",{"key":31,"text":51,"correct":26},"结构复杂的工程和构配件",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},1145223,"应用价值工程进行价值分析时，关于分析对象选择的说法，正确的有（ ）。",[56,58,60,62,64],{"key":20,"text":57,"correct":26},"选择数量少，复杂关键的构配件",{"key":24,"text":59,"correct":22},"选择数量大，应用面广的构配件",{"key":28,"text":61,"correct":22},"选择对产品功能提高起关键作用的构配件",{"key":31,"text":63,"correct":26},"选择在施工（生产）中不容易保证质量的工程和构配件",{"key":34,"text":65,"correct":22},"选择畅销产品，以保持优势，提高竞争力","BCE",{"id":68,"libraryId":5,"type":40,"typeLabel":41,"stem":69,"options":70,"answer":31,"analysis":37},1145224,"以下关于选择价值工程分析对象的说明，其中正确的是（ ）。",[71,73,75,77],{"key":20,"text":72,"correct":26},"选择在施工中最不容易保证施工质量的工程",{"key":24,"text":74,"correct":26},"选择施工难度大，但较少花材料和工时的工程",{"key":28,"text":76,"correct":26},"选择结构简单的工程",{"key":31,"text":78,"correct":22},"选择数量大和体积大的工程",{"id":80,"libraryId":5,"type":40,"typeLabel":41,"stem":81,"options":82,"answer":24,"analysis":37},1145225,"项目施工成本按“制造成本法”进行核算时，只计入施工项目成本的是（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":26},"企业经营期间相关的费用",{"key":24,"text":86,"correct":22},"变动成本",{"key":28,"text":88,"correct":26},"企业总部的管理费",{"key":31,"text":90,"correct":26},"规费",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":105,"analysis":37},1145226,"成本核算的方法有（ ）。",[95,97,99,101,103],{"key":20,"text":96,"correct":22},"制造成本法",{"key":24,"text":98,"correct":26},"综合成本法",{"key":28,"text":100,"correct":26},"期间成本法",{"key":31,"text":102,"correct":22},"完全成本法",{"key":34,"text":104,"correct":26},"直接成本法","AD",{"id":107,"libraryId":5,"type":40,"typeLabel":41,"stem":108,"options":109,"answer":28,"analysis":37},1145227,"按“制造成本法”进行核算项目成本，作为期间费用的有（ ）。",[110,112,114,115],{"key":20,"text":111,"correct":26},"项目管理人员工资",{"key":24,"text":113,"correct":26},"项目财务费用",{"key":28,"text":88,"correct":22},{"key":31,"text":116,"correct":26},"项目人员的培训费",{"id":118,"libraryId":5,"type":40,"typeLabel":41,"stem":119,"options":120,"answer":28,"analysis":37},1145228,"在进行材料采购时，应进行方案优选，选择()的方案。",[121,123,125,127],{"key":20,"text":122,"correct":26},"材料费最低",{"key":24,"text":124,"correct":26},"材料费、采购费之和最低",{"key":28,"text":126,"correct":22},"采购费、仓储费之和最低",{"key":31,"text":128,"correct":26},"材料费、仓储费之和最低",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":105,"analysis":37},1145229,"材料采购应按照企业()的要求，依据项目经理部提出的材料计划进行采购。",[133,135,137,139,141],{"key":20,"text":134,"correct":22},"质量管理体系",{"key":24,"text":136,"correct":26},"质量保证体系",{"key":28,"text":138,"correct":26},"技术管理体系",{"key":31,"text":140,"correct":22},"环境管理体系",{"key":34,"text":142,"correct":26},"物资管理体系",{"id":144,"libraryId":5,"type":40,"typeLabel":41,"stem":145,"options":146,"answer":31,"analysis":37},1145231,"软土地区某水下基槽开挖工程，最适宜的土方施工机械是()。",[147,149,151,153],{"key":20,"text":148,"correct":26},"正铲挖掘机",{"key":24,"text":150,"correct":26},"反铲挖掘机",{"key":28,"text":152,"correct":26},"抓铲挖掘机",{"key":31,"text":154,"correct":22},"拉铲挖掘机",{"id":156,"libraryId":5,"type":40,"typeLabel":41,"stem":157,"options":158,"answer":24,"analysis":37},1145232,"需在15d内完成2700t钢筋制作任务，每个工人每日工效为4.5t，则钢筋制作劳动力至少投入()人。",[159,161,163,165],{"key":20,"text":160,"correct":26},"20",{"key":24,"text":162,"correct":22},"40",{"key":28,"text":164,"correct":26},"60",{"key":31,"text":166,"correct":26},"180",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":181,"analysis":37},1145233,"由于现场施工劳动的特点，劳动力结构应具有的特点包括()。",[171,173,175,177,179],{"key":20,"text":172,"correct":22},"长工期少，短工期多",{"key":24,"text":174,"correct":22},"技术工少，普通工多",{"key":28,"text":176,"correct":22},"老年工人多，中青年工人少",{"key":31,"text":178,"correct":26},"工资较少，劳动力度强",{"key":34,"text":180,"correct":22},"女性工人少，男性工人多","ABCE",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":66,"analysis":37},1145234,"下列操作中，可以直接进行劳务分包的有()。",[186,188,190,192,194],{"key":20,"text":187,"correct":26},"幕墙安装",{"key":24,"text":189,"correct":22},"混凝土振捣",{"key":28,"text":191,"correct":22},"脚手架搭设",{"key":31,"text":193,"correct":26},"电梯安装",{"key":34,"text":195,"correct":22},"水暖电施工",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":66,"analysis":37},1145235,"下列各项中，属于劳务作业分包范围的是()。",[200,202,204,206,208],{"key":20,"text":201,"correct":26},"幕墙作业",{"key":24,"text":203,"correct":22},"混凝土作业",{"key":28,"text":205,"correct":22},"脚手架作业",{"key":31,"text":207,"correct":26},"电梯作业",{"key":34,"text":209,"correct":22},"水暖电作业",{"id":211,"libraryId":5,"type":40,"typeLabel":41,"stem":212,"options":213,"answer":31,"analysis":37},1145236,"总承包单位与中标的木工作业单位应签订()合同。",[214,216,218,220],{"key":20,"text":215,"correct":26},"总承包",{"key":24,"text":217,"correct":26},"施工分包",{"key":28,"text":219,"correct":26},"施工采购",{"key":31,"text":221,"correct":22},"劳务分包",{"id":223,"libraryId":5,"type":40,"typeLabel":41,"stem":224,"options":225,"answer":31,"analysis":37},1145237,"某建筑工程幕墙分包商欲将分包范围内的劳务作业分包给某建筑劳务公司，则该劳务分包()。",[226,228,230,232],{"key":20,"text":227,"correct":26},"必须经发包人的同意",{"key":24,"text":229,"correct":26},"必须经总承包人的同意",{"key":28,"text":231,"correct":26},"为分包工程再分包，违法",{"key":31,"text":233,"correct":22},"无须征得同意，合法有效",{"id":235,"libraryId":5,"type":40,"typeLabel":41,"stem":236,"options":237,"answer":20,"analysis":37},1145238,"对列入城建档案馆(室)接收范围的工程，工程实施总承包管理，在竣工验收后应由( )向当地城建档案馆(室)移交一套符合规定的工程档案。",[238,240,242,244],{"key":20,"text":239,"correct":22},"建设单位",{"key":24,"text":241,"correct":26},"监理单位",{"key":28,"text":243,"correct":26},"总承包单位",{"key":31,"text":245,"correct":26},"各单位分别",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":36,"analysis":37},1145239,"关于地基与基础工程实体验收所需条件的说法，正确的有( )。",[250,252,254,256,258],{"key":20,"text":251,"correct":22},"地基与基础分部验收前，基础墙面上的施工孔洞须按规定镶堵密实，并作隐蔽工程验收记录",{"key":24,"text":253,"correct":26},"混凝土结构工程模板应拆除并对其表面清理干净，混凝土结构存在缺陷处提出整改方案",{"key":28,"text":255,"correct":22},"楼层标高控制线应清楚弹出，竖向结构主控轴线应弹出墨线，并做醒目标志",{"key":31,"text":257,"correct":22},"工程技术资料存在的问题均已悉数整改完成",{"key":34,"text":259,"correct":22},"安装工程中各类管道预埋结束，相应测试工作已完成，其结果符合规定要求",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":274,"analysis":37},1145240,"灌注桩成孔的控制深度与桩型有关，下列说法中，正确的有( )。",[264,266,268,270,272],{"key":20,"text":265,"correct":22},"摩擦桩应以设计桩长控制成孔深度",{"key":24,"text":267,"correct":26},"摩擦桩采用锤击沉管法成孔时，桩管入土深度控制应以贯入度为主，以标高控制为辅",{"key":28,"text":269,"correct":26},"当端承型桩采用钻(冲)、挖掘成孔时，应以设计桩长控制成孔深度",{"key":31,"text":271,"correct":22},"当端承型桩采用锤击沉管法成孔时，桩管入土深度控制应以贯入度为主，以标高控制为辅",{"key":34,"text":273,"correct":22},"端承摩擦桩必须保证设计桩长及桩端进入持力层深度","ADE",{"id":276,"libraryId":5,"type":40,"typeLabel":41,"stem":277,"options":278,"answer":20,"analysis":37},1145241,"泥浆护壁成孔灌注桩开始灌注混凝土时，导管底部至孔底的距离宜为( )。",[279,281,283,285],{"key":20,"text":280,"correct":22},"400mm",{"key":24,"text":282,"correct":26},"500mm",{"key":28,"text":284,"correct":26},"600mm",{"key":31,"text":286,"correct":26},"800mm",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":300,"analysis":37},1145242,"地基与基础分部工程验收时，必须参加的单位有( )。",[291,293,294,296,298],{"key":20,"text":292,"correct":22},"施工单位",{"key":24,"text":241,"correct":22},{"key":28,"text":295,"correct":22},"设计单位",{"key":31,"text":297,"correct":22},"勘察单位",{"key":34,"text":299,"correct":26},"咨询单位","ABCD",{"id":302,"libraryId":5,"type":40,"typeLabel":41,"stem":303,"options":304,"answer":31,"analysis":37},1145243,"分部工程的验收应由( )来组织。",[305,307,309,311],{"key":20,"text":306,"correct":26},"项目经理",{"key":24,"text":308,"correct":26},"项目总工程师",{"key":28,"text":310,"correct":26},"监理工程师",{"key":31,"text":312,"correct":22},"总监理工程师",{"id":314,"libraryId":5,"type":40,"typeLabel":41,"stem":315,"options":316,"answer":31,"analysis":37},1145244,"建筑装饰装修工程检验批验收时，一般项目中有允许偏差的检验项目，其最大偏差不得超过规范规定允许偏差的( )倍。",[317,319,321,323],{"key":20,"text":318,"correct":26},"1.2",{"key":24,"text":320,"correct":26},"1.3",{"key":28,"text":322,"correct":26},"1.4",{"key":31,"text":324,"correct":22},"1.5",{"id":326,"libraryId":5,"type":40,"typeLabel":41,"stem":327,"options":328,"answer":31,"analysis":37},1145245,"单位工程预验收时，可不参加的是( )。",[329,330,332,334],{"key":20,"text":312,"correct":26},{"key":24,"text":331,"correct":26},"专业监理工程师",{"key":28,"text":333,"correct":26},"施工单位项目负责人",{"key":31,"text":335,"correct":22},"勘察单位项目负责人",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":181,"analysis":37},1145246,"建筑工程分部工程质量验收合格的规定有( )。",[340,342,344,346,348],{"key":20,"text":341,"correct":22},"分部工程所含分项工程的质量均应验收合格",{"key":24,"text":343,"correct":22},"质量控制资料应完整",{"key":28,"text":345,"correct":22},"观感质量验收应符合要求",{"key":31,"text":347,"correct":26},"主要使用功能项目的抽样检验结果应符合相关专业质量验收规范的规定",{"key":34,"text":349,"correct":22},"地基与基础、主体结构和设备安装等分部工程有关安全及功能的检验和抽样检测结果应符合有关规定",{"id":351,"libraryId":5,"type":40,"typeLabel":41,"stem":352,"options":353,"answer":20,"analysis":37},1145247,"单位(子单位)工程的验收应由( )来组织。",[354,356,358,360],{"key":20,"text":355,"correct":22},"建设单位(项目)负责人",{"key":24,"text":357,"correct":26},"施工单位(项目)负责人",{"key":28,"text":359,"correct":26},"监理单位(项目)负责人",{"key":31,"text":361,"correct":26},"当地建设行政主管部门(项目)负责人",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":36,"analysis":37},1145248,"关于地基与基础工程实体验收所需条件的说法，正确的有（ ）。",[366,367,368,369,370],{"key":20,"text":251,"correct":22},{"key":24,"text":253,"correct":26},{"key":28,"text":255,"correct":22},{"key":31,"text":257,"correct":22},{"key":34,"text":259,"correct":22},{"id":372,"libraryId":5,"type":40,"typeLabel":41,"stem":373,"options":374,"answer":31,"analysis":37},1145249,"分部工程的验收应由（ ）来组织。",[375,376,377,378],{"key":20,"text":306,"correct":26},{"key":24,"text":308,"correct":26},{"key":28,"text":310,"correct":26},{"key":31,"text":312,"correct":22},{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":389,"analysis":37},1145250,"建筑主体结构分部工程验收，必须参加的单位有（ ）。",[383,384,385,386,387],{"key":20,"text":239,"correct":22},{"key":24,"text":295,"correct":22},{"key":28,"text":241,"correct":22},{"key":31,"text":297,"correct":26},{"key":34,"text":388,"correct":26},"基坑分包单位","ABC",{"id":391,"libraryId":5,"type":40,"typeLabel":41,"stem":392,"options":393,"answer":28,"analysis":37},1145252,"《民用建筑节能条例》规定，（ ）组织竣工验收，应当对民用建筑是否符合民用建筑节能强制性标准进行查验；对不符合民用建筑节能强制性标准的，不得出具竣工验收合格报告。",[394,395,396,397],{"key":20,"text":295,"correct":26},{"key":24,"text":292,"correct":26},{"key":28,"text":239,"correct":22},{"key":31,"text":297,"correct":26},{"id":399,"libraryId":5,"type":40,"typeLabel":41,"stem":400,"options":401,"answer":31,"analysis":37},1145253,"在正常使用条件下，保温工程的最低保修期限为（ ）年。",[402,404,406,408],{"key":20,"text":403,"correct":26},"2",{"key":24,"text":405,"correct":26},"3",{"key":28,"text":407,"correct":26},"4",{"key":31,"text":409,"correct":22},"5",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":424,"analysis":37},1145254,"关于民用建筑节能管理规定的说法，正确的有（ ）。",[414,416,418,420,422],{"key":20,"text":415,"correct":22},"从事建筑节能及相关管理活动的单位，应当对其从业人员进行建筑节能标准与技术等专业知识的培训",{"key":24,"text":417,"correct":22},"国家推广使用民用建筑节能的新技术、新工艺、新材料和新设备",{"key":28,"text":419,"correct":26},"禁止使用的高耗能源的目录应由国务院节能工作主管部门制定",{"key":31,"text":421,"correct":22},"施工单位不得使用列入禁止使用目录的技术、工艺、材料和设备",{"key":34,"text":423,"correct":26},"国家对能源消耗高的技术、材料和设备一律采取限制进口的态度","ABD",{"id":426,"libraryId":5,"type":40,"typeLabel":41,"stem":427,"options":428,"answer":20,"analysis":37},1145255,"关于建设单位提请城建档案管理机构对地下管线工程档案进行专项预验收时机的说法，正确的是（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"竣工验收前",{"key":24,"text":432,"correct":26},"覆土前",{"key":28,"text":434,"correct":26},"竣工验收备案前",{"key":31,"text":436,"correct":26},"工程移交使用前",{"id":438,"libraryId":5,"type":40,"typeLabel":41,"stem":439,"options":440,"answer":20,"analysis":37},1145256,"对列入城建档案馆（室）接收范围的工程，工程实施总承包管理，在竣工验收后应由（ ）向当地城建档案馆（室）移交一套符合规定的工程档案。",[441,442,443,444],{"key":20,"text":239,"correct":22},{"key":24,"text":241,"correct":26},{"key":28,"text":243,"correct":26},{"key":31,"text":245,"correct":26},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":459,"analysis":37},1145257,"关于建设档案管理的说法，错误的有（ ）。",[449,451,453,455,457],{"key":20,"text":450,"correct":22},"施工单位应当在工程竣工验收后3个月内，向城建档案馆报送一套符合规定的建设工程档案",{"key":24,"text":452,"correct":22},"缓建的工程档案应当暂由施工单位保管",{"key":28,"text":454,"correct":26},"撤销单位的工程建设档案，应当向上级主管机关或者城建档案馆移交",{"key":31,"text":456,"correct":26},"凡结构和平面布置等改变的，应当重新编制建设工程档案，并在工程竣工后3个月内向城建档案馆报送",{"key":34,"text":458,"correct":22},"城市地下管线普查和补测补绘形成的地下管线档案应当在普查、测绘结束后1个月内接收进馆","ABE",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":459,"analysis":37},1145258,"关于城市建设档案编制、报送、移交规定的说法，正确的有（ ）。",[464,466,467,469,471],{"key":20,"text":465,"correct":22},"报送工程建设档案不齐全的，应当限期补充",{"key":24,"text":454,"correct":22},{"key":28,"text":468,"correct":26},"对改建、扩建和重要部位维修的工程，应当重新编制工程建设档案",{"key":31,"text":470,"correct":26},"停建、缓建的工程，应当及时将档案移交城建档案馆",{"key":34,"text":472,"correct":22},"建设工程应当在工程竣工验收合格后3个月内，向城建档案馆报送一套符合规定的工程建设档案",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":181,"analysis":37},1145259,"关于城建档案馆的说法，正确的有（ ）。",[477,479,481,483,485],{"key":20,"text":478,"correct":22},"建设单位应当在工程竣工验收后3个月内，向城建档案馆报送一套符合规定的建设工程档案。凡建设工程档案不齐全的，应当限期补充。",{"key":24,"text":480,"correct":22},"凡结构和平面布置等改变的，应当重新编制建设工程档案，并在工程竣工后3个月内向城建档案馆报送。",{"key":28,"text":482,"correct":22},"预验收合格后，由城建档案管理机构出具工程档案认可文件",{"key":31,"text":484,"correct":26},"普查和补测补绘形成的地下管线档案应当在普查、测绘结束后6个月内移交档案馆。",{"key":34,"text":486,"correct":22},"撤销单位的工程建设档案，应当向上级主管机关或者城建档案馆移交。",{"id":488,"libraryId":5,"type":40,"typeLabel":41,"stem":489,"options":490,"answer":28,"analysis":37},1145260,"建设单位应当在工程竣工验收后（ ）个月内，向城建档案馆报送一套符合规定的建设工程档案。",[491,492,494,495],{"key":20,"text":409,"correct":26},{"key":24,"text":493,"correct":26},"9",{"key":28,"text":405,"correct":22},{"key":31,"text":496,"correct":26},"6",{"id":498,"libraryId":5,"type":40,"typeLabel":41,"stem":499,"options":500,"answer":24,"analysis":37},1145261,"对列入城建档案馆（室）接收范围的工程，工程竣工验收后（ ）个月内，向当地城建档案馆（室）移交一套符合规定的工程档案。",[501,503,504,505],{"key":20,"text":502,"correct":26},"1",{"key":24,"text":405,"correct":22},{"key":28,"text":496,"correct":26},{"key":31,"text":506,"correct":26},"12",{"id":508,"libraryId":5,"type":40,"typeLabel":41,"stem":509,"options":510,"answer":24,"analysis":37},1145262,"对于建设工程档案资料的移交与归档，下列说法错误的是（ ）。",[511,513,515,517],{"key":20,"text":512,"correct":26},"实行总承包的，各专业承包单位应向施工总承包单位移交施工资料",{"key":24,"text":514,"correct":22},"建设单位应在汇总完全部工程资料后3个月内，将工程资料向城建档案管理部门移交",{"key":28,"text":516,"correct":26},"对于国家标准没有规定保存期限的归档工程资料，保存期限最短不得少于5年",{"key":31,"text":518,"correct":26},"施工单位工程资料归档保存期限应满足工程质量保修及质量追溯的需要",{"id":520,"libraryId":5,"type":40,"typeLabel":41,"stem":521,"options":522,"answer":20,"analysis":37},1145263,"向当地城建档案管理部门移交工程竣工档案的责任单位是（ ）。",[523,524,525,526],{"key":20,"text":239,"correct":22},{"key":24,"text":241,"correct":26},{"key":28,"text":292,"correct":26},{"key":31,"text":527,"correct":26},"分包单位",{"id":529,"libraryId":5,"type":40,"typeLabel":41,"stem":530,"options":531,"answer":24,"analysis":37},1145264,"建设单位向城建档案馆报送一套符合规定的工程建设档案的期限是（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":26},"工程交付使用之日起3个月内",{"key":24,"text":535,"correct":22},"工程竣工验收后3个月内",{"key":28,"text":537,"correct":26},"工程竣工交付使用后1个月内",{"key":31,"text":539,"correct":26},"工程竣工验收后1个月内",{"id":541,"libraryId":5,"type":40,"typeLabel":41,"stem":542,"options":543,"answer":20,"analysis":37},1145265,"施工单位对施工可能造成损害的毗邻建筑物、构筑物和地下管线等，应当（ ）o",[544,546,548,550],{"key":20,"text":545,"correct":22},"采取专项防护措施",{"key":24,"text":547,"correct":26},"通知相关单位采取措施",{"key":28,"text":549,"correct":26},"通知建设单位采取措施",{"key":31,"text":551,"correct":26},"通知监理单位采取措施",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":566,"analysis":37},1145266,"不属于城市建设档案管理部门管理的档案资料有（ ）。",[556,558,560,562,564],{"key":20,"text":557,"correct":26},"城市规划部门形成的业务管理档案",{"key":24,"text":559,"correct":22},"军事禁区的地下管线",{"key":28,"text":561,"correct":22},"军事管理区有关隐蔽工程",{"key":31,"text":563,"correct":26},"有关城市建设及其管理的方针、政策、法规等方面的文件",{"key":34,"text":565,"correct":26},"有关城市历史、自然、经济等方面的基础资料","BC",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":181,"analysis":37},1145267,"城市建设工程档案包括（ ）。",[571,573,575,577,579],{"key":20,"text":572,"correct":22},"交通基础设施工程",{"key":24,"text":574,"correct":22},"公用基础设施工程",{"key":28,"text":576,"correct":22},"市政基础设施工程",{"key":31,"text":578,"correct":26},"军用建筑工程",{"key":34,"text":580,"correct":22},"风景名胜、园林建设工程",{"id":582,"libraryId":5,"type":40,"typeLabel":41,"stem":583,"options":584,"answer":28,"analysis":37},1145268,"挖掘城市道路工程竣工并清理后，应通知（ ）检查验收。",[585,586,587,589],{"key":20,"text":239,"correct":26},{"key":24,"text":241,"correct":26},{"key":28,"text":588,"correct":22},"市政工程行政主管部门",{"key":31,"text":590,"correct":26},"公安交通管理部门",{"id":592,"libraryId":5,"type":40,"typeLabel":41,"stem":593,"options":594,"answer":28,"analysis":37},1145269,"关于挖掘城市道路的说法，正确的是（ ）。",[595,597,599,601],{"key":20,"text":596,"correct":26},"新建、扩建、改建的城市道路交付使用后3年内不得挖掘",{"key":24,"text":598,"correct":26},"大修的城市道路竣工后5年内不得挖掘",{"key":28,"text":600,"correct":22},"对未达到规定期限的新建、扩建、改建、大修的城市道路，如因特殊情况需要挖掘的，须经县级以上城市人民政府批准",{"key":31,"text":602,"correct":26},"因工程建设需要挖掘城市道路的，须经县级以上市政工程行政主管部门批准",{"id":604,"libraryId":5,"type":40,"typeLabel":41,"stem":605,"options":606,"answer":28,"analysis":37},1145271,"不考虑周围环境和地下管线复杂等情况，基坑、槽土方开挖安全专项施工方案须进行专家论证的深度最小值是（ ）米",[607,608,609,610],{"key":20,"text":403,"correct":26},{"key":24,"text":405,"correct":26},{"key":28,"text":409,"correct":22},{"key":31,"text":496,"correct":26},{"id":612,"libraryId":5,"type":40,"typeLabel":41,"stem":613,"options":614,"answer":20,"analysis":37},1145272,"施工高度（ ）及以上的建筑幕墙安装工程，属于“超过一定规模的危险性较大的分部分项工程”，应由施工单位组织，召开专家论证会。",[615,617,619,621],{"key":20,"text":616,"correct":22},"50m",{"key":24,"text":618,"correct":26},"100m",{"key":28,"text":620,"correct":26},"150m",{"key":31,"text":622,"correct":26},"200m",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":637,"analysis":37},1145273,"下列分部分项工程的专项方案中，必须进行专家论证的有（ ）。",[627,629,631,633,635],{"key":20,"text":628,"correct":22},"爬模工程",{"key":24,"text":630,"correct":22},"搭设高度8m的混凝土模板支撑工程",{"key":28,"text":632,"correct":26},"搭设高度25m的落地式钢管脚手架工程",{"key":31,"text":634,"correct":22},"搭设高度50m及以上的落地式钢管脚手架工程",{"key":34,"text":636,"correct":22},"施工高度50m的建筑幕墙安装工程","ABDE",[639,642,645,648,651,654],{"id":40,"name":640,"category":7,"favorite":641},"领导干部任职前廉政法规知识测试题",92,{"id":643,"name":644,"category":7,"favorite":40},595,"建筑结构与设备",{"id":646,"name":647,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":649,"name":650,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":652,"name":653,"category":7,"favorite":8},534,"BIM工程师",{"id":655,"name":653,"category":7,"favorite":8},535]