[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":677},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,33,50,2362,[13,38,52,64,79,91,106,118,133,145,159,174,186,200,214,229,241,256,271,286,300,312,325,338,353,364,373,385,397,409,421,435,449,463,477,491,500,514,527,539,551,566,578,592,605,619,632,644,656,665],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1145018,2,"多选题","建筑装饰装修工程所使用的材料应按设计要求进行（ ）处理。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","防火",true,{"key":24,"text":25,"correct":22},"B","防腐",{"key":27,"text":28,"correct":29},"C","防水",false,{"key":31,"text":32,"correct":22},"D","防虫",{"key":34,"text":35,"correct":29},"E","防锈","ABD","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":20,"analysis":37},1145019,1,"单选题","检查屋面是否有渗漏、积水和排水系统是否畅通，应在雨后或持续淋水（ ）h后进行。",[44,46,48,50],{"key":20,"text":45,"correct":22},"2",{"key":24,"text":47,"correct":29},"6",{"key":27,"text":49,"correct":29},"12",{"key":31,"text":51,"correct":29},"24",{"id":53,"libraryId":5,"type":40,"typeLabel":41,"stem":54,"options":55,"answer":31,"analysis":37},1145020,"关于室内地面防水施工质量验收程序的说法，正确的是（ ）。",[56,58,60,62],{"key":20,"text":57,"correct":29},"基层→防水层→蓄水试验→保护层→面层→验收",{"key":24,"text":59,"correct":29},"基层→防水层→保护层→面层→蓄水试验→验收",{"key":27,"text":61,"correct":29},"基层→防水层→蓄水试验→二次蓄水试验→保护层→面层→验收",{"key":31,"text":63,"correct":22},"基层→防水层→蓄水试验→保护层→面层→二次蓄水试验→验收",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":78,"analysis":37},1145021,"厕浴间、厨房聚氨酯防水涂料施工工艺流程中，保护层、饰面层施工前应进行的工序包括（ ）。",[68,70,72,74,76],{"key":20,"text":69,"correct":22},"清理基层",{"key":24,"text":71,"correct":22},"细部附加层施工",{"key":27,"text":73,"correct":22},"多遍涂刷聚氨酯防水涂料",{"key":31,"text":75,"correct":22},"第一次蓄水试验",{"key":34,"text":77,"correct":29},"第二次蓄水试验","ABCD",{"id":80,"libraryId":5,"type":40,"typeLabel":41,"stem":81,"options":82,"answer":27,"analysis":37},1145022,"厕浴间、厨房防水层完工后，应做（ ）蓄水试验。",[83,85,87,89],{"key":20,"text":84,"correct":29},"8h",{"key":24,"text":86,"correct":29},"12h",{"key":27,"text":88,"correct":22},"24h",{"key":31,"text":90,"correct":29},"48h",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":105,"analysis":37},1145023,"地下防水工程防水层基层状况质量检查的内容有（ ）。",[95,97,99,101,103],{"key":20,"text":96,"correct":22},"干燥",{"key":24,"text":98,"correct":22},"干净",{"key":27,"text":100,"correct":22},"平整度",{"key":31,"text":102,"correct":29},"分格缝",{"key":34,"text":104,"correct":22},"转角圆弧","ABCE",{"id":107,"libraryId":5,"type":40,"typeLabel":41,"stem":108,"options":109,"answer":24,"analysis":37},1145024,"厨房、厕浴的防水通常宜采用（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":29},"沥青卷材防水",{"key":24,"text":113,"correct":22},"涂膜防水",{"key":27,"text":115,"correct":29},"混凝土刚性防水",{"key":31,"text":117,"correct":29},"水泥砂浆防水",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":132,"analysis":37},1145025,"关于屋面、厕浴间防水工程蓄水试验的说法，正确的有（ ）。",[122,124,126,128,130],{"key":20,"text":123,"correct":22},"屋面在雨后或持续淋水2h后或蓄水时间不应少于24h",{"key":24,"text":125,"correct":29},"屋面在雨后或持续淋水2h后或蓄水时间不应少于12h",{"key":27,"text":127,"correct":22},"厨房、厕浴间做24h蓄水试验",{"key":31,"text":129,"correct":29},"厨房、厕浴间做12h蓄水试验",{"key":34,"text":131,"correct":22},"墙面间歇淋水试验应达到30min以上不渗漏。","ACE",{"id":134,"libraryId":5,"type":40,"typeLabel":41,"stem":135,"options":136,"answer":31,"analysis":37},1145026,"当涉及主体和承重结构改动或增加荷载时，必须由（ ）单位核查有关原始资料，对既有建筑结构的安全性进行核验、确认。",[137,139,141,143],{"key":20,"text":138,"correct":29},"建设",{"key":24,"text":140,"correct":29},"监理",{"key":27,"text":142,"correct":29},"施工",{"key":31,"text":144,"correct":22},"原结构设计",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":78,"analysis":37},1145027,"钢结构涂装工程质量检查的内容有（ ）。",[149,151,153,155,157],{"key":20,"text":150,"correct":22},"防腐涂料",{"key":24,"text":152,"correct":22},"间隔时间",{"key":27,"text":154,"correct":22},"涂装遍数",{"key":31,"text":156,"correct":22},"涂层厚度",{"key":34,"text":158,"correct":29},"涂料成分",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":173,"analysis":37},1145028,"钢筋混凝土实体检测所检查的项目有（ ）。",[163,165,167,169,171],{"key":20,"text":164,"correct":29},"组成材料的合格证及复试报告",{"key":24,"text":166,"correct":29},"现场同条件混凝土试件强度试验报告",{"key":27,"text":168,"correct":22},"混凝土强度",{"key":31,"text":170,"correct":22},"钢筋保护层厚度",{"key":34,"text":172,"correct":29},"混凝土养护方法及时间记录","CD",{"id":175,"libraryId":5,"type":40,"typeLabel":41,"stem":176,"options":177,"answer":24,"analysis":37},1145029,"后张法预应力工程的施工应由具备相应资质等级的预应力专业（ ）承担。",[178,180,182,184],{"key":20,"text":179,"correct":29},"建设单位",{"key":24,"text":181,"correct":22},"施工单位",{"key":27,"text":183,"correct":29},"设计单位",{"key":31,"text":185,"correct":29},"监理单位",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":105,"analysis":37},1145030,"钢筋混凝土构件合格证的内容有（ ）。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"生产单位",{"key":24,"text":193,"correct":22},"构件型号",{"key":27,"text":195,"correct":22},"生产日期",{"key":31,"text":197,"correct":29},"结构性能",{"key":34,"text":199,"correct":22},"质量验收标志",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":105,"analysis":37},1145031,"预应力混凝土工程施工是否符合设计和规范要求，主要检查的内容（ ）",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"预应力筋的品种、规格、数量、位置等",{"key":24,"text":207,"correct":22},"预应力锚具和连接器的品种、规格、数量、位置等",{"key":27,"text":209,"correct":22},"预留孔道的规格、数量、位置形状及灌浆孔、排气兼泌水管等",{"key":31,"text":211,"correct":29},"预埋件的品种、规格、数量、位置等",{"key":34,"text":213,"correct":22},"锚固区局部加强构造等",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},1145032,"砌体砂浆试块施工质量检查内容有（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"制作",{"key":24,"text":221,"correct":29},"配合比",{"key":27,"text":223,"correct":22},"养护",{"key":31,"text":225,"correct":22},"试块强度",{"key":34,"text":227,"correct":22},"数量","ACDE",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":78,"analysis":37},1145033,"砌体砂浆施工质量检查内容有（ ）。",[233,234,236,238,240],{"key":20,"text":221,"correct":22},{"key":24,"text":235,"correct":22},"计量",{"key":27,"text":237,"correct":22},"搅拌质量",{"key":31,"text":239,"correct":22},"试块",{"key":34,"text":227,"correct":29},{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":255,"analysis":37},1145034,"关于预应力钢筋混凝土工程的说法，正确的有（ ）。",[245,247,249,251,253],{"key":20,"text":246,"correct":29},"预应力筋张拉机具设备及仪表，主要检查校验记录和出厂合格证是否符合设计和规范要求",{"key":24,"text":248,"correct":22},"预应力筋主要检查品种、级别、规格、数量、位置、几何尺寸、外观状况及产品合格证、出厂检验报告，还需检查复验报告是否符合设计和规范要求",{"key":27,"text":250,"correct":22},"预应力筋锚具和连接器主要检查品种、规格、数量、位置等是否符合设计和规范要求",{"key":31,"text":252,"correct":29},"预留孔道主要检查规格、数量、位置、形状及尺寸是否符合设计和规范要求",{"key":34,"text":254,"correct":22},"灌浆及封锚主要检查水泥和外加剂产品合格证、出厂检验报告和进场复验报告、水泥浆配比和强度、灌浆记录、外露预应力钢筋切割方法、长度及封锚状况等是否符合设计和规范要求","BCE",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":270,"analysis":37},1145035,"打（压）桩工程施工结束后，下列检查项目中（ ）几项必须符合设计要求及规范规定。",[260,262,264,266,268],{"key":20,"text":261,"correct":29},"桩身垂直度",{"key":24,"text":263,"correct":22},"承载力检测",{"key":27,"text":265,"correct":29},"桩身贯人度",{"key":31,"text":267,"correct":22},"竣工位置偏差",{"key":34,"text":269,"correct":22},"桩身完整性检测","BDE",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":285,"analysis":37},1145036,"灰土地基施工过程中，工程质量应查验的项目有（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"分层铺设厚度",{"key":24,"text":278,"correct":22},"夯实时加水量",{"key":27,"text":280,"correct":29},"承载力",{"key":31,"text":282,"correct":22},"压实系数",{"key":34,"text":284,"correct":22},"夯压遍数","ABDE",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":78,"analysis":37},1145037,"重锤夯实或强夯地基工程施工过程中，工程质量查验的项目有（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"落距",{"key":24,"text":293,"correct":22},"夯击遍数",{"key":27,"text":295,"correct":22},"夯点位置",{"key":31,"text":297,"correct":22},"夯击范围",{"key":34,"text":299,"correct":29},"地基的承载力",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":173,"analysis":37},1145038,"强夯地基施工结束后，工程质量应查验的项目有（ ）。",[304,305,306,308,310],{"key":20,"text":293,"correct":29},{"key":24,"text":297,"correct":29},{"key":27,"text":307,"correct":22},"被夯地基强度",{"key":31,"text":309,"correct":22},"地基承载力",{"key":34,"text":311,"correct":29},"被夯地基土质",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":78,"analysis":37},1145039,"模板分项工程质量控制的检查内容有（ ）。",[316,318,319,321,323],{"key":20,"text":317,"correct":22},"设计",{"key":24,"text":219,"correct":22},{"key":27,"text":320,"correct":22},"安装",{"key":31,"text":322,"correct":22},"拆除",{"key":34,"text":324,"correct":29},"保养",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":78,"analysis":37},1145040,"钢筋分项工程质量控制的检查项目有（ ）。",[329,331,333,335,336],{"key":20,"text":330,"correct":22},"进场检验",{"key":24,"text":332,"correct":22},"加工",{"key":27,"text":334,"correct":22},"连接",{"key":31,"text":320,"correct":22},{"key":34,"text":337,"correct":29},"搬运",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":352,"analysis":37},1145041,"填方施工结束后，工程质量查验的内容有（ ）。",[342,344,346,348,350],{"key":20,"text":343,"correct":22},"标高",{"key":24,"text":345,"correct":22},"边坡坡度",{"key":27,"text":347,"correct":22},"压实程度",{"key":31,"text":349,"correct":29},"每层填筑厚度",{"key":34,"text":351,"correct":29},"排水措施","ABC",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":363,"analysis":37},1145042,"土方填方施工结束后，应检查（ ）。",[357,358,360,361,362],{"key":20,"text":349,"correct":29},{"key":24,"text":359,"correct":29},"含水量",{"key":27,"text":343,"correct":22},{"key":31,"text":345,"correct":22},{"key":34,"text":347,"correct":22},"CDE",{"id":365,"libraryId":5,"type":40,"typeLabel":41,"stem":366,"options":367,"answer":20,"analysis":37},1145043,"灰土、砂和砂石地基工程施工结束后，应检查其（ ）。",[368,369,371,372],{"key":20,"text":280,"correct":22},{"key":24,"text":370,"correct":29},"变形",{"key":27,"text":359,"correct":29},{"key":31,"text":343,"correct":29},{"id":374,"libraryId":5,"type":40,"typeLabel":41,"stem":375,"options":376,"answer":27,"analysis":37},1145044,"下列属于现场土方开挖前应检查的内容是（ ）。",[377,379,381,383],{"key":20,"text":378,"correct":29},"定位放线、周围环境和降低地下水位系统",{"key":24,"text":380,"correct":29},"定位放线、压实度和周围环境",{"key":27,"text":382,"correct":22},"定位放线、排水和降低地下水位系统",{"key":31,"text":384,"correct":29},"定位放线、运输路线和排水降水系统",{"id":386,"libraryId":5,"type":40,"typeLabel":41,"stem":387,"options":388,"answer":20,"analysis":37},1145045,"基坑验槽应重点观察（ ）或其他受力较大的部位。",[389,391,393,395],{"key":20,"text":390,"correct":22},"柱基.墙角.承重墙下",{"key":24,"text":392,"correct":29},"基坑中心",{"key":27,"text":394,"correct":29},"基坑四周",{"key":31,"text":396,"correct":29},"地基边缘",{"id":398,"libraryId":5,"type":40,"typeLabel":41,"stem":399,"options":400,"answer":27,"analysis":37},1145046,"观察验槽的重点应选择在（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":29},"基坑中心点",{"key":24,"text":404,"correct":29},"基坑边角处",{"key":27,"text":406,"correct":22},"受力较大的部位",{"key":31,"text":408,"correct":29},"最后开挖的部位",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":420,"analysis":37},1145047,"基坑（槽）回填土施工过程中，应查验的项目有（ ）。",[413,415,416,417,419],{"key":20,"text":414,"correct":29},"每层标高",{"key":24,"text":351,"correct":22},{"key":27,"text":349,"correct":22},{"key":31,"text":418,"correct":22},"回填土含水量",{"key":34,"text":347,"correct":22},"BCDE",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":434,"analysis":37},1145048,"基坑（槽）验槽时，如有异常部位，必须会同处理的单位有（ ）。",[425,427,428,430,432],{"key":20,"text":426,"correct":22},"勘察",{"key":24,"text":317,"correct":22},{"key":27,"text":429,"correct":29},"防水分包商",{"key":31,"text":431,"correct":29},"安全监督站",{"key":34,"text":433,"correct":29},"质量监督站","AB",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":420,"analysis":37},1145049,"土方开挖后，工程质量检验的内容有（ ）。",[439,441,443,445,447],{"key":20,"text":440,"correct":29},"核对基坑（槽）的定位放线、排水和降低地下水位系统",{"key":24,"text":442,"correct":22},"检查边坡稳定状况，确保边坡安全",{"key":27,"text":444,"correct":22},"核对基坑土质和地下水情况是否满足地质勘察报告和设计要求",{"key":31,"text":446,"correct":22},"有无破坏原状土结构或发生较大的土质扰动现象",{"key":34,"text":448,"correct":22},"用钎探法或轻型动力触探法等检查基坑（槽）是否存在软弱土下卧层及空穴、古墓、古井、防空掩体、地下埋设物等及相应的位置、深度、性状",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":434,"analysis":37},1145050,"土方开挖前，工程质量检查的内容有（ ）。",[453,455,457,459,461],{"key":20,"text":454,"correct":22},"定位放线",{"key":24,"text":456,"correct":22},"排水和降低地下水位系统",{"key":27,"text":458,"correct":29},"平面位置",{"key":31,"text":460,"correct":29},"水平标高",{"key":34,"text":462,"correct":29},"场地情况",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":36,"analysis":37},1145051,"基坑（槽）验槽时，应重点观察的部位有（ ）。",[467,469,471,473,475],{"key":20,"text":468,"correct":22},"承重墙下",{"key":24,"text":470,"correct":22},"柱基",{"key":27,"text":472,"correct":29},"横墙下",{"key":31,"text":474,"correct":22},"墙角",{"key":34,"text":476,"correct":29},"纵横墙交接处",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":78,"analysis":37},1145052,"关于建筑装饰装修对建筑结构影响的说法，正确的有()。",[481,483,485,487,489],{"key":20,"text":482,"correct":22},"当各种增加的装饰装修荷载不能控制在允许范围内时，应对结构重新进行验算",{"key":24,"text":484,"correct":22},"建筑装饰装修工程设计必须保证建筑物的结构安全和主要使用功能",{"key":27,"text":486,"correct":22},"建筑装饰装修工程施工中，严禁违反设计文件擅自改动建筑主体、承重结构和主要使用功能",{"key":31,"text":488,"correct":22},"建筑装饰装修工程施工中，严禁未经设计确认和有关部门批准擅自拆改水、暖、电、燃气、通信等配套设施",{"key":34,"text":490,"correct":29},"在设计和施工过程中，不必了解结构能承受的荷载值是多少",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":105,"analysis":37},1145053,"下列属于预应力混凝土需要检查和检验的内容有（ ）。",[495,496,497,498,499],{"key":20,"text":205,"correct":22},{"key":24,"text":207,"correct":22},{"key":27,"text":209,"correct":22},{"key":31,"text":211,"correct":29},{"key":34,"text":213,"correct":22},{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":228,"analysis":37},1145054,"墙体节能工程使用的保温隔热材料，其（ ）应符合设计要求。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"导热系数",{"key":24,"text":507,"correct":29},"蓄热系数",{"key":27,"text":509,"correct":22},"密度",{"key":31,"text":511,"correct":22},"压缩强度",{"key":34,"text":513,"correct":22},"燃烧性能",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":285,"analysis":37},1145055,"《建筑节能工程施工质量验收规范》GB50411—2007规定，夏热冬冷地区的建筑外门窗进入施工现场时，应对其（ ）性能进行复验。",[518,520,522,523,525],{"key":20,"text":519,"correct":22},"气密性",{"key":24,"text":521,"correct":22},"传热系数",{"key":27,"text":507,"correct":29},{"key":31,"text":524,"correct":22},"中空玻璃露点",{"key":34,"text":526,"correct":22},"可见光透射比",{"id":528,"libraryId":5,"type":40,"typeLabel":41,"stem":529,"options":530,"answer":31,"analysis":37},1145056,"填充墙与承重主体结构间的空（缝）隙部位施工，应在填充墙砌筑（ ）后进行。",[531,533,535,537],{"key":20,"text":532,"correct":29},"3d",{"key":24,"text":534,"correct":29},"7d",{"key":27,"text":536,"correct":29},"10d",{"key":31,"text":538,"correct":22},"14d",{"id":540,"libraryId":5,"type":40,"typeLabel":41,"stem":541,"options":542,"answer":24,"analysis":37},1145057,"钢结构工程中连接板拼装不严密的防治措施错误的是（ ）。",[543,545,547,549],{"key":20,"text":544,"correct":29},"连接处钢板应平直，变形较大者应调整后使用",{"key":24,"text":546,"correct":22},"连接型钢或零件平面坡度大于1：20时，可不作处理",{"key":27,"text":548,"correct":29},"连接板间的间隙大于3mm，填入垫板，垫板的表面与构件同样处理",{"key":31,"text":550,"correct":29},"连接板之间的间隙小于1mm的，可不作处理",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":565,"analysis":37},1145058,"关于混凝土出现收缩裂缝可能原因的说法，正确的有（ ）。",[555,557,559,561,563],{"key":20,"text":556,"correct":22},"砂、石料含泥量大",{"key":24,"text":558,"correct":29},"混凝土中掺有粉煤灰",{"key":27,"text":560,"correct":22},"混凝土水灰比过大",{"key":31,"text":562,"correct":22},"配合比单方水泥用量偏大",{"key":34,"text":564,"correct":29},"混凝土所处环境湿度偏大","ACD",{"id":567,"libraryId":5,"type":40,"typeLabel":41,"stem":568,"options":569,"answer":27,"analysis":37},1145059,"孔口坍塌时，应先探明位置，将砂和黏土混合物回填到坍孔位置以上（ ）m，如坍孔严重，应全部回填，等回填物沉积密实后再进行钻孔。",[570,572,574,576],{"key":20,"text":571,"correct":29},"0～0.5",{"key":24,"text":573,"correct":29},"0.5～1.0",{"key":27,"text":575,"correct":22},"1.0～2.0",{"key":31,"text":577,"correct":29},"2.0～3.0",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":228,"analysis":37},1145060,"工程质量事故处罚相关单位的方式有（ ）。",[582,584,586,588,590],{"key":20,"text":583,"correct":22},"罚款",{"key":24,"text":585,"correct":29},"通报批评",{"key":27,"text":587,"correct":22},"停业整顿",{"key":31,"text":589,"correct":22},"降低资质等级",{"key":34,"text":591,"correct":22},"吊销资质证书",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":285,"analysis":37},1145061,"工程质量事故处罚负有责任的注册执业人员的方式有（ ）。",[596,597,599,601,603],{"key":20,"text":583,"correct":22},{"key":24,"text":598,"correct":22},"停止执业",{"key":27,"text":600,"correct":29},"记过处分",{"key":31,"text":602,"correct":22},"终身不予注册",{"key":34,"text":604,"correct":22},"吊销执业资格证书",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":78,"analysis":37},1145062,"下列内容中，属于工程质量事故调查报告的有（ ）。",[609,611,613,615,617],{"key":20,"text":610,"correct":22},"事故项目及各参建单位概况",{"key":24,"text":612,"correct":22},"事故发生经过和事故救援情况",{"key":27,"text":614,"correct":22},"事故造成的人员伤亡和直接经济损失",{"key":31,"text":616,"correct":22},"事故项目有关质量检测报告和技术分析报告",{"key":34,"text":618,"correct":29},"事故发生后采取的措施及事故控制情况",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":78,"analysis":37},1145064,"属于工程质量事故报告内容的有（ ）。",[623,625,627,629,630],{"key":20,"text":624,"correct":22},"事故发生的时间、地点、工程项目名称、工程各参建单位名称",{"key":24,"text":626,"correct":22},"事故发生的简要经过、伤亡人数和初步估计的直接经济损失",{"key":27,"text":628,"correct":22},"事故的初步原因",{"key":31,"text":618,"correct":22},{"key":34,"text":631,"correct":29},"事故发生的原因和事故性质",{"id":633,"libraryId":5,"type":40,"typeLabel":41,"stem":634,"options":635,"answer":27,"analysis":37},1145065,"建筑工程重大质量事故的处理程序中，事故报告后出现新情况，以及事故发生之日起（ ）d内伤亡人数发生变化的，应当及时补报。",[636,638,640,642],{"key":20,"text":637,"correct":29},"10",{"key":24,"text":639,"correct":29},"20",{"key":27,"text":641,"correct":22},"30",{"key":31,"text":643,"correct":29},"40",{"id":645,"libraryId":5,"type":40,"typeLabel":41,"stem":646,"options":647,"answer":20,"analysis":37},1145066,"工程质量事故发生后，工程建设单位负责人接到报告后，应于（ ）内向事故发生地有关部门报告出书面报告。",[648,650,652,654],{"key":20,"text":649,"correct":22},"1小时",{"key":24,"text":651,"correct":29},"2小时",{"key":27,"text":653,"correct":29},"3小时",{"key":31,"text":655,"correct":29},"4小时",{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":78,"analysis":37},1145067,"下列内容中，属于工程质量事故报告的有（ ）。",[660,661,662,663,664],{"key":20,"text":624,"correct":22},{"key":24,"text":626,"correct":22},{"key":27,"text":628,"correct":22},{"key":31,"text":618,"correct":22},{"key":34,"text":631,"correct":29},{"id":666,"libraryId":5,"type":40,"typeLabel":41,"stem":667,"options":668,"answer":31,"analysis":37},1145068,"下列质量问题常见成因中，属于管理事故成因的是（ ）。",[669,671,673,675],{"key":20,"text":670,"correct":29},"预埋件偏位",{"key":24,"text":672,"correct":29},"不均匀沉降",{"key":27,"text":674,"correct":29},"防水材料质量不合格",{"key":31,"text":676,"correct":22},"分部分项工程施工顺序不当",[678,681,684,687,690,693],{"id":40,"name":679,"category":7,"favorite":680},"领导干部任职前廉政法规知识测试题",92,{"id":682,"name":683,"category":7,"favorite":40},595,"建筑结构与设备",{"id":685,"name":686,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":688,"name":689,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":691,"name":692,"category":7,"favorite":8},534,"BIM工程师",{"id":694,"name":692,"category":7,"favorite":8},535]