[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-36":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":658},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,36,50,2362,[13,34,52,64,78,91,104,118,132,143,155,170,182,197,208,222,234,242,257,271,283,295,307,321,334,346,358,370,385,399,411,423,437,449,461,473,488,499,511,526,538,550,562,577,585,597,611,623,635,646],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1145171,1,"单选题","暂估价不包括（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","材料暂估单价",false,{"key":24,"text":25,"correct":22},"B","工程设备暂估单价",{"key":27,"text":28,"correct":22},"C","专业工程暂估单价",{"key":30,"text":31,"correct":32},"D","人工费暂估单价",true,"",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1145172,2,"多选题","其他项目清单内容列项是（ ）。",[40,42,44,46,48],{"key":20,"text":41,"correct":22},"风险费用",{"key":24,"text":43,"correct":32},"暂列金额",{"key":27,"text":45,"correct":32},"暂估价",{"key":30,"text":47,"correct":32},"总包服务费",{"key":49,"text":50,"correct":32},"E","计日工","BCDE",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":20,"analysis":33},1145173,"规费是指政府和有关权力部门规定必须缴纳的费用，其内容不包括（ ）。",[56,58,60,62],{"key":20,"text":57,"correct":32},"环境保护费",{"key":24,"text":59,"correct":22},"社会保障费",{"key":27,"text":61,"correct":22},"工程排污费",{"key":30,"text":63,"correct":22},"住房公积金",{"id":65,"libraryId":5,"type":36,"typeLabel":37,"stem":66,"options":67,"answer":77,"analysis":33},1145174,"属措施项目中的安全文明施工费的有（ ）。",[68,69,71,73,75],{"key":20,"text":57,"correct":32},{"key":24,"text":70,"correct":32},"文明施工费",{"key":27,"text":72,"correct":22},"夜间施工增加费",{"key":30,"text":74,"correct":32},"临时设施费",{"key":49,"text":76,"correct":32},"安全施工费","ABDE",{"id":79,"libraryId":5,"type":36,"typeLabel":37,"stem":80,"options":81,"answer":90,"analysis":33},1145175,"根据《建筑安装工程费用项目组成》，规费是指按国家法律、法规规定，由省级政府和省级有关部门规定必须缴纳或计取的费用。内容包括（ ）。",[82,84,85,86,88],{"key":20,"text":83,"correct":32},"社会保险费",{"key":24,"text":63,"correct":32},{"key":27,"text":61,"correct":32},{"key":30,"text":87,"correct":22},"劳动保护费",{"key":49,"text":89,"correct":22},"财产保险费","ABC",{"id":92,"libraryId":5,"type":36,"typeLabel":37,"stem":93,"options":94,"answer":103,"analysis":33},1145176,"下列费用项目中，属于规费项目清单中应列项内容的有（ ）。",[95,96,98,99,101],{"key":20,"text":61,"correct":32},{"key":24,"text":97,"correct":22},"保险",{"key":27,"text":63,"correct":32},{"key":30,"text":100,"correct":32},"养老保险费",{"key":49,"text":102,"correct":22},"政府税收、收费和基金等","ACD",{"id":105,"libraryId":5,"type":36,"typeLabel":37,"stem":106,"options":107,"answer":90,"analysis":33},1145177,"下列费用项目中，属于综合单价的组成内容的有（ ）。",[108,110,112,114,116],{"key":20,"text":109,"correct":32},"人工费、材料费、机械费",{"key":24,"text":111,"correct":32},"管理费和利润",{"key":27,"text":113,"correct":32},"投标方自身风险的因素",{"key":30,"text":115,"correct":22},"其他项目费",{"key":49,"text":117,"correct":22},"规费和税金",{"id":119,"libraryId":5,"type":36,"typeLabel":37,"stem":120,"options":121,"answer":131,"analysis":33},1145178,"下列费用项目中，属于单位工程费构成的有（ ）。",[122,124,126,128,130],{"key":20,"text":123,"correct":32},"其他项目清单合价",{"key":24,"text":125,"correct":22},"期间费",{"key":27,"text":127,"correct":32},"措施项目清单合价",{"key":30,"text":129,"correct":32},"分部分项工程量清单合价",{"key":49,"text":117,"correct":32},"ACDE",{"id":133,"libraryId":5,"type":36,"typeLabel":37,"stem":134,"options":135,"answer":142,"analysis":33},1145179,"属于规费项目清单中应列项的内容的有（ ）。",[136,138,139,140,141],{"key":20,"text":137,"correct":22},"工程定额测定费",{"key":24,"text":97,"correct":22},{"key":27,"text":63,"correct":32},{"key":30,"text":100,"correct":32},{"key":49,"text":102,"correct":22},"CD",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":24,"analysis":33},1145180,"关于建筑安装工程费按照工程造价形成划分，说法正确的是（ ）。",[147,149,151,153],{"key":20,"text":148,"correct":22},"由人工费、材料费、施工机具使用费、企业管理费、利润、规费和税金组成",{"key":24,"text":150,"correct":32},"由分部分项工程费、措施项目费、其他项目费、规费、税金组成",{"key":27,"text":152,"correct":22},"由人工费、材料费、施工机具使用费、间接费、规费、税金组成",{"key":30,"text":154,"correct":22},"由人工费、材料费、施工机具使用费、企业管理费、间接费、规费、税金组成",{"id":156,"libraryId":5,"type":36,"typeLabel":37,"stem":157,"options":158,"answer":169,"analysis":33},1145181,"关于建筑安装工程费用按照造价形成划分，其组成部分有（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"人工费",{"key":24,"text":162,"correct":22},"材料费",{"key":27,"text":164,"correct":32},"规费",{"key":30,"text":166,"correct":22},"企业管理费",{"key":49,"text":168,"correct":32},"措施项目费","CE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":27,"analysis":33},1145182,"属于措施费内容的是（ ）。",[174,176,178,180],{"key":20,"text":175,"correct":22},"文明施工费、脚手架费、工程排污费",{"key":24,"text":177,"correct":22},"工程排污费、文明施工费、临时设施费",{"key":27,"text":179,"correct":32},"文明施工费、脚手架费、临时设施费",{"key":30,"text":181,"correct":22},"脚手架费、工程排污费、临时设施费",{"id":183,"libraryId":5,"type":36,"typeLabel":37,"stem":184,"options":185,"answer":196,"analysis":33},1145183,"下列保险费用项目中，属于规费中的社会保障费的有（ ）。",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"工程一切险",{"key":24,"text":189,"correct":32},"失业保险",{"key":27,"text":191,"correct":22},"危险作业意外伤害保险",{"key":30,"text":193,"correct":32},"养老保险",{"key":49,"text":195,"correct":32},"医疗保险","BDE",{"id":198,"libraryId":5,"type":36,"typeLabel":37,"stem":199,"options":200,"answer":90,"analysis":33},1145184,"关于建筑安装工程费用项目按照费用构成要素划分，其组成部分有（ ）。",[201,202,203,205,207],{"key":20,"text":160,"correct":32},{"key":24,"text":162,"correct":32},{"key":27,"text":204,"correct":32},"施工机具使用费",{"key":30,"text":206,"correct":22},"措施费",{"key":49,"text":115,"correct":22},{"id":209,"libraryId":5,"type":36,"typeLabel":37,"stem":210,"options":211,"answer":221,"analysis":33},1145185,"企业管理费是指建筑安装企业组织施工生产和经营管理所需费用，其内容包括（ ）。",[212,214,216,218,220],{"key":20,"text":213,"correct":32},"管理人员工资",{"key":24,"text":215,"correct":32},"办公费",{"key":27,"text":217,"correct":32},"差旅交通费",{"key":30,"text":219,"correct":32},"固定资产使用费",{"key":49,"text":63,"correct":22},"ABCD",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},1145186,"属于企业管理费的是（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"固定资产使用费、营业税、劳动保险费",{"key":24,"text":229,"correct":22},"管理人员工资、固定资产使用费、营业税",{"key":27,"text":231,"correct":32},"固定资产使用费、管理人员工资、劳动保险费",{"key":30,"text":233,"correct":22},"劳动保险费、营业税、管理人员工资",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":27,"analysis":33},1145187,"下列税费项目中，属于企业管理费的是（ ）。",[238,239,240,241],{"key":20,"text":227,"correct":22},{"key":24,"text":229,"correct":22},{"key":27,"text":231,"correct":32},{"key":30,"text":233,"correct":22},{"id":243,"libraryId":5,"type":36,"typeLabel":37,"stem":244,"options":245,"answer":256,"analysis":33},1145188,"建筑工程施工中，工期索赔的计算方法包括（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":32},"网络分析法",{"key":24,"text":249,"correct":32},"比例分析法",{"key":27,"text":251,"correct":22},"总费用法",{"key":30,"text":253,"correct":22},"分项法",{"key":49,"text":255,"correct":22},"经验法","AB",{"id":258,"libraryId":5,"type":36,"typeLabel":37,"stem":259,"options":260,"answer":51,"analysis":33},1145189,"工程竣工结算的调整方法有（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"造价管理法",{"key":24,"text":264,"correct":32},"实际价格法",{"key":27,"text":266,"correct":32},"工程造价指数调整法",{"key":30,"text":268,"correct":32},"调值公式法",{"key":49,"text":270,"correct":32},"调价系数法",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":30,"analysis":33},1145190,"新住宅室内装饰装修在正常使用条件下，对有防水要求的厨房、卫生间和外墙面的防渗漏，最低保修期限为（ ）年，保修期自住宅室内装饰装修工程竣工验收合格之日起计算。",[275,277,279,281],{"key":20,"text":276,"correct":22},"2",{"key":24,"text":278,"correct":22},"3",{"key":27,"text":280,"correct":22},"4",{"key":30,"text":282,"correct":32},"5",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":27,"analysis":33},1145191,"工程预付款支付时间的说法，正确的是（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"在具备施工的前提下，约定开工日期前15d内",{"key":24,"text":290,"correct":22},"约定开工10d内",{"key":27,"text":292,"correct":32},"在开工通知载明的开工日期7d前",{"key":30,"text":294,"correct":22},"在具备施工的前提下，双方签订合同后10d内",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":30,"analysis":33},1145192,"工程预付款回扣，关于起扣点的计算公式下列各项中正确的是（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":22},"起扣点=合同总价-（预付备料款／预付备料款所占的比重）",{"key":24,"text":302,"correct":22},"起扣点=合同总价-（预付备料款／直接费所占的比重）",{"key":27,"text":304,"correct":22},"起扣点=承包工程材料款的总额-（预付备料款／预付备料款所占的比重）",{"key":30,"text":306,"correct":32},"起扣点=合同总价-（预付备料款／主要材料所占的比重）",{"id":308,"libraryId":5,"type":36,"typeLabel":37,"stem":309,"options":310,"answer":77,"analysis":33},1145193,"工程备料款数额的计算公式：工程备料款数额=（合同造价×材料比重）／年度施工天数×材料储备天数，公式中的材料储备天数应该由以下（ ）等因素决定。",[311,313,315,317,319],{"key":20,"text":312,"correct":32},"当地材料供应的在途天数",{"key":24,"text":314,"correct":32},"材料的整理天数",{"key":27,"text":316,"correct":22},"材料订购办理手续的天数",{"key":30,"text":318,"correct":32},"加工天数",{"key":49,"text":320,"correct":32},"保险天数",{"id":322,"libraryId":5,"type":36,"typeLabel":37,"stem":323,"options":324,"answer":169,"analysis":33},1145194,"建筑工程预付款额度的确定方法包括（ ）。",[325,326,328,330,332],{"key":20,"text":255,"correct":22},{"key":24,"text":327,"correct":22},"综合分析法",{"key":27,"text":329,"correct":32},"数学计算法",{"key":30,"text":331,"correct":22},"德尔菲法",{"key":49,"text":333,"correct":32},"百分比法",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":27,"analysis":33},1145195,"《建设工程施工合同（示范文本）》GF-2017-0201规定工程师在收到承包人送交的索赔报告的有关资料后，（ ）d未予答复或未对承包人作进一步要求，视为该项索赔被认可。",[338,340,342,344],{"key":20,"text":339,"correct":22},"7",{"key":24,"text":341,"correct":22},"14",{"key":27,"text":343,"correct":32},"28",{"key":30,"text":345,"correct":22},"56",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},1145196,"工程实施过程中出现不可抗力事件导致的费用，关于发、承包双方承担的说法，错误的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":32},"工程修复费用由发包人承担，工程清理费用由承包人承担",{"key":24,"text":353,"correct":22},"发包人、承包人人员的伤亡由其所在单位负责，并承担相应费用",{"key":27,"text":355,"correct":22},"承包人的施工机械设备损坏及停工损失，由承包人承担",{"key":30,"text":357,"correct":22},"停工期间承包人应发包人要求留在施工现场的必要管理人员及保卫人员的费用，由发包人承担",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},1145197,"承包人在施工中遇到暴雨袭击，导致工程停工，同时发生各项费用损失，按照不可抗力索赔处理原则，下列费用中发包人不予赔偿的是（ ），",[362,364,366,368],{"key":20,"text":363,"correct":22},"被冲坏已施工的基础工程",{"key":24,"text":365,"correct":32},"停工期间设备闲置",{"key":27,"text":367,"correct":22},"清理现场，恢复施工",{"key":30,"text":369,"correct":22},"被冲坏的现场临时道路恢复",{"id":371,"libraryId":5,"type":36,"typeLabel":37,"stem":372,"options":373,"answer":384,"analysis":33},1145198,"因为分部分项工程量清单漏项或非承包人原因的工程变更而引起的措施项目发生变化，且造成了施工组织设计或施工方案变更，可调整的方式有（ ）。",[374,376,378,380,382],{"key":20,"text":375,"correct":32},"原措施费中已有的措施项目，按原措施费的组价方法调整",{"key":24,"text":377,"correct":32},"原措施费中有类似的项目的，参考类似项组价方法调整",{"key":27,"text":379,"correct":22},"原措施费中没有的措施项目，由发包人根据措施项目变更情况，提出适当的措施变更，经双方确认后进行调整",{"key":30,"text":381,"correct":32},"原措施费中没有的措施项目，由承包人根据措施项目变更情况，提出适当的措施变更，发包人确认后进行调整",{"key":49,"text":383,"correct":22},"原措施费中没有的措施项目，由监理方根据措施项目变更情况，提出适当的措施变更，经发包方确认后进行调整","ABD",{"id":386,"libraryId":5,"type":36,"typeLabel":37,"stem":387,"options":388,"answer":221,"analysis":33},1145199,"宜采用固定总价合同的计价方式的建设工程项目有（ ）。",[389,391,393,395,397],{"key":20,"text":390,"correct":32},"已经具备完整、详细的工程设计和必需的施工技术管理文件",{"key":24,"text":392,"correct":32},"工程量小，工程规模不大",{"key":27,"text":394,"correct":32},"工程技术结构简单，建设工期较短",{"key":30,"text":396,"correct":32},"前期招标工作准备充分，投标人准备时间充足",{"key":49,"text":398,"correct":22},"施工期内人工、材料、机械等要素市场价格可能发生较大变化",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":27,"analysis":33},1145200,"由于分部分项工程量清单漏项或其他非承包人原因的工程变更，造成工程量清单出现新增项，对于新增项的综合单价的确定方法，下列各项中不正确的是（ ）。",[403,405,407,409],{"key":20,"text":404,"correct":22},"合同中已有适用的综合单价，按合同中已有的综合单价确定",{"key":24,"text":406,"correct":22},"合同中有类似的综合单价，参照类似综合单价",{"key":27,"text":408,"correct":32},"合同中没有适用或类似的综合单价，由承包人提出综合单价，经监理单位确认后执行",{"key":30,"text":410,"correct":22},"合同中没有适用或类似的综合单价，由承包人提出综合单价，经发包人确认后执行",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":24,"analysis":33},1145201,"实行工程量清单计价的工程，宜采用（ ）合同。",[415,417,419,421],{"key":20,"text":416,"correct":22},"总价",{"key":24,"text":418,"correct":32},"单价",{"key":27,"text":420,"correct":22},"可调价",{"key":30,"text":422,"correct":22},"成本加酬金",{"id":424,"libraryId":5,"type":36,"typeLabel":37,"stem":425,"options":426,"answer":221,"analysis":33},1145202,"宜采用成本加酬金合同的计价方式的建设工程项目有（ ）。",[427,429,431,433,435],{"key":20,"text":428,"correct":32},"紧急抢修的工程项目",{"key":24,"text":430,"correct":32},"灾后重建的工程项目",{"key":27,"text":432,"correct":32},"新型项目",{"key":30,"text":434,"correct":32},"施工内容、经济指标不确定的工程项目",{"key":49,"text":436,"correct":22},"合同价格缺乏工程设计文件和施工技术管理条件的",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":27,"analysis":33},1145203,"下列工程项目条件中，不宜采用固定总价合同的是（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":22},"工程施工周期比较短",{"key":24,"text":444,"correct":22},"设计图纸资料齐全",{"key":27,"text":446,"correct":32},"工程技术结构复杂",{"key":30,"text":448,"correct":22},"投标人投标准备期相对较长",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1145204,"关于因素分析法排序，说法正确的是（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"先价值量，后工程量；先绝对数，后相对数",{"key":24,"text":456,"correct":32},"先工程量，后价值量；先绝对数，后相对数",{"key":27,"text":458,"correct":22},"先价值量，后工程量；先相对数，后绝对数",{"key":30,"text":460,"correct":22},"先工程量，后工程量，先相对数，后绝对数",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":30,"analysis":33},1145205,"因素分析法的本质是分析各种因素对成本的影响，采用（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"差额分析法",{"key":24,"text":468,"correct":22},"比较法",{"key":27,"text":470,"correct":22},"比率法",{"key":30,"text":472,"correct":32},"连环替代法",{"id":474,"libraryId":5,"type":36,"typeLabel":37,"stem":475,"options":476,"answer":487,"analysis":33},1145206,"采用连环替代法排序原则的说法，正确的有（ ）。",[477,479,481,483,485],{"key":20,"text":478,"correct":22},"先价值量，后工程量",{"key":24,"text":480,"correct":32},"先工程量，后价值量",{"key":27,"text":482,"correct":32},"先绝对数，后相对数",{"key":30,"text":484,"correct":22},"先相对数，后绝对数",{"key":49,"text":486,"correct":22},"先相对数，后实际数","BC",{"id":489,"libraryId":5,"type":36,"typeLabel":37,"stem":490,"options":491,"answer":77,"analysis":33},1145207,"属于工程成本分析方法中基本分析方法的有（ ）。",[492,493,494,496,497],{"key":20,"text":468,"correct":32},{"key":24,"text":466,"correct":32},{"key":27,"text":495,"correct":22},"DeIphi法",{"key":30,"text":470,"correct":32},{"key":49,"text":498,"correct":32},"因素分析法",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":30,"analysis":33},1145208,"通常情况下，BCWS在整个工作实施过程应保持不变，但当（ ）时则会有变化。",[503,505,507,509],{"key":20,"text":504,"correct":22},"市场材料价格发生变化",{"key":24,"text":506,"correct":22},"市场人工费发生变化",{"key":27,"text":508,"correct":22},"项目措施项目发生变化",{"key":30,"text":510,"correct":32},"合同有变更",{"id":512,"libraryId":5,"type":36,"typeLabel":37,"stem":513,"options":514,"answer":525,"analysis":33},1145209,"下列评估结果中，表示进度延误的有（ ）。",[515,517,519,521,523],{"key":20,"text":516,"correct":22},"进度绩效指数SPI＞1",{"key":24,"text":518,"correct":32},"进度绩效指数SPI＜1",{"key":27,"text":520,"correct":22},"成本绩效指数CPI＜1",{"key":30,"text":522,"correct":22},"进度偏差SV为正值",{"key":49,"text":524,"correct":32},"进度偏差SV为负值","BE",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":30,"analysis":33},1145210,"关于进度绩效指数SPI的说法，正确的是（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"当SPI＜1时表示进度提前",{"key":24,"text":533,"correct":22},"当SPI＞1时表示进度延误",{"key":27,"text":535,"correct":22},"当SPI＜1时表示实际进度比计划进度快",{"key":30,"text":537,"correct":32},"当SPI＜1时表示实际进度比计划进度滞后",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1145211,"关于成本偏差CV的说法，正确的是（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"当CV为负值时，表示项目运行超出计划成本",{"key":24,"text":545,"correct":32},"当CV为负值时，表示项目运行超出预算成本",{"key":27,"text":547,"correct":22},"当CV为正值时，表示项目运行超出计划成本",{"key":30,"text":549,"correct":22},"当CV为正值时，表示项目运行超出预算成本",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},1145212,"如果把进度偏差与投资偏差联系起来，则进度偏差可表示为（ ）与已完工程计划投资的差异。",[554,556,558,560],{"key":20,"text":555,"correct":32},"拟完工程计划投资",{"key":24,"text":557,"correct":22},"已完工程实际投资",{"key":27,"text":559,"correct":22},"未完工程计划投资",{"key":30,"text":561,"correct":22},"已完工程计划投资",{"id":563,"libraryId":5,"type":36,"typeLabel":37,"stem":564,"options":565,"answer":576,"analysis":33},1145213,"用挣值法控制项目成本时，要运用到（ ）项的成本值进行分析。",[566,568,570,572,574],{"key":20,"text":567,"correct":22},"已完成工作的计划成本",{"key":24,"text":569,"correct":32},"已完成工作的预算成本",{"key":27,"text":571,"correct":32},"计划完成工作的预算成本",{"key":30,"text":573,"correct":22},"计划完成工作的实际成本",{"key":49,"text":575,"correct":32},"已完成工作的实际成本","BCE",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":30,"analysis":33},1145214,"挣值法的三个成本值不包括（ ）。",[581,582,583,584],{"key":20,"text":569,"correct":22},{"key":24,"text":575,"correct":22},{"key":27,"text":571,"correct":22},{"key":30,"text":573,"correct":32},{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":27,"analysis":33},1145215,"挣值法主要是通过分析项目成本实施与（ ）之间的差异，从而判断项目实施费用、进度绩效的一种方法。",[589,591,593,595],{"key":20,"text":590,"correct":22},"项目进度目标期望",{"key":24,"text":592,"correct":22},"项目成本目标计划",{"key":27,"text":594,"correct":32},"项目成本目标期望",{"key":30,"text":596,"correct":22},"项目成本节约",{"id":598,"libraryId":5,"type":36,"typeLabel":37,"stem":599,"options":600,"answer":103,"analysis":33},1145216,"运用价值工程原理分析，下列属于提高价值的途径的是（ ）。",[601,603,605,607,609],{"key":20,"text":602,"correct":32},"功能提高，成本不变",{"key":24,"text":604,"correct":22},"降低辅助功能",{"key":27,"text":606,"correct":32},"功能大大提高成本稍有提高",{"key":30,"text":608,"correct":32},"功能提高，成本降低",{"key":49,"text":610,"correct":22},"成本降低",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":20,"analysis":33},1145217,"运用价值工程进行成本控制时，应确定（ ）的项目作为价值改进对象，制定改进措施。",[615,617,619,621],{"key":20,"text":616,"correct":32},"价值系数小于1",{"key":24,"text":618,"correct":22},"价值系数等于1",{"key":27,"text":620,"correct":22},"价值系数大于1",{"key":30,"text":622,"correct":22},"价值系数等于0",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":20,"analysis":33},1145218,"对某个项目的各项分部工程进行功能评分如下，计算得出相应各项的预算成本：从上表中数值看出，（ ）成本比重偏高，应做重点分析，寻求降低成本的措施。",[627,629,631,633],{"key":20,"text":628,"correct":32},"主体结构工程",{"key":24,"text":630,"correct":22},"装饰装修工程",{"key":27,"text":632,"correct":22},"屋面工程",{"key":30,"text":634,"correct":22},"门窗工程",{"id":636,"libraryId":5,"type":36,"typeLabel":37,"stem":637,"options":638,"answer":487,"analysis":33},1145219,"下列宜用作工程成本控制方法的有（ ）。",[639,640,642,644,645],{"key":20,"text":468,"correct":22},{"key":24,"text":641,"correct":32},"价值工程",{"key":27,"text":643,"correct":32},"赢得值法",{"key":30,"text":466,"correct":22},{"key":49,"text":498,"correct":22},{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":30,"analysis":33},1145220,"按价值工程的原理，下列各种途径不可能提高产品价值的是（ ）。",[650,652,654,656],{"key":20,"text":651,"correct":22},"功能不变，成本降低",{"key":24,"text":653,"correct":22},"功能略有下降，成本大幅度降低",{"key":27,"text":655,"correct":22},"成本不变，功能提高",{"key":30,"text":657,"correct":32},"功能略有提高，成本大幅度提高",[659,662,665,668,671,674],{"id":15,"name":660,"category":7,"favorite":661},"领导干部任职前廉政法规知识测试题",92,{"id":663,"name":664,"category":7,"favorite":15},595,"建筑结构与设备",{"id":666,"name":667,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":669,"name":670,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":672,"name":673,"category":7,"favorite":8},534,"BIM工程师",{"id":675,"name":673,"category":7,"favorite":8},535]