[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-800-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":658},{"id":5,"name":6,"category":7,"favorite":8},800,"一建建筑工程实务","建筑工程",0,31,50,2362,[13,38,52,64,79,93,105,120,135,150,162,174,186,198,210,225,239,254,266,278,290,305,317,329,344,353,365,377,389,403,415,427,441,453,465,479,491,503,512,527,537,551,560,574,583,594,608,622,636,650],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1144917,2,"多选题","冬期施工不得采用掺氯盐砂浆砌筑的砌体有()。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","对装饰工程有特殊要求的建筑物",true,{"key":24,"text":25,"correct":22},"B","配筋、钢埋件无可靠防腐处理措施的砌体",{"key":27,"text":28,"correct":22},"C","接近高压电线的建筑物（如变电所、发电站等）",{"key":30,"text":31,"correct":22},"D","经常处于地下水位变化范围内的结构",{"key":33,"text":34,"correct":35},"E","地下已设防水层的结构",false,"ABCD","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":27,"analysis":37},1144918,1,"单选题","冬期施工混凝土搅拌时，当仅加热拌合水不能满足热工计算要求时，可直接加热的混凝土原材料是()。",[44,46,48,50],{"key":20,"text":45,"correct":35},"水泥",{"key":24,"text":47,"correct":35},"外加剂",{"key":27,"text":49,"correct":22},"骨料",{"key":30,"text":51,"correct":35},"矿物掺合料",{"id":53,"libraryId":5,"type":40,"typeLabel":41,"stem":54,"options":55,"answer":27,"analysis":37},1144919,"冬期施工混凝土配合比宜选择较小的配合比指标是()。",[56,58,60,62],{"key":20,"text":57,"correct":35},"水灰比和坍落度",{"key":24,"text":59,"correct":35},"水灰比和外加剂掺量",{"key":27,"text":61,"correct":22},"水胶比和坍落度",{"key":30,"text":63,"correct":35},"水胶比和外加剂掺量",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":78,"analysis":37},1144920,"关于冬期施工冻土回填的说法，正确的有()。",[68,70,72,74,76],{"key":20,"text":69,"correct":22},"室外的基槽（坑）或管沟可采用含有冻土块的土回填",{"key":24,"text":71,"correct":22},"填方边坡的表层1m以内，不得采用含有冻土块的土填筑",{"key":27,"text":73,"correct":22},"室外管沟底以上500mm的范围内不得用含有冻土块的土回填",{"key":30,"text":75,"correct":35},"室内的基槽（坑）或管沟可采用含有冻土块的土回填",{"key":33,"text":77,"correct":35},"室内地面垫层下回填的土方，填料中可含有冻土块","ABC",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":78,"analysis":37},1144921,"关于冬期桩基施工的说法，正确的有()。",[83,85,87,89,91],{"key":20,"text":84,"correct":22},"当冻土层厚度超过500mm，冻土层宜采用钻孔机引孔",{"key":24,"text":86,"correct":22},"采用钻孔机引孔，引孔直径不宜大于桩径20mm",{"key":27,"text":88,"correct":22},"振动沉管成孔施工有间歇时，宜将桩管埋人桩孔中进行保温",{"key":30,"text":90,"correct":35},"桩基静荷载试验前，应对试桩周围地表土和锚桩横梁支座进行保温",{"key":33,"text":92,"correct":35},"试验期间，应将试桩周围的冻土融化或挖除",{"id":94,"libraryId":5,"type":40,"typeLabel":41,"stem":95,"options":96,"answer":20,"analysis":37},1144922,"冬期土方回填每层铺土厚度应比常温施工时减少()。",[97,99,101,103],{"key":20,"text":98,"correct":22},"20%～25%",{"key":24,"text":100,"correct":35},"25%～30%",{"key":27,"text":102,"correct":35},"30%～35%",{"key":30,"text":104,"correct":35},"35%～40%",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":119,"analysis":37},1144923,"关于冬期施工砌体工程的说法，正确的有()。",[109,111,113,115,117],{"key":20,"text":110,"correct":22},"应编制冬期施工专项方案",{"key":24,"text":112,"correct":22},"不得使用遭水浸和受冻后表面结冰、污染的砖或砌块",{"key":27,"text":114,"correct":22},"砌筑砂浆宜采用普通硅酸盐水泥配制，不得使用无水泥拌制的砂浆",{"key":30,"text":116,"correct":35},"最低气温等于或低于-25℃时，砌体砂浆强度等级应较常温施工提高一级",{"key":33,"text":118,"correct":22},"暖棚法施工时，暖棚内的最低温度不应低于5℃","ABCE",{"id":121,"libraryId":5,"type":15,"typeLabel":16,"stem":122,"options":123,"answer":134,"analysis":37},1144924,"下列检验项目中，属于混凝土结构实体质量检测项目的有()。",[124,126,128,130,132],{"key":20,"text":125,"correct":35},"钢筋原材质量",{"key":24,"text":127,"correct":22},"钢筋保护层厚度",{"key":27,"text":129,"correct":35},"混凝土标准养护强度",{"key":30,"text":131,"correct":22},"混凝土同条件养护强度",{"key":33,"text":133,"correct":35},"结构实体外观质量","BD",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":149,"analysis":37},1144925,"当下列情况发生时，应调整施工检测试验计划的有()。",[139,141,143,145,147],{"key":20,"text":140,"correct":22},"设计变更",{"key":24,"text":142,"correct":35},"检测单位改变",{"key":27,"text":144,"correct":35},"见证人变更",{"key":30,"text":146,"correct":22},"施工进度调整",{"key":33,"text":148,"correct":22},"材料型号变更","ADE",{"id":151,"libraryId":5,"type":40,"typeLabel":41,"stem":152,"options":153,"answer":20,"analysis":37},1144926,"基坑土方回填时，施工过程质量检测试验的项目通常不包括()。",[154,156,158,160],{"key":20,"text":155,"correct":22},"承载力",{"key":24,"text":157,"correct":35},"最优含水量",{"key":27,"text":159,"correct":35},"压实系数",{"key":30,"text":161,"correct":35},"最大干密度",{"id":163,"libraryId":5,"type":40,"typeLabel":41,"stem":164,"options":165,"answer":24,"analysis":37},1144927,"建筑工程施工现场检测试验技术管理程序的第一步应是()。",[166,168,170,172],{"key":20,"text":167,"correct":35},"制取试样",{"key":24,"text":169,"correct":22},"制订检测计划",{"key":27,"text":171,"correct":35},"登记台账",{"key":30,"text":173,"correct":35},"试验报告管理",{"id":175,"libraryId":5,"type":40,"typeLabel":41,"stem":176,"options":177,"answer":30,"analysis":37},1144928,"已知某写字楼工程双代号网络计划的计划工期等于计算工期，且工作F的完成节点为关键节点，则该工作（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":35},"为关键工作",{"key":24,"text":181,"correct":35},"自由时差小于总时差",{"key":27,"text":183,"correct":35},"自由时差为零",{"key":30,"text":185,"correct":22},"自由时差等于总时差",{"id":187,"libraryId":5,"type":40,"typeLabel":41,"stem":188,"options":189,"answer":30,"analysis":37},1144929,"工程网络计划资源优化的目的之一是为了寻求（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":35},"资源均衡使用条件下的最短工期安排",{"key":24,"text":193,"correct":35},"工程总成本最低条件下的资源均衡安排",{"key":27,"text":195,"correct":35},"资源使用量最少条件下的合理工期安排",{"key":30,"text":197,"correct":22},"工期固定条件下的资源均衡安排",{"id":199,"libraryId":5,"type":40,"typeLabel":41,"stem":200,"options":201,"answer":24,"analysis":37},1144930,"在网络计划工期优化过程中，当出现多条关键线路时，在考虑对质量、安全影响的基础上，优先选择的压缩对象应是各条关键线路上（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":35},"缩短持续时间所需增加的资源、费用最多的工作",{"key":24,"text":205,"correct":22},"缩短持续时间对质量和安全影响不大的工作",{"key":27,"text":207,"correct":35},"缩短持续时间对质量影响大的工作",{"key":30,"text":209,"correct":35},"缩短持续时间对安全影响大的工作",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":224,"analysis":37},1144931,"对工程网络计划进行优化，其目的使该工程（ ）。",[214,216,218,220,222],{"key":20,"text":215,"correct":35},"资源强度最低",{"key":24,"text":217,"correct":22},"总费用最低",{"key":27,"text":219,"correct":22},"资源需用量尽可能均衡",{"key":30,"text":221,"correct":35},"资源需用量最少",{"key":33,"text":223,"correct":22},"计算工期满足要求工期","BCE",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":238,"analysis":37},1144932,"在工程网络计划中，关键工作是（ ）的工作。",[229,231,233,234,236],{"key":20,"text":230,"correct":22},"总时差最小",{"key":24,"text":232,"correct":22},"关键线路上",{"key":27,"text":183,"correct":35},{"key":30,"text":235,"correct":35},"持续时间最长",{"key":33,"text":237,"correct":35},"两端节点为关键节点","AB",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":253,"analysis":37},1144933,"当工程网络计划的计划工期等于计算工期时，关于工程网络计划关键线路的说法，正确的有（ ）。",[243,245,247,249,251],{"key":20,"text":244,"correct":35},"双代号网络计划中由关键节点组成",{"key":24,"text":246,"correct":22},"双代号时标网络计划中没有波形线",{"key":27,"text":248,"correct":22},"双代号网络计划中总持续时间最长",{"key":30,"text":250,"correct":22},"时标网络计划中没有波形线",{"key":33,"text":252,"correct":22},"单代号搭接网络计划中相邻工作时间间隔均为零","BCDE",{"id":255,"libraryId":5,"type":40,"typeLabel":41,"stem":256,"options":257,"answer":24,"analysis":37},1144934,"在工程网络计划中，判别关键工作的条件是（ ）最小。",[258,260,262,264],{"key":20,"text":259,"correct":35},"自由时差",{"key":24,"text":261,"correct":22},"总时差",{"key":27,"text":263,"correct":35},"持续时间",{"key":30,"text":265,"correct":35},"时间间隔",{"id":267,"libraryId":5,"type":40,"typeLabel":41,"stem":268,"options":269,"answer":24,"analysis":37},1144935,"在工程网络计划的工期优化过程中，在缩短工怍持续时间对质量和安全影响不大的情况下，应选择的压缩对象是（ ）的关键工作。",[270,272,274,276],{"key":20,"text":271,"correct":35},"持续时间最长且资源消耗最少",{"key":24,"text":273,"correct":22},"缩短持续时间所需增加费用最少",{"key":27,"text":275,"correct":35},"持续时间最长且有充足备用资源",{"key":30,"text":277,"correct":35},"资源消耗少从而使直接费用最少",{"id":279,"libraryId":5,"type":40,"typeLabel":41,"stem":280,"options":281,"answer":20,"analysis":37},1144936,"当计算工期不能满足合同要求时，应首先压缩（ ）的持续时间。",[282,284,286,288],{"key":20,"text":283,"correct":22},"关键工作",{"key":24,"text":285,"correct":35},"非关键工作",{"key":27,"text":287,"correct":35},"总时差最长的工作",{"key":30,"text":289,"correct":35},"持续时间最长的工作",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":304,"analysis":37},1144937,"在网络计划的应用过程中，下列属于它的准备阶段工作的是（ ）。",[294,296,298,300,302],{"key":20,"text":295,"correct":22},"项目分解阶段",{"key":24,"text":297,"correct":35},"确定关键线路组织阶段",{"key":27,"text":299,"correct":22},"调查研究阶段",{"key":30,"text":301,"correct":22},"确定网络计划目标阶段",{"key":33,"text":303,"correct":35},"网络计划的确定阶段","ACD",{"id":306,"libraryId":5,"type":40,"typeLabel":41,"stem":307,"options":308,"answer":24,"analysis":37},1144938,"在工程网络计划中，某工作的最迟完成时间与其最早完成时间的差值是（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":35},"该工作的自由时差",{"key":24,"text":312,"correct":22},"该工作的总时差",{"key":27,"text":314,"correct":35},"该工作的持续时间",{"key":30,"text":316,"correct":35},"该工作与其紧后工作之间的时间间隔",{"id":318,"libraryId":5,"type":40,"typeLabel":41,"stem":319,"options":320,"answer":24,"analysis":37},1144939,"在工程网络计划的执行过程中，如果需要判断某工作进度偏差对总工期是否造成影响，应根据（ ）的差值确定。",[321,323,325,327],{"key":20,"text":322,"correct":35},"时差与进度偏差",{"key":24,"text":324,"correct":22},"总时差与进度偏差",{"key":27,"text":326,"correct":35},"自由时差与总时差",{"key":30,"text":328,"correct":35},"自由时差与进度偏差",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":343,"analysis":37},1144940,"在工程网络计划的执行过程中，关于需要调整原进度计划情况的说法，正确的有（ ）。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"项目总工期不允许拖延，但工作进度偏差已超过其总时差",{"key":24,"text":336,"correct":35},"项目总工期允许拖延，但工作进度偏差已超过其自由时差",{"key":27,"text":338,"correct":22},"后续工作不允许拖延，但工作进度偏差已超过其总时差",{"key":30,"text":340,"correct":35},"后续工作允许拖延，但工作进度偏差已超过其自由时差",{"key":33,"text":342,"correct":22},"项目总工期允许拖延的时间有限，但实际拖延的时间已超过此限制","ACE",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":343,"analysis":37},1144941,"在工程网络计划的执行过程中，当某项工作进度出现偏差后，需要调整原进度计划的情况有（ ）。",[348,349,350,351,352],{"key":20,"text":334,"correct":22},{"key":24,"text":336,"correct":35},{"key":27,"text":338,"correct":22},{"key":30,"text":340,"correct":35},{"key":33,"text":342,"correct":22},{"id":354,"libraryId":5,"type":40,"typeLabel":41,"stem":355,"options":356,"answer":30,"analysis":37},1144942,"在某工程双代号网络计划中，如果以关键节点为完成节点的工作有3项，则该3项工作（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":35},"自由时差相等",{"key":24,"text":360,"correct":35},"总时差相等",{"key":27,"text":362,"correct":35},"全部为关键工作",{"key":30,"text":364,"correct":22},"至少有一项为关键工作",{"id":366,"libraryId":5,"type":40,"typeLabel":41,"stem":367,"options":368,"answer":27,"analysis":37},1144943,"在工程网络计划执行过程中，若某项工作比原计划拖后，而未超过该工怍的自由时差，则（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":35},"不影响总工期，影响后续工作",{"key":24,"text":372,"correct":35},"不影响后续工作，影响总工期",{"key":27,"text":374,"correct":22},"对总工期及后续工作均不影响",{"key":30,"text":376,"correct":35},"对总工期及后续工作均有影响",{"id":378,"libraryId":5,"type":40,"typeLabel":41,"stem":379,"options":380,"answer":20,"analysis":37},1144944,"在工程网络计划中，工作的自由时差是指在不影响（ ）的前提下，该工作可以利用的机动时间。",[381,383,385,387],{"key":20,"text":382,"correct":22},"紧后工作最早开始",{"key":24,"text":384,"correct":35},"后续工作最迟开始",{"key":27,"text":386,"correct":35},"紧后工作最迟开始",{"key":30,"text":388,"correct":35},"本工作最早完成",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":238,"analysis":37},1144945,"网络计划的应用程序中，编制可行网络计划阶段的步骤包括（ ）。",[393,395,397,399,401],{"key":20,"text":394,"correct":22},"检查与修正",{"key":24,"text":396,"correct":22},"可行网络计划编制",{"key":27,"text":398,"correct":35},"编制施工方案",{"key":30,"text":400,"correct":35},"确定网络计划目标",{"key":33,"text":402,"correct":35},"控制和调整",{"id":404,"libraryId":5,"type":40,"typeLabel":41,"stem":405,"options":406,"answer":20,"analysis":37},1144946,"在无节奏流水施工中，通常用来计算流水步距的方法是（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"累加数列错位相减取差值最大值",{"key":24,"text":410,"correct":35},"累加数列错位相加取和值最小值",{"key":27,"text":412,"correct":35},"累加数列对应相减取差值最大值",{"key":30,"text":414,"correct":35},"累加数列对应相减取差值最小值",{"id":416,"libraryId":5,"type":40,"typeLabel":41,"stem":417,"options":418,"answer":20,"analysis":37},1144947,"已知某施工流水节拍表如下，计算其流水工期为（ ）d。",[419,421,423,425],{"key":20,"text":420,"correct":22},"14",{"key":24,"text":422,"correct":35},"19",{"key":27,"text":424,"correct":35},"20",{"key":30,"text":426,"correct":35},"21",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":119,"analysis":37},1144948,"关于无节奏流水施工的说法，正确的有（ ）。",[431,433,435,437,439],{"key":20,"text":432,"correct":22},"各施工过程间可能有间歇时间",{"key":24,"text":434,"correct":22},"各专业工作队能够在各施工段上连续作业，但有的施工过程间可能有间隔时间",{"key":27,"text":436,"correct":22},"各施工过程在各施工段上可能不连续作业",{"key":30,"text":438,"correct":35},"专业工作队数目与施工过程数目可能不等",{"key":33,"text":440,"correct":22},"各施工过程在各施工段上的流水节拍可能不等",{"id":442,"libraryId":5,"type":40,"typeLabel":41,"stem":443,"options":444,"answer":20,"analysis":37},1144949,"施工进度网络图比较，横道图的最大优点是（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":22},"直观表示计划中各工作的起止及持续时间",{"key":24,"text":448,"correct":35},"确定实施计划所需要的资源数量",{"key":27,"text":450,"correct":35},"直观表示计划中各工作的逻辑关系",{"key":30,"text":452,"correct":35},"确定计划中的关键工作和时差",{"id":454,"libraryId":5,"type":40,"typeLabel":41,"stem":455,"options":456,"answer":30,"analysis":37},1144950,"等步距异节奏流水施工特点中错误的是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":35},"同一施工过程在其各个施工段上的流水节拍均相等",{"key":24,"text":460,"correct":35},"不同施工过程的流水节拍不等，其值为倍数关系",{"key":27,"text":462,"correct":35},"相邻施工过程的流水步距相等",{"key":30,"text":464,"correct":22},"各个专业工作队在施工段上能够连续作业，施工段间有间隔时间",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":478,"analysis":37},1144951,"关于等步距异节奏流水施工特点的说法，错误的有（ ）。",[469,471,473,475,477],{"key":20,"text":470,"correct":22},"各施工过程在同一施工流水段上流水节拍相等",{"key":24,"text":472,"correct":22},"相邻施工过程之间的流水步距不相等",{"key":27,"text":474,"correct":35},"同一施工过程在各施工流水段上流水节拍相等",{"key":30,"text":476,"correct":22},"专业工作队数目与施工过程数目相等",{"key":33,"text":432,"correct":22},"ABDE",{"id":480,"libraryId":5,"type":40,"typeLabel":41,"stem":481,"options":482,"answer":27,"analysis":37},1144952,"下列流水施工的基本组织形式中，其专业工作队数大于施工过程数的是（ ）。",[483,485,487,489],{"key":20,"text":484,"correct":35},"等节奏流水施工",{"key":24,"text":486,"correct":35},"异步距异节奏流水施工",{"key":27,"text":488,"correct":22},"等步距异节奏流水施工",{"key":30,"text":490,"correct":35},"无节奏流水施工",{"id":492,"libraryId":5,"type":40,"typeLabel":41,"stem":493,"options":494,"answer":24,"analysis":37},1144953,"下列属于异步异节奏流水施工特点的是（ ）。",[495,497,499,501],{"key":20,"text":496,"correct":35},"流水步距等于流水节拍",{"key":24,"text":498,"correct":22},"专业工作队数目等于施工过程数目",{"key":27,"text":500,"correct":35},"所有施工过程在各施工段上的流水节拍均相等",{"key":30,"text":502,"correct":35},"不同施工过程在同一施工段上的流水节拍都相等",{"id":504,"libraryId":5,"type":40,"typeLabel":41,"stem":505,"options":506,"answer":24,"analysis":37},1144954,"关于等步距异节奏流水施工特点的说法，正确的是（ ）。",[507,508,510,511],{"key":20,"text":496,"correct":35},{"key":24,"text":509,"correct":22},"专业工作队数目大于施工过程数目",{"key":27,"text":500,"correct":35},{"key":30,"text":502,"correct":35},{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":526,"analysis":37},1144955,"关于流水施工组织方式的说法，正确的有（ ）。",[516,518,520,522,524],{"key":20,"text":517,"correct":35},"平行施工",{"key":24,"text":519,"correct":35},"依次施工",{"key":27,"text":521,"correct":22},"等节奏施工",{"key":30,"text":523,"correct":22},"异节奏施工",{"key":33,"text":525,"correct":22},"无节奏施工","CDE",{"id":528,"libraryId":5,"type":40,"typeLabel":41,"stem":529,"options":530,"answer":20,"analysis":37},1144956,"流水施工中最常见的一种施工形式是（ ）。",[531,532,534,535],{"key":20,"text":490,"correct":22},{"key":24,"text":533,"correct":35},"有节奏流水施工",{"key":27,"text":484,"correct":35},{"key":30,"text":536,"correct":35},"异节奏流水施工",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":304,"analysis":37},1144957,"下列属于流水施工时间参数的有（ ）。",[541,543,545,547,549],{"key":20,"text":542,"correct":22},"工期",{"key":24,"text":544,"correct":35},"流水段数",{"key":27,"text":546,"correct":22},"流水节拍",{"key":30,"text":548,"correct":22},"流水步距",{"key":33,"text":550,"correct":35},"施工过程数",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":304,"analysis":37},1144958,"属于流水施工时间参数的有（ ）。",[555,556,557,558,559],{"key":20,"text":542,"correct":22},{"key":24,"text":544,"correct":35},{"key":27,"text":546,"correct":22},{"key":30,"text":548,"correct":22},{"key":33,"text":550,"correct":35},{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":224,"analysis":37},1144959,"组织流水施工时，合理划分施工段应遵循的原则有（ ）。",[564,566,568,570,572],{"key":20,"text":565,"correct":35},"施工段的界限与结构界限无关，但应使同一专业工作队在各个施工段的劳动量大致相等",{"key":24,"text":567,"correct":22},"每个施工段内要有足够的工作面，以保证相应数量的工人、主导施工机械的生产效率，满足合理劳动组织的要求",{"key":27,"text":569,"correct":22},"施工段的界限应设在对建筑结构整体性影响小的部位，以保证建筑结构的整体性",{"key":30,"text":571,"correct":35},"每个施工段要有足够的工作面，以满足同一施工段内组织多个专业工作队同时施工的要求",{"key":33,"text":573,"correct":22},"施工段的数目要满足合理组织流水施工的要求，并在每个施工段内有足够的工作面",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":304,"analysis":37},1144960,"下列流水施工参数中，属于时间参数的有（ ）。",[578,579,580,581,582],{"key":20,"text":542,"correct":22},{"key":24,"text":544,"correct":35},{"key":27,"text":546,"correct":22},{"key":30,"text":548,"correct":22},{"key":33,"text":550,"correct":35},{"id":584,"libraryId":5,"type":40,"typeLabel":41,"stem":585,"options":586,"answer":27,"analysis":37},1144961,"下列流水施工参数中，属于空间参数的是（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":35},"流水强度",{"key":24,"text":590,"correct":35},"施工队数",{"key":27,"text":592,"correct":22},"操作层数",{"key":30,"text":550,"correct":35},{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":224,"analysis":37},1144962,"组织流水施工时，划分施工段的主要目的有（ ）。",[598,600,602,604,606],{"key":20,"text":599,"correct":35},"可增加更多的专业队",{"key":24,"text":601,"correct":22},"有利于各专业队在各施工段组织流水施工",{"key":27,"text":603,"correct":22},"有利于不同专业队同一时间内在各施工段平行施工",{"key":30,"text":605,"correct":35},"缩短施工工艺与组织间歇时间",{"key":33,"text":607,"correct":22},"充分利用工作面、避免窝工，有利于缩短工期",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":478,"analysis":37},1144963,"关于组织流水施工所需条件的说法，正确的有（ ）。",[612,614,616,618,620],{"key":20,"text":613,"correct":22},"工程项目划分为工程量大致相等的施工段",{"key":24,"text":615,"correct":22},"工程项目分解为若干个施工过程",{"key":27,"text":617,"correct":35},"组织尽量多的施工队，并确定各专业队在各施工段的流水节拍",{"key":30,"text":619,"correct":22},"不同专业队完成各施工过程的时间适当搭接起来",{"key":33,"text":621,"correct":22},"各专业队连续作业",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":304,"analysis":37},1144964,"组织流水施工时，如果按专业成立专业工作队，则其特点有（ ）。",[626,628,630,632,634],{"key":20,"text":627,"correct":22},"各专业队在各施工段均可组织流水施工",{"key":24,"text":629,"correct":35},"只有一个专业队在各施工段组织流水施工",{"key":27,"text":631,"correct":22},"各专业队可按施工顺序实现最大搭接",{"key":30,"text":633,"correct":22},"有利于提高劳动生产效率和工程质量",{"key":33,"text":635,"correct":35},"同一时间段只能有一个专业队投入流水施工",{"id":637,"libraryId":5,"type":15,"typeLabel":16,"stem":638,"options":639,"answer":224,"analysis":37},1144965,"下列参数中，属于流水施工参数的有（ ）。",[640,642,644,646,648],{"key":20,"text":641,"correct":35},"技术参数",{"key":24,"text":643,"correct":22},"空间参数",{"key":27,"text":645,"correct":22},"工艺参数",{"key":30,"text":647,"correct":35},"设计参数",{"key":33,"text":649,"correct":22},"时间参数",{"id":651,"libraryId":5,"type":40,"typeLabel":41,"stem":652,"options":653,"answer":24,"analysis":37},1144966,"属于流水施工中空间参数的是（ ）。",[654,655,656,657],{"key":20,"text":588,"correct":35},{"key":24,"text":592,"correct":22},{"key":27,"text":590,"correct":35},{"key":30,"text":550,"correct":35},[659,662,665,668,671,674],{"id":40,"name":660,"category":7,"favorite":661},"领导干部任职前廉政法规知识测试题",92,{"id":663,"name":664,"category":7,"favorite":40},595,"建筑结构与设备",{"id":666,"name":667,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":669,"name":670,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":672,"name":673,"category":7,"favorite":8},534,"BIM工程师",{"id":675,"name":673,"category":7,"favorite":8},535]