[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":638},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,35,50,2362,[13,34,52,64,72,84,96,108,120,132,144,156,164,176,187,199,211,226,241,251,260,275,283,295,307,319,331,343,357,372,381,393,405,420,435,447,459,471,481,494,506,520,531,543,555,570,582,597,611,623],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1145120,1,"单选题","相关规范规定，脚手架主节点处两个直角扣件的中心距应在（ ）mm及以内。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","100",false,{"key":24,"text":25,"correct":22},"B","120",{"key":27,"text":28,"correct":29},"C","150",true,{"key":31,"text":32,"correct":22},"D","180","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1145121,2,"多选题","关于脚手架搭设的说法，正确的有（ ）。",[40,42,44,46,48],{"key":20,"text":41,"correct":29},"在双排脚手架中，离墙一端的外伸长度不应大于0.4倍的两节点的中心长度，且不应大于500mm",{"key":24,"text":43,"correct":22},"纵向扫地杆应采用直角扣件固定在距底座上皮不大于300mm处的立杆上",{"key":27,"text":45,"correct":29},"当立杆基础不在同一高度上时，高处的纵向扫地杆向低处延长两跨与立杆固定，高差不应大于1m",{"key":31,"text":47,"correct":29},"高度在24m以下的双排脚手架，外侧立面的两端各设置一道剪刀撑，中间各道剪刀撑之间的净距不应大于15m",{"key":49,"text":50,"correct":22},"E","高度在24m以下的双排脚手架，可采用刚性连墙件、柔性连墙件等与建筑物进行连接","ACD",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":20,"analysis":33},1145122,"对高度在24m以上的双排脚手架，必须采用（ ）与建筑可靠连接。",[56,58,60,62],{"key":20,"text":57,"correct":29},"刚性连墙件",{"key":24,"text":59,"correct":22},"柔性连墙件",{"key":27,"text":61,"correct":22},"刚性或柔性连墙件",{"key":31,"text":63,"correct":22},"拉筋和顶撑配合使用的连墙方式",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":27,"analysis":33},1145123,"脚手架主节点处两个直角扣件的中心距规定最大值是（ ）mm。",[68,69,70,71],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":29},{"key":31,"text":32,"correct":22},{"id":73,"libraryId":5,"type":15,"typeLabel":16,"stem":74,"options":75,"answer":24,"analysis":33},1145124,"脚手架必须配合施工进度搭设，一次搭设高度不应超过相邻连墙件以上（ ）步。",[76,78,80,82],{"key":20,"text":77,"correct":22},"一",{"key":24,"text":79,"correct":29},"二",{"key":27,"text":81,"correct":22},"三",{"key":31,"text":83,"correct":22},"四",{"id":85,"libraryId":5,"type":15,"typeLabel":16,"stem":86,"options":87,"answer":20,"analysis":33},1145125,"高大模板扣件式钢管支撑脚手架中，必须采用对接扣件连接的是（ ）。",[88,90,92,94],{"key":20,"text":89,"correct":29},"立杆",{"key":24,"text":91,"correct":22},"水平杆",{"key":27,"text":93,"correct":22},"竖向剪刀撑",{"key":31,"text":95,"correct":22},"水平剪刀撑",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":27,"analysis":33},1145126,"关于脚手架立杆底垫板的说法，正确的是（ ）。",[100,102,104,106],{"key":20,"text":101,"correct":22},"可采用具有一定强度的木质或金属垫板",{"key":24,"text":103,"correct":22},"垫板至少应超出架体立杆1跨长度100mm",{"key":27,"text":105,"correct":29},"采用木垫板时最小厚度不得小于50mm",{"key":31,"text":107,"correct":22},"垫板的宽度至少应为100mm",{"id":109,"libraryId":5,"type":15,"typeLabel":16,"stem":110,"options":111,"answer":24,"analysis":33},1145127,"关于墙体或部位脚手眼设置位置，下列说法中错误的是（ ）。",[112,114,116,118],{"key":20,"text":113,"correct":22},"120mm厚墙、料石清水墙和独立柱不得设置脚手眼",{"key":24,"text":115,"correct":29},"过梁上与过梁成60°的三角形以外的范围可以设置脚手眼",{"key":27,"text":117,"correct":22},"宽度大于1m的窗间墙可以设置脚手眼",{"key":31,"text":119,"correct":22},"梁或梁垫下及其左右500mm范围内不得设置脚手眼",{"id":121,"libraryId":5,"type":15,"typeLabel":16,"stem":122,"options":123,"answer":31,"analysis":33},1145128,"当必须配置专门向人工挖孔桩施工井下送风设备时，桩孔开挖深度最小值是（ ）m。",[124,126,128,130],{"key":20,"text":125,"correct":22},"5",{"key":24,"text":127,"correct":22},"6",{"key":27,"text":129,"correct":22},"8",{"key":31,"text":131,"correct":29},"10",{"id":133,"libraryId":5,"type":15,"typeLabel":16,"stem":134,"options":135,"answer":24,"analysis":33},1145129,"基坑周边堆放弃土、材料和移动施工机械时，应与坑边保持一定的距离，当土质良好时，要距坑（ ）。",[136,138,140,142],{"key":20,"text":137,"correct":22},"边沿留出不小于1.0m的安全距离，堆放高度不能超过1.0m",{"key":24,"text":139,"correct":29},"边沿留出不小于1.0m的安全距离，堆放高度不能超过1.5m",{"key":27,"text":141,"correct":22},"边沿留出不小于1.5m的安全距离，堆放高度否能超过1.0m",{"key":31,"text":143,"correct":22},"边沿留出不小于1.5m的安全距离，堆放高度不能超过1.5m",{"id":145,"libraryId":5,"type":15,"typeLabel":16,"stem":146,"options":147,"answer":31,"analysis":33},1145130,"基坑（槽）开挖时，两人操作间距最小值是（ ）m。",[148,150,152,154],{"key":20,"text":149,"correct":22},"1.5",{"key":24,"text":151,"correct":22},"1.8",{"key":27,"text":153,"correct":22},"2.0",{"key":31,"text":155,"correct":29},"2.5",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":31,"analysis":33},1145131,"人工基坑（槽）开挖时，两人操作间距最小值是（ ）m。",[160,161,162,163],{"key":20,"text":149,"correct":22},{"key":24,"text":151,"correct":22},{"key":27,"text":153,"correct":22},{"key":31,"text":155,"correct":29},{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":27,"analysis":33},1145132,"基坑开挖过程中，在坑边堆置弃土、材料时，其距坑边的距离不得小于（ ）m，堆放高度不能超过（ ）m。",[168,170,172,174],{"key":20,"text":169,"correct":22},"1.5；1.5",{"key":24,"text":171,"correct":22},"1.5；2.0",{"key":27,"text":173,"correct":29},"1.0；1.5",{"key":31,"text":175,"correct":22},"2.0；2.0",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":20,"analysis":33},1145133,"基坑周边严禁超堆荷载。在坑边堆放弃土、材料和移动施工机械时，应与坑边保持一定的距离，当土质良好时，要（ ）",[180,182,184,186],{"key":20,"text":181,"correct":29},"距坑边1m以外，堆放高度不能超过1.5m",{"key":24,"text":183,"correct":22},"边沿留出不小于0.5m的安全距离，堆放高度不能超过1.5m",{"key":27,"text":185,"correct":22},"边沿留出不小于1.5m的安全距离，堆放高度不能超过1.0m",{"key":31,"text":143,"correct":22},{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},1145134,"在土质良好的坑边堆放材料时，下列说法满足相关规定的是（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"距坑边0.8m以外，堆放高度不能超过1.5m",{"key":24,"text":194,"correct":29},"距坑边1.0m以外，堆放高度不能超过1.5m",{"key":27,"text":196,"correct":22},"距坑边0.8m以外，堆放高度不能超过1.8m",{"key":31,"text":198,"correct":22},"距坑边1.0m以外，堆放高度不能超过1.8m",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":27,"analysis":33},1145135,"发现危险源的重要途径是（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":22},"安全教育",{"key":24,"text":206,"correct":22},"安全监测",{"key":27,"text":208,"correct":29},"安全检查",{"key":31,"text":210,"correct":22},"安全责任制",{"id":212,"libraryId":5,"type":36,"typeLabel":37,"stem":213,"options":214,"answer":225,"analysis":33},1145136,"对于脚手架及其地基基础，应进行检查和验收的情况有（ ）。",[215,217,219,221,223],{"key":20,"text":216,"correct":29},"每搭设完6～8m高度后",{"key":24,"text":218,"correct":22},"五级大风天气过后",{"key":27,"text":220,"correct":29},"作业层上施加荷载前",{"key":31,"text":222,"correct":29},"冻结地区土层解冻后",{"key":49,"text":224,"correct":29},"停用40天后","ACDE",{"id":227,"libraryId":5,"type":36,"typeLabel":37,"stem":228,"options":229,"answer":240,"analysis":33},1145137,"下列事故类型中，属于建筑业最常发生事故类型的有()。",[230,232,234,236,238],{"key":20,"text":231,"correct":29},"触电",{"key":24,"text":233,"correct":29},"高处坠落",{"key":27,"text":235,"correct":22},"火灾",{"key":31,"text":237,"correct":29},"机械伤害",{"key":49,"text":239,"correct":29},"坍塌事故","ABDE",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":27,"analysis":33},1145138,"由于质量事故，造成人员死亡()人以上的为重大质量事故。",[245,247,249,250],{"key":20,"text":246,"correct":22},"2",{"key":24,"text":248,"correct":22},"3",{"key":27,"text":131,"correct":29},{"key":31,"text":125,"correct":22},{"id":252,"libraryId":5,"type":36,"typeLabel":37,"stem":253,"options":254,"answer":240,"analysis":33},1145139,"属建筑业最常发生事故类型的有()。",[255,256,257,258,259],{"key":20,"text":231,"correct":29},{"key":24,"text":233,"correct":29},{"key":27,"text":235,"correct":22},{"key":31,"text":237,"correct":29},{"key":49,"text":239,"correct":29},{"id":261,"libraryId":5,"type":36,"typeLabel":37,"stem":262,"options":263,"answer":274,"analysis":33},1145140,"工程质量问题的分类方法较多，依据住房和城乡建设部《关于做好房屋建筑和市政基础设施工程质量事故报告和调查处理工作的通知》（建质[2010]111号），根据工程质量问题造成的人员伤亡或者直接经济损失将工程质量问题分为()等级。",[264,266,268,270,272],{"key":20,"text":265,"correct":29},"较大事故",{"key":24,"text":267,"correct":29},"一般事故",{"key":27,"text":269,"correct":29},"重大事故",{"key":31,"text":271,"correct":29},"特别重大事故",{"key":49,"text":273,"correct":22},"微小事故","ABCD",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":31,"analysis":33},1145141,"某在建工程施工过程中不慎引燃外墙保温材料发生安全事故，事后统计，死亡5人，重伤68人，直接经济损失1.2亿元，该事故为(）。",[279,280,281,282],{"key":20,"text":267,"correct":22},{"key":24,"text":265,"correct":22},{"key":27,"text":269,"correct":22},{"key":31,"text":271,"correct":29},{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":31,"analysis":33},1145142,"目前我国对建筑安全生产的管理主要是针对()。",[287,289,291,293],{"key":20,"text":288,"correct":22},"质量问题",{"key":24,"text":290,"correct":22},"技术事故",{"key":27,"text":292,"correct":22},"环境事故",{"key":31,"text":294,"correct":29},"生产事故",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":20,"analysis":33},1145143,"某建筑工程室内防水工程由专业分包人施工，由于其管理组织不力，施工严重滞后，导致整个工程进度延误，据此发包人应向()提出工程索赔要求。",[299,301,303,305],{"key":20,"text":300,"correct":29},"总承包人",{"key":24,"text":302,"correct":22},"专业分包人",{"key":27,"text":304,"correct":22},"总承包人和专业分包人",{"key":31,"text":306,"correct":22},"总承包人或专业分包人",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":24,"analysis":33},1145144,"分包工程质量应由分包人向()负责。",[311,313,315,317],{"key":20,"text":312,"correct":22},"分包人",{"key":24,"text":314,"correct":29},"承包人",{"key":27,"text":316,"correct":22},"发包人",{"key":31,"text":318,"correct":22},"接收人",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},1145145,"《建设工程施工合同（示范文本）》GF-2017-0201 中关于合同文件组成部分：①图纸；②工程预算书；③投标书附件；④有关标准规范。如果上述文件就同一内容的约定不一致，则其优先解释顺序为()。",[323,325,327,329],{"key":20,"text":324,"correct":22},"③→④→②→①",{"key":24,"text":326,"correct":22},"①→②→③→④",{"key":27,"text":328,"correct":22},"①→②→④→③",{"key":31,"text":330,"correct":29},"③→④→①→②",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},1145146,"《建设工程施工合同（示范文本）》GF-2017-0201合同文件组成部分不包含的内容是()。",[335,337,339,341],{"key":20,"text":336,"correct":22},"专用条款",{"key":24,"text":338,"correct":29},"招标文件",{"key":27,"text":340,"correct":22},"投标文件",{"key":31,"text":342,"correct":22},"工程量清单",{"id":344,"libraryId":5,"type":36,"typeLabel":37,"stem":345,"options":346,"answer":356,"analysis":33},1145147,"《建设工程施工合同（示范文本）》GF-2017-0201主要由()三部分组成。",[347,349,351,353,355],{"key":20,"text":348,"correct":29},"通用条款",{"key":24,"text":350,"correct":22},"合同标准条件",{"key":27,"text":352,"correct":29},"协议书",{"key":31,"text":354,"correct":22},"补充和修正文件",{"key":49,"text":336,"correct":29},"ACE",{"id":358,"libraryId":5,"type":36,"typeLabel":37,"stem":359,"options":360,"answer":371,"analysis":33},1145148,"工程造价中不作为竞争性费用的有（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"措施项目清单中的检验及测试费",{"key":24,"text":364,"correct":29},"措施项目清单中的安全文明施工费",{"key":27,"text":366,"correct":29},"规费",{"key":31,"text":368,"correct":22},"保险",{"key":49,"text":370,"correct":29},"税金","BCE",{"id":373,"libraryId":5,"type":36,"typeLabel":37,"stem":374,"options":375,"answer":371,"analysis":33},1145149,"以工程量清单计价方式投标时，不得作为竞争性费用的有（ ）。",[376,377,378,379,380],{"key":20,"text":362,"correct":22},{"key":24,"text":364,"correct":29},{"key":27,"text":366,"correct":29},{"key":31,"text":368,"correct":22},{"key":49,"text":370,"correct":29},{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":24,"analysis":33},1145150,"为了方便投标人组价，需要纳入分部分项工程量清单项目综合单价中的暂估价应是（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"人工费和材料费",{"key":24,"text":388,"correct":29},"材料费",{"key":27,"text":390,"correct":22},"设备费",{"key":31,"text":392,"correct":22},"专业人工费",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":31,"analysis":33},1145151,"招标文件中，招标方提供的暂估价材料应（ ）。",[397,399,401,403],{"key":20,"text":398,"correct":22},"不能按暂估的单价计入综合单价",{"key":24,"text":400,"correct":22},"可不按暂估的单价计入综合单价",{"key":27,"text":402,"correct":22},"按材料的市场单价计入综合单价",{"key":31,"text":404,"correct":29},"按暂估的单价计入综合单价",{"id":406,"libraryId":5,"type":36,"typeLabel":37,"stem":407,"options":408,"answer":419,"analysis":33},1145152,"关于《建设工程工程量清单计价规范》GB50500-2013的说法，正确的有（ ）。",[409,411,413,415,417],{"key":20,"text":410,"correct":29},"工程量清单必须作为招标文件的组成部分",{"key":24,"text":412,"correct":29},"工程量清单的准确性和完整性由招标人负责",{"key":27,"text":414,"correct":22},"工程量清单的准确性和完整性由投标人负责",{"key":31,"text":416,"correct":29},"投标人应按招标工程量清单填报价格，计量单位、工程量必须与招标工程量清单一致",{"key":49,"text":418,"correct":22},"措施项目清单中的安全文明施工费可以作为竞争性费用","ABD",{"id":421,"libraryId":5,"type":36,"typeLabel":37,"stem":422,"options":423,"answer":434,"analysis":33},1145153,"下列费用项目中，属于其他项目清单内容列项是（ ）。",[424,426,428,430,432],{"key":20,"text":425,"correct":22},"风险费用",{"key":24,"text":427,"correct":29},"暂列金额",{"key":27,"text":429,"correct":29},"暂估价",{"key":31,"text":431,"correct":29},"总包服务费",{"key":49,"text":433,"correct":29},"计日工","BCDE",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":27,"analysis":33},1145154,"下列费用项目中，属于措施费内容的是（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":22},"文明施工费、脚手架费、工程排污费",{"key":24,"text":442,"correct":22},"工程排污费、文明施工费、临时设施费",{"key":27,"text":444,"correct":29},"文明施工费、脚手架费、临时设施费",{"key":31,"text":446,"correct":22},"脚手架费、工程排污费、临时设施费",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":31,"analysis":33},1145155,"在工程招投标的过程中，投标人完全不应承担的风险为（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":22},"技术风险",{"key":24,"text":454,"correct":22},"管理风险",{"key":27,"text":456,"correct":22},"材料价格风险",{"key":31,"text":458,"correct":29},"法律、法规变化的风险",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":27,"analysis":33},1145156,"关于工程量清单主要组成部分的说法，正确的是（ ）。",[463,465,467,469],{"key":20,"text":464,"correct":22},"分部分项工程量清单、措施项目清单、暂估价材料清单",{"key":24,"text":466,"correct":22},"分部分项工程量清单、措施项目清单、暂定金额部分清单",{"key":27,"text":468,"correct":29},"分部分项工程量清单、措施项目清单、其他项目清单",{"key":31,"text":470,"correct":22},"分部分项工程量清单、开办费用项目清单",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":31,"analysis":33},1145157,"措施项目可计量部分应按分部分项工程量清单的方式采用综合单价计价；其余的措施项目部分可以“项”为单位的方式计价，应包括除（ ）外的全部费用。",[475,476,477,479],{"key":20,"text":370,"correct":22},{"key":24,"text":366,"correct":22},{"key":27,"text":478,"correct":22},"利润",{"key":31,"text":480,"correct":29},"规费和税金",{"id":482,"libraryId":5,"type":36,"typeLabel":37,"stem":483,"options":484,"answer":225,"analysis":33},1145158,"属于单位工程费构成的有（ ）。",[485,487,489,491,493],{"key":20,"text":486,"correct":29},"其他项目清单合价",{"key":24,"text":488,"correct":22},"期间费",{"key":27,"text":490,"correct":29},"措施项目清单合价",{"key":31,"text":492,"correct":29},"分部分项工程量清单合价",{"key":49,"text":480,"correct":29},{"id":495,"libraryId":5,"type":36,"typeLabel":37,"stem":496,"options":497,"answer":505,"analysis":33},1145159,"固定单价合同计价方式下综合单价未包含的因素是（ ）。",[498,499,501,502,504],{"key":20,"text":478,"correct":22},{"key":24,"text":500,"correct":22},"风险",{"key":27,"text":366,"correct":29},{"key":31,"text":503,"correct":22},"管理费",{"key":49,"text":370,"correct":29},"CE",{"id":507,"libraryId":5,"type":36,"typeLabel":37,"stem":508,"options":509,"answer":519,"analysis":33},1145160,"属于综合单价的组成内容的有（ ）。",[510,512,514,516,518],{"key":20,"text":511,"correct":29},"人工费、材料费、机械费",{"key":24,"text":513,"correct":29},"管理费和利润",{"key":27,"text":515,"correct":29},"投标方自身风险的因素",{"key":31,"text":517,"correct":22},"其他项目费",{"key":49,"text":480,"correct":22},"ABC",{"id":521,"libraryId":5,"type":36,"typeLabel":37,"stem":522,"options":523,"answer":274,"analysis":33},1145161,"下列构成房屋工程造价的计价方式中综合单价的是（ ）。",[524,525,527,528,530],{"key":20,"text":388,"correct":29},{"key":24,"text":526,"correct":29},"人工费",{"key":27,"text":478,"correct":29},{"key":31,"text":529,"correct":29},"施工机具费",{"key":49,"text":480,"correct":22},{"id":532,"libraryId":5,"type":36,"typeLabel":37,"stem":533,"options":534,"answer":434,"analysis":33},1145162,"采用工程量清单计价时，属建筑工程造价组成内容的有（ ）。",[535,537,539,541,542],{"key":20,"text":536,"correct":22},"直接费和间接费",{"key":24,"text":538,"correct":29},"分部分项工程费",{"key":27,"text":540,"correct":29},"措施项目费",{"key":31,"text":517,"correct":29},{"key":49,"text":480,"correct":29},{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":24,"analysis":33},1145163,"关于《建设工程工程量清单计价规范》的运用，说法正确的是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},".非国有资金投资的建设工程，不宜采用工程量清单计价",{"key":24,"text":550,"correct":29},"分部分项工程和单价措施项目清单应采用综合单价计价",{"key":27,"text":552,"correct":22},"工程量清单必须作为招标文件的组成部分，其准确性和完整性由投标人负责",{"key":31,"text":554,"correct":22},"措施项目清单宜按照下列内容列项：暂列金额、暂估价、计日工、总承包务费C是由招标人负责",{"id":556,"libraryId":5,"type":36,"typeLabel":37,"stem":557,"options":558,"answer":569,"analysis":33},1145164,"必须采用工程量清单计价的建设工程有（ ）。",[559,561,563,565,567],{"key":20,"text":560,"correct":29},"全部使用国有资金投资的建设工程施工发承包",{"key":24,"text":562,"correct":22},"外资独资的建设工程施工发承包",{"key":27,"text":564,"correct":22},"非国有资金投资的建设工程发承包",{"key":31,"text":566,"correct":29},"国有资金投资为主的建设工程施工发承包",{"key":49,"text":568,"correct":22},"个人独资投资的建设工程发承包","AD",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":31,"analysis":33},1145165,"综合单价法全费用单价包含的内容有（ ）。",[574,576,578,580],{"key":20,"text":575,"correct":22},"直接费、间接费、管理费",{"key":24,"text":577,"correct":22},"直接费、间接费、利润、总包服务费",{"key":27,"text":579,"correct":22},"直接费、间接费、利润、营业税",{"key":31,"text":581,"correct":29},"直接费、间接费、利润",{"id":583,"libraryId":5,"type":36,"typeLabel":37,"stem":584,"options":585,"answer":596,"analysis":33},1145167,"属规费中的社会保障费的有（ ）。",[586,588,590,592,594],{"key":20,"text":587,"correct":22},"工程一切险",{"key":24,"text":589,"correct":29},"失业保险",{"key":27,"text":591,"correct":22},"危险作业意外伤害保险",{"key":31,"text":593,"correct":29},"养老保险",{"key":49,"text":595,"correct":29},"医疗保险","BDE",{"id":598,"libraryId":5,"type":36,"typeLabel":37,"stem":599,"options":600,"answer":274,"analysis":33},1145168,"总承包服务费是总承包人为了协调发包人进行（ ）等服务所发生的费用。",[601,603,605,607,609],{"key":20,"text":602,"correct":29},"对指定分包的服务和管理",{"key":24,"text":604,"correct":29},"建设单位自行采购的材料保管",{"key":27,"text":606,"correct":29},"对现场甲供材料进行管理",{"key":31,"text":608,"correct":29},"现场资料的管理",{"key":49,"text":610,"correct":22},"组织工程竣工验收",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":31,"analysis":33},1145169,"属于由工程承包人缴纳的税金是（ ）。",[615,617,619,621],{"key":20,"text":616,"correct":22},"城市建设维护及教育附加",{"key":24,"text":618,"correct":22},"营业税",{"key":27,"text":620,"correct":22},"印花税",{"key":31,"text":622,"correct":29},"增值税",{"id":624,"libraryId":5,"type":36,"typeLabel":37,"stem":625,"options":626,"answer":637,"analysis":33},1145170,"关于对其他项目费用计算规定的说法，正确的有（ ）。",[627,629,631,633,635],{"key":20,"text":628,"correct":22},"计日工应按监理方实际签证确认的事项计算",{"key":24,"text":630,"correct":22},"总承包服务费应依据合同约定金额计算，如发生调整的，以发包方确认调整金额计算",{"key":27,"text":632,"correct":29},"索赔费用应依据发、承包双方确认的索赔事项和金额计算",{"key":31,"text":634,"correct":29},"现场签证费用应依据发、承包双方签证资料确认的金额计算",{"key":49,"text":636,"correct":22},"暂列金额应减去工程价款调整与索赔、现场签证金额计算，如有余额归承包人","CD",[639,642,645,648,651,654],{"id":15,"name":640,"category":7,"favorite":641},"领导干部任职前廉政法规知识测试题",92,{"id":643,"name":644,"category":7,"favorite":15},595,"建筑结构与设备",{"id":646,"name":647,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":649,"name":650,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":652,"name":653,"category":7,"favorite":8},534,"BIM工程师",{"id":655,"name":653,"category":7,"favorite":8},535]